ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

도로소음의 3차원 소음예측모델 적용방안 마련 (Preparation of Application Plan for 3-d Noise Prediction Model in Road Noise)

  • 선효성
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2014년도 추계학술대회 논문집
    • /
    • pp.842-843
    • /
    • 2014
  • When the environmental impact assessment (EIA) of an development project is performed, the noise prediction model is used to evaluate the noise impact and prepare the noise reduction measures according to the implementation of an development project. Especially, the application of a 3-d noise prediction model is increased to describe the complex noise environment including high-rise living accommodations. Therefore, this paper suggests the application plan of a 3-d noise predicton model for the road noise impact assessment of a development project.

  • PDF

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

3D Earthwork BIM Design Process for a Road Project

  • Raza, Hassnain;Park, Sang-Il;Lee, Seung Soo;Tanoli, Waqas Arshad;Seo, Jongwon
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.8-15
    • /
    • 2017
  • Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

도로사업의 PI에 관한 주민의식 평가 (Evaluation of Consciousness on Public Involvement of Road Project)

  • 김현;권영인;정병두;이선하
    • 대한교통학회지
    • /
    • 제24권3호
    • /
    • pp.73-83
    • /
    • 2006
  • 본 연구에서는 서울외곽순환고속도로의 사패산 사업을 대상으로 행정측의 불신감, 도로사업의 이해도, 주민참여의 만족도, 그리고 새로운 주민참여제도에 대한 이해도와 참가의도 등의 의식에 초점을 두고 있다. 이러한 의식의 변수와 사패산 도로사업의 수용의식에 관한 주민의식 평가 인과구조 가설을 설정하고 공분산구조방정식을 이용하는 주민의식 평가 방법론과 그 적용에 대해 검토하고 있다. 그 결과 사패산 도로사업의 수용의식 평가에 있어 행정 불신감이 강한 장해요인이며, 도로사업의 이해도와 새로운 주민참여제도의 이해도는 긍정적인 영향을 미치는 촉진요인으로 작용하고 있다 것을 확인하였다.

대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크 (Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work)

  • 곽수남;김두연;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.607-612
    • /
    • 2007
  • 사업 초기 단계에서의 정확한 공사비 예측은 각각의 대안을 비교하여 향후 공사비에 대한 정보를 제공함으로써 효율적인 예산수립을 가능하게 한다. 하지만 사업 초기 단계에는 공사비 산정 기준이 모호하고 가용 정보가 부족함에 따라 공사비 예측에 한계가 나타난다. 더욱이 현행 공사비 산정모델이 단위 길이당 공사비를 활용한 선형적이고 단순한 모델을 활용함에 따라 예측의 정확도에 한계를 가지고 있다. 따라서 본 연구에서는 기존 공사비 산정모델의 한계를 개선하고 사업 초기 단계에서 가용한 데이터를 활용할 수 있는 공사비 산정 모델의 Framework를 구축하고자 한다. 이를 위하여 본 연구에서는 국내외 개략공사비 산정 모델을 분석하였으며, 기존 도로공사의 공사비 분석자료를 토대로 노선선정 등 사업초기 단계에서 활용 가능한 도로공사 개략공사비 산정모델의 Framework를 제시하였다.

  • PDF

A Portfolio Model for National IT R&D Strategy Project Selection Methods

  • Ryu, Dong-Hyun;Lee, Woo-Jin
    • Journal of information and communication convergence engineering
    • /
    • 제9권5호
    • /
    • pp.491-499
    • /
    • 2011
  • In this paper, we offer a new strategic portfolio model for national IT R&D project selection in Korea. A risk and return (R-R) portfolio model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R portfolio model to solve the non-strategy and subjectivity problems of the existing national R&D project selection model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technical level reports (TLR) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic portfolio project and balancing the allocation of resources effectively and objectively.

시뮬레이션을 이용한 도로포장 공정계획의 수립방안 (An Application of Simulation Method to Planning of Road Pavement Operation)

  • 온성원;김옥기;우성권
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.124-131
    • /
    • 2007
  • 공정관리는 일정 계획에 따라 공사의 진도를 관리하는 것뿐만 아니라 프로젝트를 주어진 공기 내에 완성하기 위하여 시공 방법 및 계획을 마련하고 이에 따른 장비, 자재, 인원 등에 대한 계획을 수립하는 것을 포함한다. 본 연구는 실제 고속도로 건설공사 중 포장공정의 계획 수립에 있어서 린 콘크리트 포장작업과 콘크리트 슬래브 포장작업을 대상으로 시뮬레이션 모델을 개발하고 이를 이용하여 공정계획을 수립하는 방안을 제시하고 있다. 또한, 시뮬레이션 모델을 이용하여 수립된 계획과 해당 현장의 기존 포장공정 계획을 비교함으로서 비용과 공기 측면에서 보다 생산적이고 효율적인 대안의 수립에 시뮬레이션 기법이 효과적인 방법론이 될 수 있음을 보여 준다. 결국, 본 연구를 통해 건설공사의 시공 계획을 수립하는 초기단계에서 시뮬레이션 모델을 구축하여 체계적이고 과학적인 분석을 수행하게 되면 보다 효율적이고 생산적인 건설공정 계획 및 관리가 가능하다는 사실을 확인하고 있다.

강원도 어도의 설치 현황 및 I형 아이스하버식 어도 적용성 연구 (Establishment present of fish-road in Kangwondo and Study to apply fish-road is ice harbor 1-type)

  • 최한규;최영수;전영수
    • 산업기술연구
    • /
    • 제26권B호
    • /
    • pp.63-71
    • /
    • 2006
  • The concerned object of the construction industry is environment. It is one of the main purposes of today's construction that human can live reasonably in nature. This study is about the fish-road connecting hydraulic structure in the river with nature. Chapter 2, starting with the general investigation about fish-road and helps comprehension for relatively general fish-road such as necessity, establishment purpose, history, study example, relating domestic law, design condition, consideration and form of fish-road. Chapter 3, containing the present condition of fish-road facilities in Gangwon-Do and thoughts of the problems and general countermeasures of existing fish-road. Chapter 4, Having Examined compatibility by amount of flowing water through hydraulic model test in the Ice harbor I-type model. chapter 5, Analyzation and arrangement to efficient establishment plan of fish-road and the result of the hydraulic model experiment to be beaconed a little in forward fish-road study. In the hydraulic model test result, when we suppose establishment of 1~3 in slope of 1/20, could know that applicable drought flow of the river is $0.06{\sim}3.0m^3/sec$ in case of Ice harbor I-type which transforming Ice harbor that was invented as studying project of the Ministry of Environment.