• Title/Summary/Keyword: modular system

Search Result 1,048, Processing Time 0.029 seconds

Development of a Modular Building System for the BOQ Using Six-sigma (식스-시그마를 이용한 군 독신자 숙소용 모듈러 건축 시스템 개발)

  • Cho, Bong-Ho;Lee, Jae-Sung;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.89-99
    • /
    • 2010
  • Military Barracks and Bachelor Officer's Quarters are public buildings representing architectural characteristics with repeating the same room modules. These buildings require easy dismantling and reusing for the next generation' military re-organization. For these reasons, since 2005, the modular construction has been applied to military buildings. The most important factors required for modular military buildings are standardization, lowcost construction and reusable construction method. However, conventional modular building system have not been matched with these requirements. This study suggests a new modular system for Bachelor Officer's Quarters using Six-sigma design tool. To reflect the voices of customers, market study and surveys were carried out. Through the QFD, the voices of customers were converted into quality characteristics of building system for BOQ. The various design concepts meeting customer's requirement were derived by the QFD and Pugh matrix methodology. The proposed modular building system shows 80% increased factory production rate and 62% decreased weight of steel frame as compared with the conventional modular building system.

Analytical Study on Structural Behaviors of Post-Tensioned Column-Base Connections for Steel Modular Structures (철골 모듈러 구조물의 포스트텐션 기둥-바닥 접합부 거동에 대한 해석적 연구)

  • Choi, Kyung-Suk;Shin, Dong-Hyeon;Kim, Hyung-Joon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.6
    • /
    • pp.427-435
    • /
    • 2020
  • Modular structures are relatively lightweight compared to reinforced-concrete or steel structures. However, it is difficult to achieve structural integrity between the columns of unit modules in a modular structure, which causes undesirable effects on the lateral force resistance capacity against wind and earthquake loads. This is more prominent in modular structures whose overall heights are greater. Hence, a post-tensioned modular structural system is proposed herein to improve the lateral force resistance capacity of a typical modular structure. A post-tensioned column-base connection, which is the main component of the proposed modular structural system, is configured with shapes and characteristics that allow inducing self-centering behaviors. Finite element analysis was then performed to investigate the hysteretic behaviors of the post-tensioned column-base connection. The analysis results show that the hysteretic behaviors are significantly affected by the initial tension forces and beam-column connection details at the base.

Development of an Immersive VR Display System Supporting Continuous Arrangement of Multiple Screens (다중스크린의 연속적인 배치를 지원하는 몰입형 가상환경 디스플레이 시스템의 개발)

  • 남상훈;채영호;강재훈
    • Korean Journal of Computational Design and Engineering
    • /
    • v.7 no.1
    • /
    • pp.18-26
    • /
    • 2002
  • The suggested modular projection system can have flexible arrangements of screens. Modular and continuous arrangements of the display system enable us to modify the screen configuration easily, so that the system can be used in various applications. The image of each screen is calculated automatically by using window projection and the tracked position of the viewer. This system also uses the off-axis stereoscopic projection for the seamless stereoscopic edge blending of multiple connections of screens. The system has been successfully tested for the general navigation model and the CAU driving simulator with motion platform.

To Improve Production Process of the Modular Using the Conveyor System (모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 -)

  • Bae, Byung-Yoon;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.103-112
    • /
    • 2012
  • Republic of Korea is recently becoming an advanced country with increasing standard of living. This is causing a lack of employment in the construction industry because of high labor costs and it is resulting rapid increase in foreign labors. Modular Method of Construction can be defined as 50%~90% of the entire process is completed in factory, and transferred to construction field to install. The main purpose of this process is to minimize the entire process that possibly can be done at construction field in order to maximize the quality. The current local usage of Modular Method of Construction started at Shin Ki Elementary School during 2003 and it is widely used for military facilities. It should be used more because it has strengths of spending short time period to complete and low production costs. It can make a change if Modular Method of Construction is applied. Toyota is currently producing vehicle with conveyor system and if Modular Method of Construction is applied, then it is possible to reduce the waste of labor, and automatic production time. Expansion of the modular Market can be expected by applying this method because it will improve producing costs, high quality, and enforced process. This research tried to solve the problem of factory's manufacturing production by applying local Modular Method of Construction to provide suggestions and analyze the profitability with applied conveyor system. It is depending on produced model, but this research's model will take 20 months including assessment of payback period.

