• Title/Summary/Keyword: mid-long term plan

Search Result 155, Processing Time 0.033 seconds

A study on the mid-term and long-term R&D planning of public corporation (공기업의 중장기 연구개발계획 수립에 관한 연구)

  • 남보우
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.454-457
    • /
    • 1996
  • In this paper, a two-stage and top-down approach of mid-term and long-term R&D planning of public corporation is proposed to incorporate some characteristics of public corporation and to overcome the complexity of the real world planning. Unlikely to R&D planning of private company, the total investiment size of public corporation is institutionally determined. A top-down approach is developed to adopt this feature. The proposed approach has two stages to overcome the complexity. In the first stage, we develop a plan for R&D area by adopting the business area and the public role of corporation. In the second stage, we develop the detailed plan within each area. The proposed approach is applied to develop the mid-term and long-term R&D plan of Korea Gas Corporation.

  • PDF

Mid- to Long-term Development Strategies of Business Incubation Centers - Based on Interviews with Start-up Companies and Benchmarking of Business Incubation Centers in Developed Countries (창업보육센터의 중장기 발전 전략: 창업기업 인터뷰와 선진국 창업보육센터 벤치마킹을 토대로)

  • Soo Kyung Kim
    • Journal of Information Technology Applications and Management
    • /
    • v.30 no.4
    • /
    • pp.1-9
    • /
    • 2023
  • The purpose of this study was to make a mid- and long-term development plan on the business incubator center after interviewing five startups that currently being occupied in or already left the center and reviewing benchmark on business incubator centers in developed countries such as USA, Sweden, and Israel. For the interview, the three startups currently being occupied in the center and the two companies already left the center were participated. The main strengths of the center from all of these five companies were easy accessibility to the equipment and space and at the same time trustworthy from the outside vendors and/or government, etc. USA is a leading country who has long history for the startups but mostly the private companies/organizations/individuals have supported the startups in terms of funding or consulting. Also, there are countless local governments nationwide who provide funding, education, and/or space for the small businesses. Mainly based on the interview and the benchmarking, the mid- and long-term development plan for the business incubator center was made. All six themes such as consortium for investment or a local network plan were derived for the development plan which was described in this study.

A Study on Development Model for the Plan of Long and Mid Term Distributed Generation(I) (중.장기 분산전원계획 수립용 모델연구(I))

  • Kim, Yong-Ha;Woo, Sung-Min;Yeon, Jun-Hee;Oh, Seok-Hyeon;You, Jung-Huy
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.496-497
    • /
    • 2008
  • This paper presents development of the long and mid term power expansion planing for distributed generation. This planing model reflect WADE Economic Model's advantage that special quality of DG(Decentralized Generation) and WASP Model's advantage that special quality of CG(Centralized Generation) each other. Through these synergy, we develop better the Plan of Long and Mid Term Distributed Generation then existent model.

  • PDF

A Study on the Establishment of School Repair Cycle (학교시설 수선주기 설정에 관한 연구)

  • Lee, Sang Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.17 no.2
    • /
    • pp.38-47
    • /
    • 2018
  • In Korea, it is difficult to secure student health and safe educational environment due to the rapid deterioration of many school facilities built in the 70s and 80s in the past. As a result, through the improvement of school facilities, social needs for safe schools from various disasters, accidents, Is increasing. The purpose of this study was to establish a standard for the establishment of the national and school facilities for the mid - to long - term plan for the improvement of the old school facilities, and to propose a framework for mid - to long - term and rational planning that can be used by the national and local government offices. The purpose of this study is to establish a mid - and long - term plan for the improvement of old school facilities. The appropriate repair cycle for the improvement of the school facilities set up in this study can be utilized as a standard for the mid - and long - term planning for improvement of the school facilities in the Ministry of Education and the School of Education. To this end, a standard model, It is possible to roughly estimate the overall improvement in the mid- to long-term facilities at the national and regional levels.

The Mid-long Range R&D Planning of Railway Technology and Policy Recommendations (철도기술 연구개발 중장기계획수립($2008{\sim}2012$)결과와 정책적 시사점)

  • Park, Man-Soo;Park, Su-Dong;Yu, Sung-Yun;Kim, Jong-Wook
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1796-1816
    • /
    • 2007
  • Recently, started to apply a strategy of selection and concentration in the construction and transportation R&D for the effective utilization of limited R&D resources. The department of construction and transportation planned the construction and transportation R&D innovative road map by the future 10 years technical requirement under the first year on the innovation of the construction and transportation technology from last year. The innovative road map which is a strategic and long term master plan integrated a construction and transportation suggested a vision as value createar for a improvement of living quality in the future. And made a specific goal that is the seventh construction technology level and the fifth transportation technology level in the world. The department of construction and transportation is planning a mid- long range planing of the construction and transportation R&D as following measurement of innovative road map. KICTEP and KISTEP planned a mid- long range R&D planing of the transportation system, logistics, aviation, railway for the last year. Introducing a methodology used a mid- long range plan and main results of the future railway R&D plan. And suggesting a politic comments for the effectively propelling railway R&D projects.

  • PDF

A study on the CTP System development at manufacture based MTO and MTS (MTO와 MTS기반의 생산방식에서의 CTP 시스템 개발에 관한 연구)

  • 여성주;류석곤;왕지남
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.534-537
    • /
    • 2000
  • Recently, A manufacturing formula centered of the customer is one of the most important parts for the company competition. Especially, it is the matters of weight and importance that Make to Order(MTO) and Make to stock(MTS) is considered at the same time for designing manufacturing system based the order effectly. This paper suggests a alternative Available to promise(ATP) and capable to promise(CTP) to confirm the delivery time to customer, how to link mid-long term production plan with short term daily based scheduling, how to relate middle processes of device based industry to mid-long term plan through the example of S company in a manufacturing formula mixed MTO and MTS

  • PDF

Regional Long-term/Mid-term Load Forecasting using SARIMA in South Korea (계절 ARIMA 모형을 이용한 국내 지역별 전력사용량 중장기수요예측)

  • Ahn, Byung-Hoon;Choi, Hoe-Ryeon;Lee, Hong-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8576-8584
    • /
    • 2015
  • Load forecasting is needed to make supply and demand plan for a stable supply of electricity. It is also necessary for optimal operational plan of the power system planning. In particular, in order to ensure stable power supply, long-term load forecasting is important. And regional load forecasting is important for tightening supply stability. Regional load forecasting is known to be an essential process for the optimal state composition and maintenance of the electric power system network including transmission lines and substations to meet the load required for the area. Therefore, in this paper we propose a forecasting method using SARIMA during the 12 months (long-term/mid-term) load forecasting by 16 regions of the South Korea.

The Study on the Plan Development of Long & Mid Term Distributed Generation(II) (중.장기 분산전원계획 수립용 모델연구(II))

  • Kim, Yong-Ha;Woo, Sung-Min;Moon, Jung-Ho;Yeon, Jun-Hee;Park, Chang-Hyu;Kim, Young-Gil;Lee, Hae-Il
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.444_445
    • /
    • 2009
  • A common approach to estimate long-term electric expansion plan used WASP package in Korea. But, this has a little problem for making input DG(Distributed Generation) data computer. This paper develops new program that take complementary measures for DG. Also, it is verified that this package can evaluate availability from the case studies. When this program cooperate with WASP, calculate good results creating long-term electric expansion plan.

  • PDF