This study aimed to resolve issues in performance monitoring of the ecological sector of the Agricultural Environment Conservation Program through a comparative study of domestic ecological monitoring cases and to identify suitable performance monitoring methods for the project. To achieve this objective, current performance monitoring of the Agricultural Environment Conservation Program was compared and analyzed with domestic ecological monitoring cases to examine their applicability. Research results indicate that domestic ecological monitoring covers a wide range, making it difficult to diagnose the ecological environment at the village level. Therefore, it seems challenging to use these data for evaluating the performance of residents' activities. To accurately assess performances of participating villages in the project, on-site monitoring of the target areas is essential. For this purpose, efforts should be focused on strengthening on-site monitoring through the establishment of collaborative systems. However, domestic ecological monitoring can be utilized for long-term performance monitoring in the Agricultural Environment Conservation Program. By extracting necessary data on agricultural areas through geographic information and particularly by utilizing survey results according to the 'cultivated land ecosystem' type, long-term performance of the project could be evaluated. Accordingly, this study can serve as foundational research for establishing an ecological performance monitoring plan and system suited to the project.
Journal of Fisheries and Marine Sciences Education
/
v.20
no.3
/
pp.369-380
/
2008
The government has promoted the local fishing port construction project since 1972 for conquest of the crisis of the fishing village by withering of a fishery, the improvement in fishermen's living environment and quality of life, and promotion of fisheries. In order to estimate the local fishing port construction project objective and synthetically, and to grope for the method proposal of system establishment of the project, the monitoring survey was carried out. The monitoring survey was classified into the program and the performance monitoring. The program monitoring was carried out in order to investigate the project fit for the inhabitants of a fishing village. The performance monitoring was carried out in order to investigate the development latent powers, fishery latent powers, tourism latent powers of a fishing village, rural settlement conditions, etc. using various statistical materials. Since investigating the measured value before executing a policy was not completed, the project effect was compared with the measured value of other areas. According to the local fishing port construction project, the development latent powers, fishery latent powers, and tourism latent powers of the fishing village where the project was undertaken improved greatly, and income of the fishing village increased greatly. As a result of comparing project fit in order to evaluate the project, the project fit of the local fishing port construction project area was higher than the non-project area. Desirable method proposal of monitoring survey was established and the method for raising the efficiency of monitoring survey was extracted.
Objective : This study aimed to investigate the current status of intracranial pressure (ICP) monitoring in patients with severe traumatic brain injury (sTBI) in Korea and the association between ICP monitoring and prognosis. In addition, a survey was administered to Korean neurosurgeons to investigate the perception of ICP monitoring in patients with sTBI. Methods : This study used data from the second Korea Neurotrauma Databank. Among the enrolled patients with sTBI, the following available clinical data were analyzed in 912 patients : Glasgow coma scale score on admission, ICP monitoring, mortality, and extended Glasgow outcome scale score at 6 months. In addition, we administered a survey, entitled "current status and perception of ICP monitoring in Korean patients with sTBI" to 399 neurosurgeons who were interested in traumatic brain injury. Results : Among the 912 patients, 79 patients (8.7%) underwent ICP monitoring. The mortality and favorable outcome were compared between the groups with and without ICP monitoring, and no statistically significant results were found. Regarding the survey, there were 61 respondents. Among them, 70.4% of neurosurgeons responded negatively to performing ICP monitoring after craniectomy/craniotomy, while 96.7% of neurosurgeons responded negatively to performing ICP monitoring when craniectomy/craniotomy was not conducted. The reasons why ICP monitoring was not performed were investigated, and most respondents answered that there were no actual guidelines or experiences with post-operative ICP monitoring for craniectomy/craniotomy. However, in cases wherein craniectomy/craniotomy was not performed, most respondents answered that ICP monitoring was not helpful, as other signs were comparatively more important. Conclusion : The proportion of performing ICP monitoring in patients with sTBI was low in Korea. The outcome and mortality were compared between the patient groups with and without ICP monitoring, and no statistically significant differences were noted in prognosis between these groups. Further, the survey showed that ICP monitoring in patients with sTBI was somewhat negatively recognized in Korea.
