• Title/Summary/Keyword: mooring system

Search Result 359, Processing Time 0.025 seconds

One year of treating patients with open fractures of the lower extremity in a new military trauma center in Korea: a case series

  • Ji Wool Ko;Giho Moon;Jin Geun Kwon;Kyoung Eun Kim;Hankaram Jeon;Kyungwon Lee
    • Journal of Trauma and Injury
    • /
    • v.36 no.4
    • /
    • pp.376-384
    • /
    • 2023
  • Purpose: The Armed Forces Trauma Center of Korea was established in April 2022. This study was conducted to report our 1-year experience of treating soldiers with open fractures of the lower extremity. Methods: In this case series, we reviewed the medical records of 51 Korean soldiers with open fractures of the lower extremity between April 2022 and March 2023 at a trauma center. We analyzed patients with Gustilo-Anderson type II and III fractures and reported the duration of transportation, injury mechanisms, injured sites, and associated injuries. We also presented laboratory findings, surgery types, intensive care unit stays, hospital stays, rehabilitation results, and reasons for psychiatric consultation. Additionally, we described patients' mode of transport. Results: This study enrolled nine male patients who were between 21 and 26 years old. Six patients had type II and three had type III fractures. Transport from the accident scene to the emergency room ranged from 75 to 455 minutes, and from the emergency room to the operating room ranged from 35 to 200 minutes. Injury mechanisms included gunshot wounds, landmine explosions, grenade explosions, and entrapment by ship mooring ropes. One case had serious associated injuries (inhalation burn, open facial bone fractures, and hemopneumothorax). No cases with serious blood loss or coagulopathies were found, but most cases had a significant elevation of creatinine kinase. Two patients underwent vascular reconstruction, whereas four patients received flap surgery. After rehabilitation, six patients could walk, one patient could move their joints actively, and two patients performed active assistive movement. Eight patients were referred to the psychiatry department due to suicidal attempts and posttraumatic stress disorder. Conclusions: This study provides insights into how to improve treatment for patients with military trauma, as well as medical services such as the transport system, by revising treatment protocols and systematizing treatment.

Long-term and Real-time Monitoring System of the East/Japan Sea

  • Kim, Kuh;Kim, Yun-Bae;Park, Jong-Jin;Nam, Sung-Hyun;Park, Kyung-Ae;Chang, Kyung-Il
    • Ocean Science Journal
    • /
    • v.40 no.1
    • /
    • pp.25-44
    • /
    • 2005
  • Long-term, continuous, and real-time ocean monitoring has been undertaken in order to evaluate various oceanographic phenomena and processes in the East/Japan Sea. Recent technical advances combined with our concerted efforts have allowed us to establish a real-time monitoring system and to accumulate considerable knowledge on what has been taking place in water properties, current systems, and circulation in the East Sea. We have obtained information on volume transport across the Korea Strait through cable voltage measurements and continuous temperature and salinity profile data from ARGO floats placed throughout entire East Sea since 1997. These ARGO float data have been utilized to estimate deep current, inertial kinetic energy, and changes in water mass, especially in the northern East Sea. We have also developed the East Sea Real-time Ocean Buoy (ESROB) in coastal regions and made continual improvements till it has evolved into the most up-to-date and effective monitoring system as a result of remarkable technical progress in data communication systems. Atmospheric and oceanic measurements by ESROB have contributed to the recognition of coastal wind variability, current fluctuations, and internal waves near and off the eastern coast of Korea. Long-tenn current meter moorings have been in operation since 1996 between Ulleungdo and Dokdo to monitor the interbasin deep water exchanges between the Japanese and Ulleung Basins. In addition, remotely sensed satellite data could facilitate the investigation of atmospheric and oceanic surface conditions such as sea surface temperature (SST), sea surface height, near-surface winds, oceanic color, surface roughness, and so on. These satellite data revealed surface frontal structures with a fairly good spatial resolution, seasonal cycle of SST, atmospheric wind forcing, geostrophic current anomalies, and biogeochemical processes associated with physical forcing and processes. Since the East Sea has been recognized as a natural laboratory for global oceanic changes and a clue to abrupt climate change, we aim at constructing a 4-D continuous real-time monitoring system, over a decade at least, using the most advanced techniques to understand a variety of oceanic processes in the East Sea.

A Fundamental Study of VIV Fatigue Analysis Procedure for Dynamic Power Cables Subjected to Severely Sheared Currents (강한 전단 해류 환경에서 동적 전력케이블의 VIV 피로해석 절차에 관한 기초 연구)

  • Chunsik Shim;Min Suk Kim;Chulmin Kim;Yuho Rho;Jeabok Lee;Kwangsu Chea;Kangho Kim;Daseul Jeong
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.60 no.5
    • /
    • pp.375-387
    • /
    • 2023
  • The subsea power cables are increasingly important for harvesting renewable energies as we develop offshore wind farms located at a long distance from shore. Particularly, the continuous flexural motion of inter-array dynamic power cable of floating offshore wind turbine causes tremendous fatigue damages on the cable. As the subsea power cable consists of the helical structures with various components unlike a mooring line and a steel pipe riser, the fatigue analysis of the cables should be performed using special procedures that consider stick/slip phenomenon. This phenomenon occurs between inner helically wound components when they are tensioned or compressed by environmental loads and the floater motions. In particular, Vortex-induced vibration (VIV) can be generated by currents and have significant impacts on the fatigue life of the cable. In this study, the procedure for VIV fatigue analysis of the dynamic power cable has been established. Additionally, the respective roles of programs employed and required inputs and outputs are explained in detail. Demonstrations of case studies are provided under severely sheared currents to investigate the influences on amplitude variations of dynamic power cables caused by the excitation of high mode numbers. Finally, sensitivity studies have been performed to compare dynamic cable design parameters, specifically, structural damping ratio, higher order harmonics, and lift coefficients tables. In the future, one of the fundamental assumptions to assess the VIV response will be examined in detail, namely a narrow-banded Gaussian process derived from the VIV amplitudes. Although this approach is consistent with current industry standards, the level of consistency and the potential errors between the Gaussian process and the fatigue damage generated from deterministic time-domain results are to be confirmed to verify VIV fatigue analysis procedure for slender marine structures.

Analysis on the Movement of Bag-Net in Set-Net by Telemetry Techniques (텔레메트리 기법에 의한 정치망 원통의 거동 해석)

  • 황보규;신현옥;양용림;이주희
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.37 no.1
    • /
    • pp.24-34
    • /
    • 2001
  • The authors reconstruct a mooring type underwater positioning system to measure the movement of bag-net in a set-net by long base line mode with four transponders attached on the bag-net in latitudinal and a transponder fixed on the sea bed. To confirm the practical use of the system, the field experiments were carried out at the Jaran Bay, Kosung, Kyungnam Prov., on October 6, 2000 (neap tide) and November 28, 2000 (spring tide). And the vertical oscillation of bag-net was observed with three data loggers attached on the bottom of bag-net in longitudinal on November 28, 2000. The longitudinal movement range, the latitudinal one and the vertical one of the bag-net were 3.2 m, 3.4 m and 2.1 m. respectively. At the spring tide, these variations were 7.8 m, 7.8 m and 5.0 m, respectively. The vertical oscillation range about the bottom of the bag-net at near point of the slope net, at the middle part and at far point from the slope net were 3.2 m, 3.7 m and 8.4 m, respectively. The depth of the bottom net was decreased and its vertical oscillation appeared frequently when the current speed was more than 10 cm/s and the current direction was significantly different from the longitudinal axis of the bag-net. The variation of hydrophone coordinates measured by the transponder fixed on the sea bed presents that hydrophones equipped to the frame line of the set-net could be moved within several meters due to the tidal current. The fact indicates that the compensation of hydrophone coordinates is necessary to reduce the measuring errors. The position measuring errors of x, y and z axis of the system measured in the cage of aquaculture were 0.6 m, 0.8 m, and 1.2 m, respectively. And the errors of the transponders those were close to the base lines or placed in the baselines were smaller than those of others.

  • PDF

Topology Optimization Application for Initial Platform Design of 10 MW Grade Floating Type Wave-wind Hybrid Power Generation System (10MW급 부유식 파력-풍력 복합발전 시스템 플랫폼 초기설계를 위한 위상최적화 응용)

  • Song, Chang Yong;Lee, Kangsu;Hong, Keyyong
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.3
    • /
    • pp.194-202
    • /
    • 2016
  • This study aims to review a topology optimization based on finite element analysis (FEA) for conceptual design of platform in the 10MW class floating type wave-wind hybrid power generation system (WHPGS). Two topology optimization theories, density method (DM) and homogenization design method (HDM) were used to check which one is more effective for a simplified structural design problem prior to the topology optimization of platform of WHPGS. From the results of the simplified design problem, the HDM was applied to the topology optimization of platform of WHPGS. For the conceptual platform design of WHPGS, FEA model was created and then the structural analysis was performed considering offshore environmental loads at installation site. Hydrodynamics analysis was carried out to calculate pressure on platform and tension forces in mooring lines induced from the offshore environmental loads such as design wave and current. Loading conditions for the structural analysis included the analysis results from the hydrodynamic analysis and the weights of WHPGS. Boundary condition was realized using inertia relief method. The topology optimization of WHPGS platform was performed using the HDM, and then the conceptual arrangement of main structural members was suggested. From the results, it was confirmed that the topology optimization might be a useful tool to design the conceptual arrangement of main structural members for a newly developed offshore structure such as the floating type WHPGS.

