• 제목/요약/키워드: model project

검색결과 4,013건 처리시간 0.032초

소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구 (A Study on the Integrated Conceptual Model of Software Development Project Management System)

  • 문용은;이재범
    • Asia pacific journal of information systems
    • /
    • 제6권1호
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

제품개발 프로젝트관리 프로세스 개발 (Development of Project Management Process for Product Development)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

연구과제 선정.평가 체계설계에 관한 연구 (Project Selection & Evaluation System Design and Implementation-Literature Review and Case Study-)

  • 용세중;최덕출;한종우;정용훈;이원영
    • 기술혁신연구
    • /
    • 제2권1호
    • /
    • pp.116-141
    • /
    • 1994
  • This paper presents a model for R&D project selection and evaluation system design developed through literature review. The model emphasizes the fitness between the five elements of the system : evaluation phase and purpose, personnel and organization, evaluation critiria and decision model, evaluation form and procedure, and projects. The model was applied in real situation as a test case. The important findings are that a good project selection and evaluation model contributes only partially to the effectiveness of the project selection and that system development and implementation activity is a dynamic and multi-facetted learning process.

  • PDF

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

SI 프로젝트관리 프로세스 개발 (Development of Project Management Process for System Integration)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제35권3호
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

정보시스템 프로잭트의 선택원리 (A Model for Project Selection of Information System)

  • 지원철
    • 한국경영과학회지
    • /
    • 제10권1호
    • /
    • pp.79-83
    • /
    • 1985
  • This purpose of this study is to suggest a tentative model for project selection of information system. In constructing a mathematical model, quantification of decision criteria is tried to lessen difficulties of measuring benefits of information system project. Suggested model enables us to select projects in the context of portfolio and information system policy.

  • PDF

대학의 UCC 프로젝트 교수·학습 모형 개발 및 적용 (University's the UCC Project Teaching and Learning Model Development and its Application)

  • 권명순;간진숙
    • 수산해양교육연구
    • /
    • 제25권4호
    • /
    • pp.937-957
    • /
    • 2013
  • This study was conducted for the purpose of developing the UCC project teaching and learning model based on the rationale which are applicable effectively in the field of university education. Firstly, we have designed the rationale based on the research of documents and preceding researches about teaching method models. Secondly, we have developed the UCC project teaching and learning model. the UCC project teaching and learning model based on the rationale was assessed by the professional formative evaluation group and tested in the field of university education in advance and thereafter. It was finally rectified and supplemented. Particularly, any corrections were to be made repeatedly in the stage of developing of the UCC project. And also, during the assessment and arrangement process, it was designed for the study participants to feel a sense of achievement as learners who combine knowledge and attitudes toward participants'subjects of the curriculum and professional vocational skills by performing the nursing science training scene which could happen in the field. Thirdly, the final version of the UCC project teaching and learning model was verified in its effectiveness by being applied in the field of the nursing science education in the $2^{nd}$ step. As a result, we noticed that learners diverse abilities were improved through systemic process and performing elements such as teaching plan which was needed for designing the UCC project in the field, making storyboard and skills for making video contents. We hope that the UCC project teaching and learning model in this study will be used by the students for designing, developing and utilizing educational UCCs which are necessary in industrial fields and it will contribute for training university students as professionals having the practical skills in the field.

공학중심의 융합프로젝트 교수학습모형의 교육적 효과 (Educational Effects of an Instructional Model for Engineering-Centered Convergence Project)

  • 최지은;진성희;김학일
    • 공학교육연구
    • /
    • 제21권1호
    • /
    • pp.3-13
    • /
    • 2018
  • The purpose of this study is to propose a teaching and learning model that can effectively manage convergence education, which is one of the concerns of university education, at the level of course. The pre-collaborative instructional design stage is to prepare the operation of the convergence project course. It shares the common goal and establishes a team of relevant professors to set up the actual convergence project topic and establishes cooperation relationships with industry or community as needed. In the convergence project activity, students will be able to understand the learning objectives, learning activities, evaluation methods, and explain the subject of the convergence project by proceeding with the whole orientation. Students organize teams of interest and conduct learning and design activities on convergence technologies and present their results. In the educational improvement activities, professors will share the lesson process and results and discuss improvements through the improvement seminar. As a result of analyzing the effectiveness of the proposed convergence project based teaching and learning model, the convergence project experience has improved the cooperative self - efficacy for the learners and the results were confirmed that students perceived to achieve the expected learning goal and satisfied with their experience.