• Title/Summary/Keyword: maintenance condition

Search Result 1,685, Processing Time 0.028 seconds

A Study on the Deterioration Patterns of Building Components in the Rental Apartment Housing (임대공동주택 구성재의 열화도 패턴에 관한 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.65-72
    • /
    • 2006
  • Most of buildings have been deteriorated with time-elapse by reflection of the building location, material, environmental circumstances and so on. The performance would go down and be demolished if anything could not be done after constructed. The maintenance should be required to preserve a decent living condition or improve a inferior condition by various plans and practices. The maintenance plan needs various data such as a repair scope, a repair time, a forecasted cost, a plan of management and so forth. Among the above required data for planning the maintenance, the deterioration characteristics of the building components would be first analyzed. The deterioration pattern would be a key role to affect and make a maintenance plan. In this paper, it aimed at classifying the deterioration patterns of building components. A deterioration pattern would be analyzed between the cumulative repair cost and time-elapse and modeled with these relations. A deterioration patterns are classified into 4 types-a accelerated type, a straight type, a temporary type and a slowly type. As a result of this research, a accelerated type includes window, window frame, general paintings, general water proofing in building components. A straight type includes the lacquer paintings, furnishings in building components and water supply pipe, boiler, sanitaries in mechanical facilities and lighting in electric facilities. Based on these research results, further study should be conducted to include any other components and an estimating model.

Review on Advanced Health Monitoring Methods for Aero Gas Turbines using Model Based Methods and Artificial Intelligent Methods

  • Kong, Changduk
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.15 no.2
    • /
    • pp.123-137
    • /
    • 2014
  • The aviation gas turbine is composed of many expensive and highly precise parts and operated in high pressure and temperature gas. When breakdown or performance deterioration occurs due to the hostile environment and component degradation, it severely influences the aircraft operation. Recently to minimize this problem the third generation of predictive maintenance known as condition based maintenance has been developed. This method not only monitors the engine condition and diagnoses the engine faults but also gives proper maintenance advice. Therefore it can maximize the availability and minimize the maintenance cost. The advanced gas turbine health monitoring method is classified into model based diagnosis (such as observers, parity equations, parameter estimation and Gas Path Analysis (GPA)) and soft computing diagnosis (such as expert system, fuzzy logic, Neural Networks (NNs) and Genetic Algorithms (GA)). The overview shows an introduction, advantages, and disadvantages of each advanced engine health monitoring method. In addition, some practical gas turbine health monitoring application examples using the GPA methods and the artificial intelligent methods including fuzzy logic, NNs and GA developed by the author are presented.

A Study on the Investigation Technique for Deterioration State of Window·Door and Tile of Apartment Houses (공동주택 창호 및 타일의 열화상태 조사기법에 관한 연구)

  • Lee, Jung-Hun;Bae, Kee-Sun;Lee, Seong-Bok;Oh, Sang-Keun;Choi, Soo-Kyung;Seo, Chi-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.27-30
    • /
    • 2011
  • Analysis data of basics which are used for LCC(Life Cycle Cost) analysis of buildings and maintenance plan, are demanded to secure according as replacement cycle of repairs of apartment houses has come. However, investigation techniques and systems for investigating condition of deterioration of apartment houses, have not been made yet in Korea. For this reason, this study was wanted to make investigation techniques and systems, so the process for maintenance of apartment houses was researched and the required quality and deterioration factors of interior/exterior materials were investigated. As a result Check-List for investigating condition of deterioration, was made. if this is used during a nonscheduled, a routine, a regular and a urgency check, the methodical investigation will be achieved. Furthermore, if this is used for maintenance of apartment houses, it will be helped to select the repair cycle and the long-term repair plan.

  • PDF

Study on the Development of Condition Monitoring Technology for Turbine Lubricating Systems in Power Plants (발전용 터빈 윤활계통 기계시스템의 상태진단기술 개발연구)

  • 신규식;김재평;남창현;백수곤;권오관;안효석;윤의성;손동구
    • Tribology and Lubricants
    • /
    • v.10 no.4
    • /
    • pp.51-58
    • /
    • 1994
  • Condition monitoring technology has recently been received much attention in the light of its significance on the maintenance of complex machineries such as turbines in power plants. Currently, turbines in power plants are maintained by scheduled overhaul based on the manufacturer's recommendations and the utility's experience. Although this preventive maintenance is known to be very effective, operators have less access to identify failure of elements when it happens between overhaul period. Therefore, in this study, a development of a on-line condition monitoring system through wear debris analysis of lubricating oils is aimed with a view to detecting abnormal wear behaviour of bearings and other wet-components at an early stage, allowing better outage scheduling and minimizing forced outages. For field application purposes, the on-line system developed was installed on the turbine of the No.4 unit at Ulsan Power Plant and its performance has been evaluated on site.

Joints: the weak link in bridge structures and lifecycles

  • Yanev, Bojidar
    • Smart Structures and Systems
    • /
    • v.15 no.3
    • /
    • pp.543-553
    • /
    • 2015
  • The condition of the vehicular bridge network in New York City, as represented by ratings obtained during biennial inspections is reviewed over a period of three decades. Concurrently, the bridges comprising the network are considered as networks of structural elements whose condition defines the overall bridge condition according to New York State assumptions. A knowledge-based matrix of assessments is used in order to determine each element's vulnerability and impact within the network of an individual structure and the network of City bridges. In both networks expansion deck joints emerge as the weak link. Typical joint failures are illustrated. Bridge management options for maintenance, preservation, rehabilitation and replacement are examined in the context of joint performance.

