• Title/Summary/Keyword: minimum-cost

Search Result 1,410, Processing Time 0.033 seconds

An Analysis of the Cost Structure of Air Transport Industry(Deriving Economies of Density, Scale and Scope) (항공운송산업의 비용구조 분석(밀도, 규모 및 범위의 경제성 도출을 중심으로))

  • Kim, Min-Jeong;Kim, Je-Cheol
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.3 s.89
    • /
    • pp.143-153
    • /
    • 2006
  • This paper annually estimates the economies of density, scale and scope with the data of cost and output of 27 leading air carriers to suggest the political findings and strategies of raising the cost efficiency of our air transport industry. The estimation results and their implications are as follows. First, KAL and Aha would reduce their cost if they could increase international route density. Second, KAL and AAR would reduce their cost if they could expand the network but save their cost more effectively if they could increase international route density rather than expand the network. Third, the minimum efficient scale that minimize average cost of two national flag carriers which operate by the present output ratio among domestic passenger, international passenger and freight appears to be larger than each present output level of KAL and AAR. Meanwhile, it appears that minimum efficient scale of small size low cost carriers which operate domestic-oriented route is much smaller than minimum efficient scale of national flag carriers. Finally, it appears that there exists the diseconomies of scope between domestic passenger and the other outputs, that is, international passenger and freight and therefore save their cost if freight output ratio is higher and domestic passenger output ratio is lower than the Present level.

DEVELOPMENT OF A COMPUTER PROGRAM FOR AN ANALYSIS OF THE LOGISTICS AND TRANSPORTATION COSTS OF THE PWR SPENT FUELS IN KOREA

  • Cha, Jeong-Hun;Choi, Heui-Joo;Lee, Jong-Youl;Choi, Jong-Won
    • Journal of Radiation Protection and Research
    • /
    • v.34 no.1
    • /
    • pp.1-7
    • /
    • 2009
  • It is expected that a substantial amount of spent fuels will be transported from the four nuclear power plant (NPP) sites in Korea to a hypothetical centralized interim storage facility or a final repository in the near future. The cost for the transportation is proportional to the amount of spent fuels. In this paper, a cost estimation program is developed based on the conceptual design of a transportation system and a logistics analysis. Using the developed computer program, named as CASK, the minimum capacity of a centralized interim storage facility (CISF) and the transportation cost for PWR spent fuels are calculated. The PWR spent fuels are transported from 4 NPP sites to a final repository (FR) via the CISF. Since NPP sites and the CISF are located along the coast, a sea-transportation is considered and a road-transportation is considered between the CISF and the FR. The result shows that the minimum capacity of the interim storage facility is 15,000 MTU.

The Possible Minimum Chicken Nutrient Requirements for Protecting the Environment and Improving Cost Efficiency - Review -

  • Nahm, K.H.;Carlson, C.W.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.11 no.6
    • /
    • pp.755-768
    • /
    • 1998
  • Nitrogen and phosphorus are major nutrients in animal feeds which partially remain in the environment as pollution. In addition, nitrogen and phosphorus along with energy are the main nutrients which determine the feed cost. Any decreases in the levels of these three nutrients can contribute to reducing the pollution problem as well as the cost of feed. The nutrient requirements for chickens in the work here reported should allow for the addition of mixed enzymes (phytases, proteases, glucanases, xylanases and others). Such minimal levels of crude protein in the research results which are here reported are 16% for 0-6 weeks of age, 13.5% for 7-12 weeks of age, 11.5% for 13-18 weeks of age for layer type chicks, 13% for layer, 18% for 0-3 weeks of age broiler and 16.5% for 4-7 weeks of age broiler. These research projects have been done without adding enzyme supplements to their experimental diets. The minimal values of phosphorus, shown as available phosphorus, are 0.25% for pullets, 0.09% for layers and 0.25% for broilers with the addition of phytase. The minimum energy requirement (metabolizable energy) for reducing the feed cost could be summarized as 2,750 kcal per kg feed for pullets, 2,800 kcal for layers and 2,700 kcal for broilers.

