• Title/Summary/Keyword: missing roadbed

Search Result 2, Processing Time 0.02 seconds

A Study on the Sensing System Construction of a Missing Roadbed (철도 노반유실검지시스템 구축에 관한 연구)

  • Kim, Ki-Young;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.461-470
    • /
    • 2009
  • A railroad has a benefit of the mass transportation of a passenger and cargo, but just a time of accident could cause a huge loss of a human life and property. Especially, a typhoon and a localized torrential downpour usually happened in summer season have caused average 38.29 times of the missing roadbed which support the railroad in recent 7 years. If a train would pass on this railroad which the roadbed was missed, there could be a huge accident and many people will die. But, the security issue is not satisfied because the method of sensing the missing roadbed is depending solely on the naked eye inspection by a person in charge. So, in this study, I would like to suggest the missing roadbed real-time sensing and train operation system to reduce the possibility of the railroad accident by controlling the operation of train when the missing roadbed condition would be sensed in the real-time system.

  • PDF

Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans (철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안)

  • Ko, Sewon;Yu, Youngsu;Koo, Bonsang;Kim, Jihwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.46-53
    • /
    • 2022
  • The railway platform is an important facility closely related to the safety of passengers, trains, and images of railway facilities, and requires thorough facility management. However, the problem that the finishing material (plastering mortar) for the joint finishing of dissimilar materials (concrete+granite) falls off in the direction of the track at the platform podium is occurring multiple times across the country. Since these problems threaten the safety of train operation and the safety of passengers, immediate and continuous management is required. This study tried to derive improvement plans through the analysis of the drop-off problem of finishing materials occurring at the platform podium. The status of missing finishing materials for the platform podiums of about 200 railway stations and the related design and construction standards of the Korea National Railway were investigated. After that, the cause of the drop-off of the finishing material was analyzed, and as a result, it was found that the main cause was the boundary between the roadbed and the architectural process that occurred during construction. Subsequently, in connection with the derived causes and design, construction standards, (1) improvement of finishing materials or construction methods, (2) design of finishing materials that are easy to adjust height, (3) design of separate finishing methods, (4) improvement methods and durability were suggested.