New generation of tall and complex buildings systems are now introduced that are reflective of the latest development in materials, design, sustainability, construction, and IT technologies. While the complexity in design is being overcome by the availability and advances in structural analysis tools and readily advanced software, the design of these buildings are still reliant on minimum code requirements that yet to be validated in full scale. The involvement of the author in the design and construction planning of Burj Khalifa since its inception until its completion prompted the author to conceptually develop an extensive survey and real-time structural health monitoring program to validate all the fundamental assumptions mad for the design and construction planning of the tower. The Burj Khalifa Project is the tallest structure ever built by man; the tower is 828 meters tall and comprises of 162 floors above grade and 3 basement levels. Early integration of aerodynamic shaping and wind engineering played a major role in the architectural massing and design of this multi-use tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria established at the onset of the project design. Understanding the structural and foundation system behaviors of the tower are the key fundamental drivers for the development and execution of a state-of-the-art survey and structural health monitoring (SHM) programs. Therefore, the focus of this paper is to discuss the execution of the survey and real-time structural health monitoring programs to confirm the structural behavioral response of the tower during construction stage and during its service life; the monitoring programs included 1) monitoring the tower's foundation system, 2) monitoring the foundation settlement, 3) measuring the strains of the tower vertical elements, 4) measuring the wall and column vertical shortening due to elastic, shrinkage and creep effects, 5) measuring the lateral displacement of the tower under its own gravity loads (including asymmetrical effects) resulting from immediate elastic and long term creep effects, 6) measuring the building lateral movements and dynamic characteristic in real time during construction, 7) measuring the building displacements, accelerations, dynamic characteristics, and structural behavior in real time under building permanent conditions, 8) and monitoring the Pinnacle dynamic behavior and fatigue characteristics. This extensive SHM program has resulted in extensive insight into the structural response of the tower, allowed control the construction process, allowed for the evaluation of the structural response in effective and immediate manner and it allowed for immediate correlation between the measured and the predicted behavior. The survey and SHM programs developed for Burj Khalifa will with no doubt pioneer the use of new survey techniques and the execution of new SHM program concepts as part of the fundamental design of building structures. Moreover, this survey and SHM programs will be benchmarked as a model for the development of future generation of SHM programs for all critical and essential facilities, however, but with much improved devices and technologies, which are now being considered by the author for another tall and complex building development, that is presently under construction.
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.29
no.2
/
pp.217-225
/
2019
Objectives: The aim of this study is to evaluate the quality management systems of domestic asbestos survey and monitoring service providers and the relationships with the number of licenses or designations and sales performances. Methods: Data on quality management systems were collected by assessors who were assigned by the Korea Occupational Safety and Health Agency(KOSHA) during a pilot evaluation program for designated asbestos survey and monitoring service providers in 2016 using evaluation criteria developed by KOSHA. Basic characteristics, evaluated scores, and sales performance were gathered and statistically analyzed. Results: The median and arithmetic mean of the total scores were 0.64 and 0.66. Evaluation fields that scored highly with the highest percentages were sales performance, installation and availability of equipment, compliance with the mandatory minimum number of airborne samples, laboratory independence, and results of proficiency analytical testing, in that order. Evaluation fields that received low marks with the highest percentages were the training of personnel, blank field samples, calibration of flow rates, preliminary check and visual inspection of the work area prior to the clearance test, and review and approval of final reports, in that order. Comparison of normalized scores between service providers registered for asbestos and other tasks and those designated for only asbestos showed significant differences in their evaluated scores. Sales performance did not show a positive correlation with evaluated scores. Conclusions: The quality management systems of domestic asbestos survey and monitoring service providers were poor. High scores were recorded mostly in evaluation fields related to regulatory requirements. Low scores were recorded mostly in evaluation fields related to documentation and recordkeeping. Considering the low influence of quality on sales performance, the government needs to evaluate the quality management of asbestos survey and monitoring service providers and provide the results to public in order to address their low levels of quality management.