A study on the vessel traffic safety assessment of Busan Harbor (부산항내 선박통항 안전성 평가에 관한 연구)

  • KIM, Won-Ouk;KIM, Dae-Hee;KIM, Seok-Jae
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.53 no.4
    • /
    • pp.423-429
    • /
    • 2017
  • As invigoration plan of the marine tourism, Busan City has the plan to operate the cruise ship inside of the harbor, but the area has narrow water way with heavy traffic. As a result it is requested to evaluate the safety for the preparation of actual navigation. In this study, the Ship Handling Simulation (SHS) Assessment was conducted, which is regulated by the Maritime Traffic Safety Audit Scheme (MTSAS) in compliance with the Marine Safety Law and the Maritime Traffic Risk Assessment System based on the Electronic Chart Display and Information System (ECDIS). The proximity assessment, control assessment and subjective assessment were implemented, which is enacted by the Marine Safety Law by using the SHS. In the case of proximity assessment, the probability of trespass was not analyzed. As the control assessment, the swept path was measured at 11.7 m and 11.5 m for port entry and port departure respectively, which exceeded the width of the model vessel, 10.4 m over; it was considered as a marginal factor. As a result of the subjective evaluation of the navigator, there would be no difficulty on ship maneuvering by paying particular attention to the mooring vessel nearby the Busan Bridge and Yeongdo Bridge as well as the coming vessel from the invisible sea area when the vessel is entering and departing the port. The Marine Traffic Risk Assessment System analyzed as [Cautious] level until the vessel passed the Busan bridge and the curved area at 5 kts and it became to [Dangerous] level from where it left 75 m to the Busan Bridge. When the vessel passed the Busan Bridge and the curved area at 10 kts and entered the narrow area, it indicated the [Dangerous] level and became to [Very dangerous] level from where it left 410 m to the Busan bridge. In conclusion, the vessel should maintain at the speed of 5 kts to reduce the risk when it passes this area.

Experimental Study for the Resonance Effect of the Power Buoy Amplitude (공진형 전력부이의 상하변위증폭 효과에 관한 실험적 연구)

  • Kweon, Hyuck-Min;Koh, Hyeok-Jun;Kim, Jung-Rok;Choi, Young-Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.585-594
    • /
    • 2013
  • In this study, laboratory experiments and numerical simulations were conducted to test the performance of resonance power buoy system proposed by Kweon et al.(2010). The system is composed of a linear generator and a mooring buoy. The mover of the linear generator mainly has heave motion driven by vertical oscillation of the buoy. In this system, the velocity discrepancy between the mover and the buoy makes electricity. However, ocean wave energy as a natural resource around Korean peninsula is comparatively small and the driving force for producing electricity is not enough for commercialization. Therefore, it is necessary that the buoy motion be amplified by using resonance characteristics. In order to verify the resonance effects on the test power buoy, the experimental investigations were conducted in the large wave flume (length of 110 m, width of 8 m, maximum depth of 6 m) equipped with regular and random plunger wave generator. The resonance draft of test power buoy is designed for the corresponding period of incident wave, 1.96 sec. Regular wave test results show that the heave response amplitude operator(RAO) by a test buoy has the amplification of 5.66 times higher compared to the wave amplitude at the resonance period. Test results of random waves show that the buoy has the largest spectrum area of 20.73 times higher at the point of not the resonance period but the shorter one of 1.85 sec. Therefore this study suggests the resonance power buoy for wave power generation for commercial application in the case of the coastal and oceanic area with smaller wave energy.