Improved Criteria for Condition Assessment of Bridges Based on Visual Inspection (교량의 외관 조사에 의한 상태평가기준 개선안)

  • Oh, Byung-Hwan;Shin, Kyung-Joon;Kim, Kwang-Soo;Kim, Ji-Sang;Lee, Sang-Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.205-213
    • /
    • 2001
  • The condition assessment of bridges is one of the important procedures in the safety evaluation of the structures. The current inspection guideline is rather ambiguous and vague so that the inspection results based on the existing guidelines are highly subjective and varing from person to person and even day to day for a given person. It is therefore, necessary to improve the current inspection criteria in order to provide consistent results in safety assessment. To circumvent possible inconsistencies in inspection and rating of bridge components, the revised criteria have been proposed in this study. The proposed guideline and criteria may be efficiently used for the realistic and consistent assessment of bridge structures.

  • PDF

On determining a non-periodic preventive maintenance schedule using the failure rate threshold for a repairable system

  • Lee, Juhyun;Park, Jihyun;Ahn, Suneung
    • Smart Structures and Systems
    • /
    • v.22 no.2
    • /
    • pp.151-159
    • /
    • 2018
  • Maintenance activities are regarded as a key part of the repairable deteriorating system because they maintain the equipment in good condition. In practice, many maintenance policies are used in engineering fields to reduce unexpected failures and slow down the deterioration of the system. However, in traditional maintenance policies, maintenance activities have often been assumed to be performed at the same time interval, which may result in higher operational costs and more system failures. Thus, this study presents two non-periodic preventive maintenance (PM) policies for repairable deteriorating systems, employing the failure rate of the system as a conditional variable. In the proposed PM models, the failure rate of the system was restored via the failure rate reduction factors after imperfect PM activities. Operational costs were also considered, which increased along with the operating time of the system and the frequency of PM activities to reflect the deterioration process of the system. A numerical example was provided to illustrate the proposed PM policy. The results showed that PM activities performed at a low failure rate threshold slowed down the degradation of the system and thus extended the system lifetime. Moreover, when the operational cost was considered in the proposed maintenance scheme, the system replacement was more cost-effective than frequent PM activities in the severely degraded system.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

An Improved Facility Management System for Public Facility Management Corporations (공공 시설관리기관의 시설관리시스템 개선에 관한 연구)

  • Kim, ChangDuk;Lee, HyunChul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.32-42
    • /
    • 2018
  • The importance of facility maintenance management cannot be overemphasized in that not only the value but also the performance of the facility is determined by the level of maintenance. The maintenance cost of the facility ranges from 3 to 10 times the initial construction cost depending the type and use of the facility over the life span. This maintenance importance is increased for the group of facilities and even more critical when the facilities compete for the limited budget with the limited resources such as manpower and equipment. This study analyzed sixteen public facility management corporations primarily for three items: 1) facility management system, 2) long-term rehabilitation plan, 3) the rehabilitation selection system. This paper provides and recommends the key elements of the facility maintenance management system based on the analysis of the sixteen corporations.

CONDITION MONITORING USING EMPIRICAL MODELS: TECHNICAL REVIEW AND PROSPECTS FOR NUCLEAR APPLICATIONS

  • Heo, Gyun-Young
    • Nuclear Engineering and Technology
    • /
    • v.40 no.1
    • /
    • pp.49-68
    • /
    • 2008
  • The purpose of this paper is to extensively review the condition monitoring (CM) techniques using empirical models in an effort to reduce or eliminate unexpected downtimes in general industry, and to illustrate the feasibility of applying them to the nuclear industry. CM provides on-time warnings of system states to enable the optimal scheduling of maintenance and, ultimately, plant uptime is maximized. Currently, most maintenance processes tend to be either reactive, or part of scheduled, or preventive maintenance. Such maintenance is being increasingly reported as a poor practice for two reasons: first, the component does not necessarily require maintenance, thus the maintenance cost is wasted, and secondly, failure catalysts are introduced into properly working components, which is worse. This paper first summarizes the technical aspects of CM including state estimation and state monitoring. The mathematical background of CM is mature enough even for commercial use in the nuclear industry. Considering the current computational capabilities of CM, its application is not limited by technical difficulties, but by a lack of desire on the part of industry to implement it. For practical applications in the nuclear industry, it may be more important to clarify and quantify the negative impact of unexpected outcomes or failures in CM than it is to investigate its advantages. In other words, while issues regarding accuracy have been targeted to date, the concerns regarding robustness should now be concentrated on. Standardizing the anticipated failures and the possibly harsh operating conditions, and then evaluating the impact of the proposed CM under those conditions may be necessary. In order to make the CM techniques practical for the nuclear industry in the future, it is recommended that a prototype CM system be applied to a secondary system in which most of the components are non-safety grade. Recently, many activities to enhance the safety and efficiency of the secondary system have been encouraged. With the application of CM to nuclear power plants, it is expected to increase profit while addressing safety and economic issues.