• 제목/요약/키워드: management methods

검색결과 17,992건 처리시간 0.043초

토목 분야 BIM 라이브러리의 활용을 향상시키기 위한 관리 방법에 대한 연구 - 라이브러리 개발, 수정 및 활용을 중심으로 - (A Study on Management Methods to Improve Utilization of Civil Engineering BIM Library - Focusing on Library Development, Modification and Utilization - )

  • 박영기;오지현;박형순
    • 한국BIM학회 논문집
    • /
    • 제13권4호
    • /
    • pp.13-25
    • /
    • 2023
  • Recently, interest in the necessity and practical application of BIM (Building Information Modeling) is also increasing in the civil engineering field. However, there are difficulties in building BIM models and utilizing BIM modeling in the civil engineering field due to various reasons. To this end, it is necessary to develop management tools and research on management methods that can effectively utilize the BIM library in the civil engineering field. Libraries in the civil engineering field are complementary to each other, so library management in consideration of library management in various combinations and continuous updates is important. BIM library management was proposed through the development of a management tool that reflects these characteristics, which is expected to contribute to improving productivity in the field of civil design.

병원건축의 유지관리 기법에 관한 연구 (A Study on the Methods of Facility Management in Hopitals)

  • 정태우;김광문;성호복
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제7권2호
    • /
    • pp.7-14
    • /
    • 2001
  • The purpose of this study is to suggest the facllity management data for hospitals. The work scope of facility management(FM) for hospitals was comprehensively and concretely classified. The methods of FM are compared between Korean hospitals and Japan hospitals. A domestic hospital has some problems in FM. Some indexes of FM are abstracted in the Korean hospital through the comparison.

  • PDF

LEAN CONSTRUCTION MANAGEMENT OF BPIMT(BUILDIN-CONSTRUCTION PROCESS INNOVATION MANAGEMENT TOOLS & TECHNIQUES) THAT BASED VSM &TACT

  • Sang-Hyuk Lee;Chul-Woo Lim;Chang-duk Kim;Sang-Wook Suh;Yoon-Ki Choi;Jae-Youl Chun;Jung-Ho Yu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1089-1093
    • /
    • 2005
  • Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.

  • PDF

프로젝트관리 성숙도별 리스크관리 적용 (On the Application of Risk Management by Levels of Project Management Maturity)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제34권2호
    • /
    • pp.19-29
    • /
    • 2011
  • The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.

내부점 방법을 위한 사전처리의 구현 (An Implementation of Preprocessing for Interior Point Methods for Linear Programming)

  • 성명기;임성묵;박순달
    • 한국경영과학회지
    • /
    • 제24권1호
    • /
    • pp.1-11
    • /
    • 1999
  • We classified preprocessing methods into (1) analytic methods, (2) methods for removing implied free variables, (3) methods using pivot or elementary row operations, (4) methods for removing linearly dependent rows and columns and (5) methods for dense columns. We noted some considerations to which should be paid attention when preprocessing methods are applied to interior point methods for linear programming. We proposed an efficient order of preprocessing methods and data structures. We also noted the recovery process for dual solutions. We implemented the proposed preprocessing methods. and tested it with 28 large scale problems of NETLIB. We compared the results of it with those of preprocessing routines of HOPDM, BPDPM and CPLEX.

  • PDF

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

무인항공시스템을 활용한 저수지 지형모델 생성 및 정확도 평가 (Accuracy Evaluation and Terrain Model Automation of Reservoir Using Unmanned Aerial Vehicle System)

  • 김정면;박성식;김재휘;안승우;박성용;김용성
    • 한국농공학회논문집
    • /
    • 제59권2호
    • /
    • pp.57-67
    • /
    • 2017
  • This study examines methods for creating terrain models of reservoirs and techniques for verifying the accuracy. Such methods and techniques use unmanned aerial vehicles which are capable of capturing high-resolution images repetitively, are highly economic, and capable of surveying wide areas. In addition, this study suggests methods of acquiring data for reservoir safety management, the methods which also employ the unmanned aerial vehicles. Therefore, this study helps solving problems that can arise when National Disaster Management System rebuilds a reservoir management database, such as a shortage of local government manpower. This study also contributes to providing element technology necessary for advancing the database.

단위임무 기반 로봇의 임무 계획 및 자동화 임무 관리 방법론 (Unit Mission Based Mission Planning and Automatic Mission Management for Robots)

  • 이호주;박원익;김도종
    • 한국군사과학기술학회지
    • /
    • 제17권1호
    • /
    • pp.1-7
    • /
    • 2014
  • In this paper, it is suggested a method of mission planning and management for robots based on the unit mission. In order to make robots execute given missions continuously as time goes by, a new concept for planning the mission which is composed of one or more unit missions and an automatic mission management scheme are developed. For managing robot's missions in real time, six management methods are devised as well in order to cope with the mismatches, which occur frequently during the mission execution, as to the initial plan. Without the operator's involvement, any mismatch can be adjusted automatically by applying one of the mission management methods. The suggested concept of mission planning and mission management methods based on the unit mission are partially realized in the Dog-Horse robot system and it is checked that it can be a viable one for developing effective robot operation systems.

The Development of a Risk Management System in the Field of Industrial Safety in the Republic of Kazakhstan

  • Kudryavtsev, Sergey S.;Yemelin, Pavel V.;Yemelina, Natalya K.
    • Safety and Health at Work
    • /
    • 제9권1호
    • /
    • pp.30-41
    • /
    • 2018
  • Background: The purpose of the work is to develop a system that allows processing of information for analysis and industrial risk management, to monitor the level of industrial safety and to perform necessary measures aimed at the prevention of accidents, casualties, and development of professional diseases for effective management of industrial safety at hazardous industrial sites. Methods: Risk assessment of accidents and incidents is based on expert evaluations. Based on the lists of criteria parameters and their possible values, provided by the experts, a unified information and analytical database is compiled, which is included in the final interrogation questionnaires. Risk assessment of industrial injuries and occupational diseases is based on statistical methods. Results: The result of the research is the creation of Guidelines for risk management on hazardous industrial sites of the Republic of Kazakhstan. The Guidelines determine the directions and methods of complex assessment of the state of industrial safety and labor protection and they could be applied as methodological basis at the development of preventive measures for emergencies, casualties, and incidents at hazardous industrial sites. Conclusion: Implementation of the information-analytical system of risk level assessment allows to analyze the state of risk of a possible accident at industrial sites, make valid management decisions aimed at the prevention of emergencies, and monitor the effectiveness of accident prevention measures.

A study on the analytical procedures using artificial intelligence methods

  • Han, In-Goo;Youn, Sung-Jun
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1997년도 추계학술대회발표논문집; 홍익대학교, 서울; 1 Nov. 1997
    • /
    • pp.109-112
    • /
    • 1997
  • In this study, we attempt to improve analytical methods in auditing by applying Artificial Intelligence(AI) methods including Artificial Neural Networks(ANN) and Case-Based Reasoning(CBR), and to perform pattern recognition of the investigation signals generated by analytical procedures. Five years of audited financial data from a large-sized firm were used to calculate four commonly applied financial ratios. This exploratory study shows that the use of AI methods to analyze patterns of related fluctuations across numerous financial ratios provides improved performance in recognizing material misstatements within the financial accounts.

  • PDF