• Title/Summary/Keyword: meter unit

Search Result 185, Processing Time 0.024 seconds

Determination of EMC and Unit Loading of Rainfall Runoff from Forestry-Crops Field (산림과 밭 지역 강우 유출수의 EMC 및 원단위 산정)

  • Won, Chul-hee;Choi, Yong-hun;Seo, Ji-yeon;Kim, Ki-cheol;Shin, Min-hwan;Choi, Joong-dae
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.615-623
    • /
    • 2009
  • The research of the determination of event mean concentration (EMC) was focussed combined sewer overflows and highway runoff in korea. But those of non-urban areas are few. In this study, EMC and unit loading on land use types in Nogok watershed were estimated by runoff loading of non-point source (NPS) on non-urban area. Two monitoring sites were equipped with an automatic velocity meter, flow meter, and water sampler. Monitoring was conducted at two monitering site during the rainy season. The results show that the EMC ranges in forest land use are 1.3~2.6 mg/L for BOD, 2.0~16.1 mg/L for SS, 0.1~2.1 mg/L for TN, and 0.12~0.49 mg/L for TP. The unit loading of NPS in this study was difficult to compare directly with that used conventionally because of the difference of field investigation. In near future, it needs to conduct more systematic and long-term research about NPS within the watershed. The results of this research can be used to estimate the total pollution load management system (TPLMS) program in korea.

Technical Development Status and Market Prospects for High Altitude Wind Power Generation System (공중 풍력발전 기술개발 현황 및 시장전망)

  • Kang, Seung-Won;Gil, Doo-Song;Park, Dong-Su;Jung, Won-Seoup;Kim, Eui-Hwan
    • New & Renewable Energy
    • /
    • v.7 no.2
    • /
    • pp.36-42
    • /
    • 2011
  • The wind speed at the altitude around 300 m is much higher and less variable than at the altitude around 80 m which is the same height of the MW class tower turbine's hub height. The wind power density is increased 0.37 W/$m^2$ per meter at the altitude around 6 to 7 km and 0.25 W/$m^2$ per meter at the altitude around 80 to 500 m. There are two types of power generation systems using lifting bodies. The one is that The generator is installed in the ground station and stretched into the lifting body through the tether. The other is that the generator is installed in the lifting body and stretched into the ground station through the tether. Many kinds of lifting bodies are also researched in the world, called kites, wings, single or twin aerostat, and so on. This article introduced the technical development status and the market prospects of the high altitude wind power generation system all over the world in detail.

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Development of an insulation performance measurement unit for full-scale LNG cargo containment system using heat flow meter method

  • Lee, Jin-sung;Kim, Kyung-su;Kim, Yooil
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.4
    • /
    • pp.458-467
    • /
    • 2018
  • Efforts have been made in this paper to develop the measuring device for the insulation performance of full scale NO96 LNG CCS. The facility was designed to maintain environmental conditions which are similar to operation conditions of full scale LNG CCS. In the facility, the heat sink boundary was kept cryogenic temperature by cold chamber which contains liquefied nitrogen and heat source boundary was made by external case heated by natural convection. Heat Flow Meter method (HFM) was applied to this facility, hence Heat Flux Sensors (HFS) were attached to specimen. The equivalent thermal conductivity of full scale NO96 unit box was targeted to measure and PUF of same size was used for the calibration test. Additionally, the finite element analysis was carried out to check the performance of the developed test facility and experimental results were also compared with those predicted by the numerical method.

Development of AMI NMS (Network Management System) using SNMP for Network Monitoring of Meter Reading Devices (원격검침 설비의 네트워크 상태감시를 위한 SNMP 기반의 저압 AMI 망관리시스템 개발)

  • Kim, Young-Il;Park, So-Jeong;Kim, Young-Jun;Jung, Nam-Jun;Choi, Moon-Suk;Park, Byung-Seok
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.259-268
    • /
    • 2016
  • KEPCO installed AMI (Advanced Metering Infrastructure) metering system for low-voltage customers from 2008. AMI metering system of KEPCO has operated 2.55 million customers and will plan to operate 22 million customers until 2020. KEPCO developed AMI NMS (Network Management System) to operate the meter reading network efficiently. NMS monitors the network status of DCUs (Data Concentration Unit) and modems. NMS provides functionalities of data collection and analysis. It collects property data of network device, network topology information, communication performance information, fault information, and etc. It analyzes collected data and controls network devices by remote access. AMI NMS collects about 370 MIBs (Mangement Information Bases) using SNMP (Simple Network Management Protocol). This paper introduces main functionalities, designed context, and implemented service screen.

Short-term Power Consumption Forecasting Based on IoT Power Meter with LSTM and GRU Deep Learning (LSTM과 GRU 딥러닝 IoT 파워미터 기반의 단기 전력사용량 예측)

  • Lee, Seon-Min;Sun, Young-Ghyu;Lee, Jiyoung;Lee, Donggu;Cho, Eun-Il;Park, Dae-Hyun;Kim, Yong-Bum;Sim, Isaac;Kim, Jin-Young
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.5
    • /
    • pp.79-85
    • /
    • 2019
  • In this paper, we propose a short-term power forecasting method by applying Long Short Term Memory (LSTM) and Gated Recurrent Unit (GRU) neural network to Internet of Things (IoT) power meter. We analyze performance based on real power consumption data of households. Mean absolute error (MAE), mean absolute percentage error (MAPE), mean percentage error (MPE), mean squared error (MSE), and root mean squared error (RMSE) are used as performance evaluation indexes. The experimental results show that the GRU-based model improves the performance by 4.52% in the MAPE and 5.59% in the MPE compared to the LSTM-based model.