Park, Yeong-Sue;Rim, Hyoung-Rae;Lim, Mu-Taek;Koo, Sung-Bon
한국지구물리탐사학회:학술대회논문집
/
2007.06a
/
pp.101-106
/
2007
A time-lapse microgravity survey on a newly widen road at Muan, where limestone cavities are developed, for monitoring the change of the subsurface density distribution before and after grouting. Microgravity monitoring is identified as a quick, easy and cost effective. But, it requires strict data acquisition and quality control due to the differences of conditions at measurements. The survey was carried out two times, that is, October 2005 and September 2006. The data were adjusted for reducing the effects due to the different condition of each survey. The processed data acquired in 2005 and 2006 were inverted into the subsurface density distributions. They show the change and development of density structure during the lapsed time, which implies the effects of grouting.
Inae Yeo;Kwangjin Cho;Yeonsu Chu;Pyoungbeom Kim;Sangwook Han
Journal of Ecology and Environment
/
v.48
no.3
/
pp.395-404
/
2024
Background: In this study, citizen scientists gathered survey data by monitoring inland wetlands, recognized as carbon sinks, and verified the accuracy of the data for incorporation into ecosystem management policies. Results: In October 2022, citizen scientists conducted surveys on three taxonomical groups (plants, mammals, terrestrial insects) in three wetland protection areas. After capturing photographs with location information, these images were uploaded to a national ecological information bank (EcoBank) managed in Korea. The information collected by citizen scientists underwent cross-validation through two expert methods, involving ecology field experts. First, experts conducted a survey of invasive alien plants in the designated areas and compared their findings with those of citizen scientists. The choice of survey locations by citizen scientists was influenced by their proximity to their residences. Second, an expert scrutinized the accuracy of species names collected and uploaded to EcoBank by citizen scientists, presenting their findings. The classification accuracy for species names was 98.8% for vegetation (n = 83), 21.6% for terrestrial insects (n = 21), and 66.7% for mammals (n = 8). These results indicate that citizen scientists may lack detailed classification ability at the species level. Conclusions: Moving forward, it will be imperative to offer diverse forms of education to strengthen the capabilities of the citizen scientists, including sharing wetland survey results to enhance expertise in species identification, creating and distributing educational materials, and providing on-site education through professional surveyors.
The National Ecosystem Survey in Korea provides information to policy makers for preservation of natural environment and implementation of international agreement. The 1st and 2nd National Ecosystem Survey were carried out between 1986 and 1990, and between 1997 and 2005, respectively. The 3rd National Ecosystem Survey began in 2006 and ended in 2012. In 2013 the pilot survey for the 4th National Ecosystem Survey is ongoing. The 4th National Ecosystem Survey due to the revision of the Natural Environment Conservation Act which has been done every 10 years would change into every five years. It is planned to be conducted from 2014 to 2018. The survey method of the 4th National Ecosystem Survey has been modified to obtain more accurate data for many taxa. The survey for a nocturnal animals will be introduced. In addition, monitoring by setting the grid will get quantitative data seasonally. The vegetation survey will be conducted with a mobile device contained files of aerial image maps including classified vegetation map. National Ecosystem Survey will be improved as follows. First, each survey methods suitable for the purpose should be developed. Second, monitoring methods for obtaining quantitative data should be developed. Finally, the research using the data should be developed in the field of not only ecosystem and biological diversity but also habitat assessment.
The program of site survey in western China has been initiated by the National Astronomical Observatories of China(NAOC) toward large telescope facilities. The program is carried out in aspects of remote studies and local surveys. The preliminary results show that the eastern Pamirs and Ali area in Tibet may be the best candidates for further monitoring. The site survey group of NAOC will proceed to set up site testing stations on the selected sites and perform monitoring and campaign in 2005.
Journal of Korean Tunnelling and Underground Space Association
/
v.10
no.4
/
pp.405-420
/
2008
Resistivity survey is one of the widely used methods for the investigation of stability of the ground or bedrock around tunnel and is also used as an essential base data for stability and reduction of construction cost through first-hand approximation of rock quality at design step. Generally, the analysis of resistivity survey data is performed by single measurement. When distribution variation of groundwater around a tunnel over time is necessary for maintenance of a tunnel, resistivity monitoring is very useful survey method to grasp distribution variation of groundwater. So we performed the grid line resistivity survey to monitoring resistivity variation for six times. And we also tried to evaluate application possibility of the resistivity monitoring for construction safety through providing detailed information on fault zones.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.