Minimum cost strengthening of existing masonry arch railway bridges

  • Rafiee, Amin
    • Structural Engineering and Mechanics
    • /
    • v.75 no.2
    • /
    • pp.271-282
    • /
    • 2020
  • The preservation of historic masonry-arch railway bridges is of paramount importance due to their economic benefits. These bridges which belong to past centuries may nowadays be expected to carry loads higher than those for which they were designed. Such an increase in loads may be because of increase in transportation speed or in the capacity of freight-wagons. Anyway, adequate increase in their load-carrying-capacity through structural-strengthening is required. Moreover, the increasing costs of material/construction urge engineers to optimize their designs to obtain the minimum-cost one. This paper proposes a novel numerical optimization method to minimize the costs associated with strengthening of masonry-arch railway bridges. To do so, the stress/displacement responses of Sahand-Goltappeh bridge are assessed under ordinary train pass as a case study. For this aim, 3D-Finite-Element-Model is created and calibrated using experimental test results. Then, it is strengthened such that following goals are achieved simultaneously: (1) the load-carrying-capacity of the bridge is increased; (2) the structural response of the bridge is reduced to a certain limit; and, (3) the costs needed for such strengthening are minimized as far as possible. The results of the case study demonstrate the applicability/superiority of the proposed approach. Some economic measures are also recommended to further reduce the total strengthening cost.

Design of Ring Topology for Local Access Computer Networks with mean delay time constraint (평균 지연 시간의 제약조건을 갖는 로컬 액세스 컴퓨터 네트워크에서의 링 토폴로지 설계)

  • 이용진;김태윤
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.19 no.7
    • /
    • pp.1390-1406
    • /
    • 1994
  • This study deals with the DMCLP(Delay constrained Minimum Cost Loop Problem)-one of problems arising in the design of local access computer networks. The problem consists of finding a set of rings to satisfy the traffic requirements of end user terminals. In the problem, the objective is to minimize the total link cost. This paper presents heuristic algorithm which consists of two phases for this problem, under the constraints that the number of nodes served by a single ring is limited and network mean delay is dropped within the desired time. The algorithm is derived using the clusters obtained by the existing MCLP(Minimum Cost Loop Problem) algorithm and a trade-off criterion explained in the paper. Actually, simulation results in that the proposed algorithm in this paper produces better solution than the existing MCLP algorithm modified. In addition, the algorithm has the relatively short running time.

  • PDF

IMF 구제금융 전후의 최저임금 인상과 고용변화에 관한 실증연구 -미국과 한국의 패스트푸드 산업의 사례분석-

  • 김종권
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.117-127
    • /
    • 2004
  • In U.S.A., minimum wage of New Jersey in April 1, 1992 rose from $4.25 to $5.05. At this assession, there was survey by 410 numbers related back and pro minimum wage in New Jersey and eastern Pennsylvania.. At stores of New Jersey and eastern Pennsylvania, comparison of the increase of employment at constant minimum wag is with estimative effect of increase of minimum wage. Through comparison of stores of low wage and high wage above $5, employment volatility in New Jersey was studied. In U.S.A., increase of minimum wage was not caused to reduce to employment. Contrary to this, result of Korea was not consisted after timing of IMF bailout of 1997. It is because drop of revenue was caused to decrease employees of part-time and full-time job at the viewpoint of cost minimization.

  • PDF

Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges (장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델)

  • 조효남;임종권
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

Cost Effectiveness of Bse-Isolation for Bridges in Low and Moderate Seismic Region (중저진 지역에서의 지진격리교량의 경제적 효율성에 관한 연구)

  • 고현무
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.04a
    • /
    • pp.178-185
    • /
    • 1999
  • Minimum life-cycle cost helps to evaluate cost effectiveness of base-isolated bridges under specific condition. Life-cycle cost mainly consists of the initial construction cost and the expected damage cost. Damage cost estimation needs proper model of input ground motion failure probability evaluation method and limit states definition. We model the input ground motion as spectral density function compatible with the response spectra defined at each seismicity and site condition. Spectrum analysis and crossing theory is suitable for reseating calculation of failure probabilities in the process of cost minimization. Limit states of base-isolated bridges re defined for superstructure isolator and pier respectively The method is applied to both base-isolated bridges and conventional bridges under the same conditions to investigate cost effectiveness of base isolation in low and moderate seismic region. the results show that base-isolation of bridges are more effective in low and moderate seismic region and that the site effects on the economical efficiency may not be negligible in such a region.

  • PDF