Mohamed Murshid Shamsuddeen;Duc Anh Nguyen;Jin-Hyuk Kim
New & Renewable Energy
/
v.20
no.1
/
pp.116-125
/
2024
Ultra-low-head is an unexplored classification among the sites in which hydroelectric power can be produced. This is typically owing to the low power output and the economic value of the turbines available in this segment. A turbine capable of operating in an ultra-low-head condition without the need of a dam to produce electricity is developed in this study. A gate structure installed at a shallow water channel acting as a weir generates artificial head for the turbine mounted on the gate to produce power. The turbine and generator are designed to be compact and submersible for an efficient and silent operation. The gate angle is adjustable to operate the turbine at varying flow rates. The turbine is designed and tested using computational fluid dynamics tools prior to manufacturing and experimental studies. A parametric study of the runner blade parameters is conducted to obtain the most efficient blade design with minimal hydraulic losses. These parameters include the runner stagger and runner leading edge flow angles. The selected runner design showed improved hydraulic characteristics of the turbine to operate in an ultra-low-head site with minimal losses.
The Transactions of the Korean Institute of Power Electronics
/
v.12
no.3
/
pp.221-233
/
2007
In this paper, a simple but effective position profile generation algorithm for single axis high dynamic linear machine drive system is presented. In the recent industrial application fields like as LCD/PDP and semiconductor factory, requirements for the high performance positioning system with optimal position profile generator are highly increased to reduce the overall processing time. There might be various solutions for position profile generating algorithm according to the application type. A square-wave Impact quantity(Jerk) based algorithm with minimal locomotion time is argued in this paper to minimize the total time of one movement under some specific constrains such as maximum speed limit and maximum acceleration limit. In order to reduce the calculation efforts and satisfy the minimal locomotion time condition, the time variants representing each profile sector and a simple condition comparison algorithm are adopted. Also, the actual implementation method for profile generation algorithm and it's real performance results are presented through commercial linear machine drive system.
The set D of column vectors of a generator matrix of a linear code is called a defining set of the linear code. In this paper we consider the problem of constructing few-weight (mainly two- or three-weight) linear codes from defining sets. It can be easily seen that we obtain an one-weight code when we take a defining set to be the nonzero codewords of a linear code. Therefore we have to choose a defining set from a non-linear code to obtain two- or three-weight codes, and we face the problem that the constructed code contains many weights. To overcome this difficulty, we employ the linear codes of the following form: Let D be a subset of 2n, and W (resp. V ) be a subspace of 2 (resp. 2n). We define the linear code D(W; V ) with defining set D and restricted to W, V by $${\mathcal{C}}_D(W;V )=\{(s+u{\cdot}x)_{x{\in}D^{\ast}}|s{\in}W,u{\in}V\}$$. We obtain two- or three-weight codes by taking D to be a Vasil'ev code of length n = 2m - 1(m ≥ 3) and a suitable choices of W. We do the same job for D being the complement of a Vasil'ev code. The constructed few-weight codes share some nice properties. Some of them are optimal in the sense that they attain either the Griesmer bound or the Grey-Rankin bound. Most of them are minimal codes which, in turn, have an application in secret sharing schemes. Finally we obtain an infinite family of minimal codes for which the sufficient condition of Ashikhmin and Barg does not hold.
Effects of coolant pre-cooling and fuel pre-heating on the performance of a combined cycle using a F-class gas turbine were investigated. Coolant pre-cooling results in an increase of power output but a decrease in efficiency. Performance variation due to the fuel pre-heating depends on the location of the heat source for the pre-heating in the bottoming cycle (heat recovery steam generator). It was demonstrated that a careful selection of the heat source location would enhance efficiency with a minimal power penalty. The effect of combining the coolant pre-cooling and fuel pre-heating was also investigated. It was found that a favorable combination would yield power augmentation, while efficiency remains close to the reference value.
This paper presents the dynamic excitation control of a siphon-turbine coupled pico-hydro powered cage rotor induction generator and load matching for off-grid electricity generation. Through the proposed dual-role of the current-controlled voltage source converter (VSC), acting as static synchronous compensator and load controller, real and reactive power are dynamically controlled in a decoupled manner with a self supported DC-bus. The proposed scheme entails minimal computation for ensuring the rated (set) capacity of real power. The scheme also exhibits fault immunity for protection, thus enabling the effective handling of constant power electrical loads presented by base telecom station towers in remote locations. The performance of the system is evaluated under MATLAB/Simulink and is experimented through a developed hardware prototype. Simulation and experimental results show close conformity and validate the effectiveness of the proposed scheme.
The purpose of this paper is to describe the structure of the rings $\mathbb{Z}_{p^2}[X]/({\alpha}(X))$ with ${\alpha}(X)$ a monic polynomial and $\={X}^{\kappa}=0$ for some nonnegative integer ${\kappa}$. Especially we will see that any ideal of such rings can be generated by at most two elements of the special form and we will find the 'minimal' set of generators of the ideals. We indicate how to identify the isomorphism types of the ideals as $\mathbb{Z}_{p^2}-modules$ by finding the isomorphism types of the ideals of some particular ring. Also we will find the annihilators of the ideals by finding the most 'economical' way of annihilating the generators of the ideal.
A multi-parameter neuro muscular electrical simulator (NMES) system was developed to be used to find the optimal parameter condition in obtaining maximum muscle power and minimal fatigue. Since the performance of NMES is mainly determined by the characteristic of its output-stage circuit, we implemented 3 different circuits and compared output characteristics of them. Three amplifier circuits are; 1) a resonant switching converter, 2) a linear amplifier with a transformer, and 3) a step-up DC/DC converter with a high-voltage linear amplifier. Experimental results showed that the step up DC/DC converter with a high-voltage linear amplifier has the best performance.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.5
/
pp.517-523
/
1999
The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.
Let f : X → Y be a map between simply connected CW-complexes of finite type with X finite. In this paper, we prove that the rational cohomology of mapping spaces map(X, Y ; f) contains a polynomial algebra over a generator of degree N, where N = max{i, πi(Y)⊗ℚ ≠ 0} is an even number. Moreover, we are interested in determining the rational homotopy type of map(𝕊n, ℂPm; f) and we deduce its rational cohomology as a consequence. The paper ends with a brief discussion about the realization problem of mapping spaces.
The distribution of procymidone in a small vinyl house containing cucumber plants or mimic plants was investigated after application of smoke generator. The deposition of procymidone on glass plate and filter paper was significantly similar to that on cucumber leaves, so that glass plate and filter paper could be substituted for cucumber leaves on deposition studies. The deposition of procymidone was proportional to the horizontally projected area of surface; the deposition on the horizontal surface was maximal, and the deposition was minimal for the perpendicular surface. The amount of deposition on the backside of leaf was less than 5% compared to that on the horizontal surface of leaf. The height of leaf from the floor was not a significant factor influencing on the deposition of procymidone whether leaves were overlapped or not. However, the deposition of procymidone on the overlapped leaves was relatively less than that on the unoverlapped leaves. And the deposition difference depending on the distance between leaves was not observable. Overall, the deposition of procymidone was proportionally increased with the application rate of smoke generator, but the deposition was inversely related to the sum of the total horizontal leaf area of mimic plants and the surface area of floor.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.