• Title/Summary/Keyword: maintenance & repair

Search Result 1,080, Processing Time 0.038 seconds

Performance of RC Beams Strengthened with FRP-Aluminum Composite Hollow Beam Under the Fire (RC보에 대한 FRP-Aluminum 유공복합보의 보강성능에 관한 연구)

  • Lee, Jae-Ik;Choi, Yeol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.153-160
    • /
    • 2010
  • The widespread deterioration of concrete structures has required the development of new and innovative materials and technologies for strengthening and repair. Recently Fiber reinforced polymer(FRP) composites have received widespread attention as materials for the strengthening and repair of the deteriorated concrete structures. This paper presents the results of Fire-performance of RC beams strengthened with FRP-Aluminum composit hollow beams. Test results show that the higher-damaged FRP strengthened RC beams are more vulnerable to the fire and decrease the effect of FRP strenthening.

Fault prediction of wind turbine and Generation benefit evaluation by using the SVM method (SVM방법을 이용한 풍력발전기 고장 예측 및 발전수익 평가)

  • Shin, Jun-Hyun;Lee, Yun-Seong;Kim, Sung-Yul;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.5
    • /
    • pp.60-67
    • /
    • 2014
  • Wind power is one of the fastest growing renewable energy sources. The blades length and tower height of wind turbine have been growing steadily in the last 10 years in order to increase the output amount of wind power energy. The amount of wind turbine energy is increased by increasing the capacity of wind turbine, but the costs of preventive, corrective and replacement maintenance are also increased accordingly. Recently, Condition Monitoring System that can repair the fault diagnose and repair of wind turbine in the real-time. However, these system have a problem that cannot predict and diagnose of the fault. In this paper, wind turbine predict methodology is proposed by using the SVM method. In the case study, correlation analysis between wind turbine fault and external environmental factors is performed by using the SVM method.

The Development of Maintenance Process in Long-Life Housing (장수명 공동주택 유지관리를 위한 프로세스 구축에 대한 연구)

  • Ji, Jang-Hun;Kim, Soo-Am;Yoon, Sang-Cho
    • Journal of the Korean housing association
    • /
    • v.21 no.3
    • /
    • pp.115-124
    • /
    • 2010
  • The environment which has been destroyed for the national growth since 1960's would seem to offer infinite resources to human, but now, the existence of human being is threatened by the development thoughtless for the environment. The World Powers have concentrated on green growth with eco-friendly resource since the end of 20th century. Korea suggested that the vision was the low carbon for green growth in 2008. It is necessary to supply Long-Life Housing in the green technology in terms of the sustainable housing development based on various life style, life cycle of the residences, the restrain remodeling and redevelopment in construction. This study is aim to establish the development of maintenance process to make continuous inhabitation of Long-Life Housing that has the separated SI for maintenance, durability, variability and remodeling. The maintenance for Long-Life Housing is very important to have more than 50~70 years the long term of life cycle in comparison with Housing. Also, the roles of manager and user are important parts in Long-Life Housing. The present maintenance for Housing is shift and repair works by the routine maintenance and demage. However, The maintenance for Long-Life Housing should consider movement and flexibility. In addition, Long-Life Housing requires the proper process of maintenance because it is different from Housing in housing concept, design and constructions stage. Therefore this study shows the efficient maintenance process for Long-Life Housing.

Additional CSP calculation method considering Human Error (휴먼에러를 고려한 추가 CSP 산정 방안)

  • Baek, Sung-Il;Ha, Yun-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.759-767
    • /
    • 2021
  • Most weapons systems that are Force Integration are expensive equipment that reflects the latest technology, and the operation and maintenance cost is increasing continuously. Factors that efficiently operate and maintain these weapon systems include maintenance plans, economic costs, and repair part requirements. Among them, predicting the repair parts requirements during the life cycle in advance is an important way to increase operation and maintenance cost efficiency and operating availability. The start of requirement analysis for repair parts is a calculation of the CSP (CSP: Concurrent Spare parts, CSP hereafter) that is distributed when the weapon system is deployed. The CSP is an essential component of achieving the operating availability during this period because the weapon system aims to successfully perform a given operation mission without resupply for an initial set period. In the present study, the CSP calculation method was analyzed, reflecting the failure rate and operating time of items, but the analyzed CSP was aimed at preparing for technical failure, but in the initial operating environment, it is limited in coping with unexpected failures caused by human error. The failure is not included in the scope of free maintenance and is a serious factor in making the weapon system inoperable during the initial operation period. To prevent the inoperable status of a weapon system, CSP that considers human error is required in the initial operating environment, and the calculation criteria and measures are proposed.