A new design concept for ocean nuclear power plants using tension leg platform

  • Lee, Chaemin;Kim, Jaemin;Cho, Seongpil
    • Structural Engineering and Mechanics
    • /
    • v.76 no.3
    • /
    • pp.367-378
    • /
    • 2020
  • This paper presents a new design concept for ocean nuclear power plants (ONPPs) using a tension leg platform (TLP). The system-integrated modular advanced reactor, which is one of the successful small modular reactors, is mounted for demonstration. The authors define the design requirements and parameters, modularize and rearrange the nuclear and other facilities, and propose a new total general arrangement. The most fundamental level of design results for the platform and tendon system are provided, and the construction procedure and safety features are discussed. The integrated passive safety system developed for the gravity based structure-type ONPP is also available in the TLP-type ONPP with minor modifications. The safety system fully utilizes the benefits of the ocean environment, and enhances the safety features of the proposed concept. For the verification of the design concept, hydrodynamic analyses are performed using the commercial software ANSYS AQWA with the Pierson-Moskowitz and JONSWAP wave spectra that represent various ocean environments and the results are discussed.

Implementation of Modular Neural Net for Fault Diagnosis in Power System (전력 계통 사고구간 판정에의 모듈형 신경 회로망의 구현)

  • Kim, Kwang-Ho;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 1989.11a
    • /
    • pp.224-227
    • /
    • 1989
  • In this paper, The implementation of modular neural net for fault diagnosis in power system is presented. Until now, there have been many researches on expert system for fault diagnosis. On expert system, a lot of time for searching goal is needed. But, neural net processes with high speed, as it has parallel distributed processing structure. So neural net has good performance in on-line fault diagnosis. For fault diagnosis in large power system, the constitution of modular neural net with partition of large power system is presented.

  • PDF

Wireless Parallel Operation of a Three-phase Modular UPS Inverter using Resistive Droop Control (저항성 수하 제어를 적용한 3상 모듈형 UPS 인버터의 비통신선 방식 병렬 운전)

  • Kim, Seon-Tae;Ji, Jun-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.10
    • /
    • pp.1672-1681
    • /
    • 2016
  • This paper proposes a wireless parallel operation method of three-phase modular UPS inverter using resistive droop control. Furthermore, it applies a virtual resistor to droop control so that the output impedance of UPS inverter gets closer to resistive. It makes resistive droop control effective. The simulation using PSIM was performed in order to verify the validity of proposed algorithm. After consisting two-parallel system with three-phase modular UPS inverter, the experiment according to resistive load was conducted. It demonstrated the performance of current sharing and power sharing.

Eigen-analysis of SSR in Power Systems with Modular Network Model Equations (Modular 네트워크 모델 구성에 의한 전력계통 SSR 현상의 고유치해석)

  • Nam, Hae-Kon;Kim, Yong-Gu;Shim, Kwan-Shik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.10
    • /
    • pp.1239-1246
    • /
    • 1999
  • This paper presents a new algorithm to construct the modular network model for SSR analysis by simply applying KCL to each node and KVL to all branches connected to the node sequentially. This method has advantages that the model can be derived directly from the system data for transient stability study and turbine/generator shaft model, the resulted model in the form of augmented state matrix is very sparse, and thus efficient SSR study of a large scale system becomes possible. The proposed algorithm is verified with the IEEE First and Second Benchmark models.

  • PDF

The Study on the Activation of Domestic Co-Housing Module Application (국내 공동주택 모듈러 적용 활성화에 관한 연구)

  • Kim, Chung-Hee;Shim, Un-Jun;Ahn, Yong-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.141-142
    • /
    • 2013
  • The modular construction method have improved quality, reduction of defects, such as the reduction of air, a number of advantages. It is utilized composite, larger, in skyscraper building already abroad. The domestic, various studies have been conducted on technical matters taller, automation of production, such as process control, but is still inadequate circumstances. Therefore, in this study, is the purpose that you have presented activation measures to investigate and analyze the case of co-housing with a modular construction system of outside, and to make the co-housing of modular construction system of domestic.

  • PDF

A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing (유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Chae, Myung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF