The Cross-impact Hierarchy Process (CHP), an extended model of the Analytic Hierarchy Process(AHP) which is linked to Cross Impact Analysis(CIA), is a powerful decision making tool to assist in the ranking of large number of dependent technological alternatives. In this paper, we will describe an application of the CHP to the aerospace industry. We here conducted a questionnaire survey for S company that is one of the representative aerospace companies in Korea. A questionnaire was designed to obtain both the priority with dependence (the CHP priority) and the priority with independence (the AHP priority) in order to compare the priority derived by each of two methods. The hierarchy in this case study is concerned with priority setting for R&D area to ensure dependent aerospace design technology of the company, The result shows that there exists the difference hard to neglect between the final priorities gained by two methods.
This paper investigates the design of a priority rule in a multi-product disassembly environment. Specifically, it is concerned with product scheduling by which the inventory control of disassembled parts can be incorporated into a priority rule to reduce part lead times. The part lead time consists of two components: flow time and supply delay. The primary focus of the paper is on the development of a disassembly priority rule that aims to reduce the supply delay. We propose a priority rule, called Minimum Distance (MD) rule, to improve the supply delay performance. Finally, we provide a comparative analysis on the performance of traditional rules and the new rule proposed in this paper via a simulation model.
Purpose: The purpose of this study was to determine core nursing intervention in nursing records and to compare perceived nursing intervention priority and nursing intervention frequency of general surgery department. Methods: Subjects were 70 nurses who work in the general surgery department. Data was collected using a nursing intervention classification and analyzed by frequency and mean. Results: The most frequent nursing interventions of nursing records were orderly risk management, coping assistance, tissue perfusion management, skin/wound management and nutrition support. Important nursing interventions were tissue perfusion management, respiratory management, electrolyte acid-base management, elimination, peri-operative care. The most frequent nursing interventions were drug management, peri-operative care, risk management, tissue perfusion management, patient education. Conclusion: This study found that nursing records were different from intervention priority and nursing frequency. So further study is needed for finding focused intervention of specific subjects and differences with priority of nursing and frequency of nursing.
In the current RFID (Radio Frequency IDentification) middleware systems based on the EPCglobal standard, the tag data received by multiple readers are processed sequentially in FIFO (First In First Out) order. Considering the priority of RFID reader makes the RFID system more flexible and improve the data transaction throughput in the service environment where important tag data with high priority for a specific reader. In this study, we propose a new RFID middleware system architecture supporting priority service with the Buffer Management Component. Our proposals are compliant with the EPCglobal ALE (Application Level Events) standard interface for middleware systems and their clients. To verify the efficiency of this proposed system, simulation is used for evaluation.
It is very important to evaluate the priority of prevention factors and strategies in order to minimize industrial accident. It provides decisive information for accident prevention and safety management. Therefore, this paper proposes evaluation method of the priority through statistic testing with prevention factors and strategies by the cause analysis of cause and effect models. Especially, this paper uses priority matrix criterion to justify application of rank and objectivity. This paper is based on the results of a questionnaire of workers and managers who are engaged by real manufacturing and construction industries with less than 300 workers in the central region of Korea, where most of the fatal accidents have happened. Finally, the result provides one way to implement safety management for industrial accident prevention.
급액관리에 관련된 단계를 4단계로 나누었으며, 각 단계별 수분 이동 저항을 규명하고, 단계 중에서 급액 상황에 따라 관련 인자의 priority를 설정함으로써 펄라이트 자루재배할 경우 율속인자 중심의 적정 급액관리 기준을 제안하였다. 특히, 급액관리의 가장 중요한 율속인자인 뿌리까지의 수분도달거리를 최소한으로 하여 필요한 수분을 공급하는 과정과 역사성을 부여한 뿌리발달 조장이 가장 중요한 것으로 판명되었다.
The effort for GSI based IT system consolidation has been continued due to the increase of the system and complication increase of system connection, mainly by the global company. Since successful example of GSI realization by part of developed company affect to Korea, global level IT system consolidation has been examined mainly by the domestic company that have great deal of overseas business. Although they have examined consolidation possibility mainly on R&D, finance, operation management part which is the base part of company management, there are limitation for consolidation realization because of the difference between regional business problem of huge cost needed for consolidation. To overcome these realization limitations, it is necessary to lead risk and cost reduction through stepwise part unity and decide Priority Evaluation Framework for Consolidation target and systematic consolidation strategy. For GSI realization, appropriate distributions of unification time according to target system are needed. In this study, based on easiness and usefulness of consolidation and connection between the targets, evaluation methodology for Priority Evaluation Framework of system consolidation has been developed. Priority Evaluation Framework has been decided by applying developed methodology to global production company of high tech industrial part. Through this methodology, companies can realize successful and stable GSI by investing global resources intensively by Priority Evaluation Framework of consolidation target system.
The purpose of this paper is to find out the relative priority among the queueing products for next operation. Critical ratio scheduling is a technique for use in production scheduling to establish and maintain relative priority among the jobs. The relative priority is based on a ratio of when the completed job is required and how much time is required to complete it. A numerical example of "D" company is solved. Jobs are classified into 3 categories; the behind scheduling jobs, the on time jobs and the ahead scheduling jobs.
An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
한국건축시공학회지
/
제12권1호
/
pp.10-21
/
2012
As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.
This study was carried out to show how the Analytic Hierarchy Process technique could be used in setting the priority among selected diseases to increase the range of health insurance benefit. Thirty experts, including doctors (group1), experts for preventive medicine or public health(group2), and representatives of the insured(group 3), participated in the study panel that is conducted for priority setting. They were asked to evaluate the priorities among 6 selected criteria and then 42 selected diseases. The results were as follows; First, representatives of the insured think that the magnitude of out-of-pocket payment should have high priority while doctors think that effectiveness of treatment should have high priority. Second, all experts think that catastrophic diseases such as malignant neoplasm, major heart disease, and cerebral vascular disease should have high priority in health insurance coverage even though there is little difference among groups. These results can be useful to establish a systematic strategy for expanding health insurance benefit package.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.