A Study on the Improvement of VVVF Inverter of the Line 7 EMU by Applying FMECA Process (FMECA를 통한 7호선 VVVF 인버터 시스템 개선방안에 관한 연구)

  • Park, Jea-Hung;Kim, Ho-Kyung;Lee, Kwan-Sup
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.7-13
    • /
    • 2011
  • RAMS is the procedure to maximize the reliability and availability of systems with managing operation rate, the frequency of failure in the system and repair method. Recently, all system life-cycle focusing on RAMS process has been rapidly developing in the field of railway vehicles, for example, applying th reliability management techniques for procurement and disposal of EMU. In particular, global economic recession require to reasonable measures for the EMU maintenance costs under the circumstances therefore, an alternative solution based on RCM(Reliability Centered Maintenance) which is the optimal maintenance method is interested. In this study, the state of being critical of each component and a primary factors was analyzed to improve VVVF inverter of the line 7 EMU by applying FMECA process. Furthermore, this paper showed the impact of connecting between the main and sub system. Based on these data, critical components according to malfunction ratings were classified by screening measures and improvements for each components was summarized.

  • PDF

Optimum Replacement Times for a Steam Generator (증기발생기 최적 교체시기 결정에 관한 연구)

  • Hur, Jung-Hoon;Yun, Won-Young
    • IE interfaces
    • /
    • v.15 no.1
    • /
    • pp.89-98
    • /
    • 2002
  • This paper considers the optimum replacement times of a steam generator in nuclear power plant with failure data. It is assumed that the failure pattern of units is given as a Weibull distribution and repair and periodic preventive maintenance are performed periodically. The maximum likelihood method is used to estimated the Weibull parameters of failure distribution from failure data. Relpacement, output-decresing and maintenance costs are considered to determine the optimal replacement times by simulation. Numerical examples are included with actual failure data and cost estimators.

Estimation of Vendor Cost for Software Maintenance and Repair Outsourcing (소프트웨어 유지보수 아웃소싱 벤더의 비용에 관한 연구)

  • Yoo, Jee-Na;Kim, Byoung-Soo;Choi, Minn-Seok;Oh, Jung-Suk
    • Asia pacific journal of information systems
    • /
    • v.16 no.2
    • /
    • pp.143-158
    • /
    • 2006
  • This paper considers probable determinants of the application software outsourcing costs and focuses on the service level agreement (SLA) influence. Recently, outsourcing clients and vendors have contracted SLA and tried to reflect them on outsourcing prices. While application software maintenance has been one of the most frequently outsourced functions, its cost did not reflect the service level requirements by the client. This paper empirically shows that the service urgency requirement on SLA increases the maintenance programmers' effort and thus increases the vendor's cost. This result can be used by vendors for program allocation purposes.

Steam Generator Management Program (원전 증기발생기 관리프로그램)

  • Cho, Nam-Cheoul;Kim, Moo-Soo;Lee, Kwang-Woo
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.610-616
    • /
    • 2003
  • Recently, the common concern of nuclear power industry in the development of technology mitigating and preventing the aging of steam generator tubes prevails, because the trends of steam generator flaws at Uljin unit #1,2 and KSNP(Korea Standard Nuclear Power Plant) impose a burden on the operation of nuclear power plant. While the regulatory agency is demanding the establishment of the advanced general performance maintenance system, the steam generator management program adapting advanced technology is being developed which may comply with EPRI PWR SG Guidelines based on NEI 97-06 ‘ General Guidelines including all the maintenance aspects consist of the tube integrity assessment criteria, repair limit, allowable leakage level, water chemistry will be composed in order to obtain the approval of regulatory agency and be applied to Nuclear power plant early 2005. This presentation is to introduce maintenance state including SG tube degradation and main contents of advanced SG management program being developed, and futhermore update present and future plan, and estimate the alternation after the completion.

  • PDF

Probabilistic Prediction of Structural Performance for Rational Bridge Management Policy (합리적 교량유지관리 의사결정을 위한 구조성능의 추계학적 예측)

  • Oh, Byung-Hwan;Kim, Dong-Wook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.185-193
    • /
    • 2004
  • Reasonable prediction of bridge deterioration is the most important factor in the determination of repair time or optimized maintenance policy for bridges. To accomplish these purposes, the proposed method is composed of quantitative condition assessment, Markov chains and Bayesian estimates. Example predictions of concrete slab bridges in Korea were illustrated with higher reasonability than those of existing methods such as expert opinion and visual inspection only.

A Improvement Plan for Inspection Method about the Urban Railway Facilities and Cycle (도시철도 시설물 점검 방법 및 주기 개선방안 - 궤도시설물 점검 중심으로 -)

  • Moon, Deuk-Soo;Chang, Byung-Chul;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.243-248
    • /
    • 2008
  • Seoul subway is an safety, quick, and clean public transportation to secure citizens safety. One of the most important elements of train is optimizing railroad function and need to conform railroad inspection for function maintenance. Railroad is the most biggest part of the railroad facility and it is a structure which requires sustainable maintenance. The purpose of study is to improve domestic metropolitan railroad facility inspection method and period. For this, we refer documents about present roving method, roving members and period of railroad roving. In addition, analyzed problems of railroad roving investigation method and period by examining the type and standards of railroad investigation and interviewing experts. By this, we analyzed improving plan and expectations of railroad maintenance and repair operation.

  • PDF