Recent Developments and Field Application of Foreign Waterworks Automatic Meter Reading (국외 상수도 원격검침시스템의 개발 동향 및 현장 적용 사례 고찰)

  • Joo, Jin Chul;Ahn, Hosang;Ahn, Chang Hyuk;Ko, Kyung-Rok;Oh, Hyun-Je
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.34 no.12
    • /
    • pp.863-870
    • /
    • 2012
  • The market trends of automatic meter reading associated with smart water meters were investigated. Also, recent developments and field applications of key technology for automatic meter reading associated with smart water meters were analyzed. Smart water meters have been manufactured mostly in United States and Europe and have been expanded their business to Asia. Integrated water management system combining with the additional functions such as real-time consumption metering, cost notification, water conservation, leak detection, water quality monitoring, and flow control have been operated in automatic meter reading. Both water quality and quantity data measured from smart water meters and sensors were transferred to data concentration units through neighborhood area network, and then were transferred to integrated server through wide area network. The data transfer methods were determined by comprehensively considering urban scale, density of smart water meters, power supply and network topologies. Common data collection methods such as fixed network to data concentation units, vehicles drive by, people walk by, and drone fly by have been applied. The automatic meter reading associated with smart water meters are spread throughout the world, and both water and energy savings result in saving the money and reducing the greenhouse gases emission.

A Study on the Implementation of Geographic Information System for an Intelligent Power Distribution Network with Location Informations of Power Line Communication-based Automatic Meter Reading System (전력선통신 기반 저압원격검침 시스템의 공간 정보를 활용한 지능형 배전망 지리정보시스템 구축에 관한 연구)

  • Seo, Chung-Ki;Lee, Seung-Gol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.365-369
    • /
    • 2015
  • In this paper, geographic information system(GIS) for an intelligent power distribution network was implemented with location informations acquired from automatic meter reading system, where the location informations of power line communication(PLC) modems installed at customer side were collected at data concentration units(DCUs) of headend equipment via PLC and then were transmitted to front end processor server. By displaying the connection status of the power distribution network on GIS map, operation of advanced metering infrastructure(AMI) or management of power grid system could be performed intuitionally and in real time, because the configuration state of the power grid could be easily monitored. The feasibility of the proposed system was confirmed with the especially constructed laboratory-level test bed and the verification test of the system will be carried out for a real power distribution network.

Smart meter data transmission device and power IT system using LTE and IoT technologies (LTE와 IoT 기술을 이용한 스마트미터 데이터 전송장치와 전력 IT 시스템)

  • Kang, Ki-Beom;Kim, Hong-Su;Jwa, Jeong-Woo;Kim, Ho-Chan;Kang, Min-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.117-124
    • /
    • 2017
  • A Smart Grid is a system that can efficiently use energy by exchanging real-time information in both directions between a consumer and a power supplier using ICT technology on an existing power network. DR(Demand response) is an arrangement in which electricity users can sell the electricity they save to the electricity market when the price of electricity is high or the power system is crisis. In this study, we developed a power meter data transmission device and power IT system that measure the demand information in real-time using a smart meter and transmit it to a cloud server. The power meter data transmission device developed in this study uses alight sensor connected to a Raspberry Pi 3 to measure the number of blinking lamps on the KEPCO meter per unit of power, in order to provide reliable data without any measurement errors with respect to the KEPCO power data. The power measurement data transmission device uses the standard communication protocol, OpenADR 2.0b. The measured data is transmitted to the power IT system, which consists of the VEN, VTN, and calculation program, via the LTE WiFi communication network and stored in its MySQL DB. The developed power measurement data transmission device issues a power supply instruction and performs a peak reduction DR when a power system crisis occurs. The developed power meter data transmission device has the advantage of allowing the user to adjust it every 1 minute, where as the existing smart metering time is fixed at once every 15 minutes.

Design and Implementation of a Hybrid-Type Mass Flow Controller (하이브리드형 질량 유량 제어기의 설계 및 실현)

  • 이명의;정원철
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.4 no.2
    • /
    • pp.63-70
    • /
    • 2003
  • In this paper, an MFC (Mass Flow Controller) which is widely used in many semiconductor manufacturing processes for controlling the mass flow rate of a gas is designed and implemented using the PIC 16F876 of Microchip, Inc. The MFC implemented in this thesis has the form of hybrid-type, i.e., the mixed-type of the analog-type MFC, which has many problems such as low accurary, and digital-type MFC, which use an expensive DSP (Digital Signal Processor) and an ADC (Analog to Digital Convertor) with high precision. The MFC is consists of the sensor unit, the control unit and the actuator unit, and it has used the automatic calibration algorithm and the reference table method for the improvement of the performance.

  • PDF