Motion Analysis of Light Buoys Combined with 7 Nautical Mile Self-Contained Lantern (7마일 등명기를 결합한 경량화 등부표의 운동 해석)

  • Son, Bo-Hun;Ko, Seok-Won;Yang, Jae-Hyoung;Jeong, Se-Min
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.5
    • /
    • pp.628-636
    • /
    • 2018
  • Because large buoys are mainly made of steel, they are heavy and vulnerable to corrosion by sea water. This makes buoy installation and maintenance difficult. Moreover, vessel collision accidents with buoys and damage to vessels due to the material of buoys (e.g., steel) are reported every year. Recently, light buoys adopting eco-friendly and lightweight materials have come into the spotlight in order to solve the previously-mentioned problems. In Korea, a new lightweight buoy with a 7-Nautical Mile lantern adopting expanded polypropylene (EPP) and aluminum to create a buoyant body and tower structure, respectively, was developed in 2017. When these light buoys are operated in the ocean, the visibility and angle of light from the lantern installed on the light buoys changes, which may cause them to function improperly. Therefore, research on the performance of light buoys is needed since the weight distribution and motion characteristics of these new buoys differ from conventional models. In this study, stability estimation and motion analyses for newly-developed buoys under various environmental conditions considering a mooring line were carried out using ANSYS AQWA. Numerical simulations for the estimation of wind and current loads were performed using commercial CFD software, Siemens STAR-CCM+, to increase the accuracy of motion analysis. By comparing the estimated maximum significant motions of the light buoys, it was found that waves and currents were more influential in the motion of the buoys. And, the estimated motions of the buoys became larger as the sea state became worser, which might be the reason that the peak frequencies of the wave spectra got closer to those of the buoys.

Report about First Repeated Sectional Measurements of Water Property in the East Sea using Underwater Glider (수중글라이더를 활용한 동해 최초 연속 물성 단면 관측 보고)

  • GYUCHANG LIM;JONGJIN PARK
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.29 no.1
    • /
    • pp.56-76
    • /
    • 2024
  • We for the first time made a successful longest continuous sectional observation in the East Sea by an underwater glider during 95 days from September 18 to December 21 2020 in the Korea along the 106 Line (129.1 °E ~ 131.5 °E at 37.9 °N) of the regular shipboard measurements by the National Institute of Fishery Science (NIFS) and obtained twelve hydrographic sections with high spatiotemporal resolution. The glider was deployed at 129.1 °E in September 18 and conducted 88-days flight from September 19 to December 15 2020, yielding twelve hydrographic sections, and then recovered at 129.2 °E in December 21 after the last 6 days virtual mooring operation. During the total traveled distance of 2550 km, the estimated deviation from the predetermined zonal path had an average RMS distance of 262 m. Based on these high-resolution long-term glider measurements, we conducted a comparative study with the bi-monthly NIFS measurements in terms of spatial and temporal resolutions, and found distinguished features. One is that spatial features of sub-mesoscale such as sub-mesoscale frontal structure and intensified thermocline were detected only in the glider measurements, mainly due to glider's high spatial resolution. The other is the detection of intramonthly variations from the weekly time series of temperature and salinity, which were extracted from glider's continuous sections. Lastly, there were deviations and bias in measurements from both platforms. We argued these deviations in terms of the time scale of variation, the spatial scale of fixed-point observation, and the calibration status of CTD devices of both platforms.

Analyses of Perceptions to Hindering Factors and Development Factors for Water Leisure Activation (수상레저 활성화의 제약요인 및 발전방안에 대한 인식도 조사)

  • Cho, Woo-Jeong;Jang, Bo-Young
    • Journal of Navigation and Port Research
    • /
    • v.37 no.3
    • /
    • pp.291-298
    • /
    • 2013
  • The purpose of this study was to analyze perceptions to hindering factors and development factors for water leisure activation. In order to accomplish the study purpose, this study employed a survey method with water leisure participants and employees from 6 regions(participants=205, employees=117). The data were analyzed using independent t-tests at a=.05 and following findings were derived from current study. First, among 20 hindering factors, water leisure participants had higher levels of perceptions than employees in licence system, limited activation regulation, departure report regulation, absence of exclusive organization, lack of providing information, lack of participative events and support systems. Second, relatively highly perceived hindering factors included departure report regulation, limited activation regulation, licence system, lack of government support, lack of mooring facility and lack of exclusive charged organization, in order. Third, the important development factors perceived by participants included support for licence and education and diversified water leisure programs but those perceived by employees included placement of educated experts and related event host and publicity. Finally, relatively highly perceived development factors included activation of free experience, promotion of marina development, support for licence and education, diversified programs and support for water leisure business. Accordingly, the findings provided fundamental information that both central and regional government can utilize for further activating water leisure. In addition, several development strategies were discussed on financial support, facility support, human resource support, education support and event support perspectives.