• Title/Summary/Keyword: maintenance & repair

Search Result 1,080, Processing Time 0.024 seconds

A Bayesian Approach to Periodic Preventive Maintenance Policy (주기적인 예방보전정책의 베이즈 접근방법)

  • 한성실;정기문;권영섭
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.3
    • /
    • pp.39-48
    • /
    • 2001
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. In this paper, we consider a Bayesian approach to determine an optimal periodic preventive maintenance policy. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established. Some numerical examples are presented for illustrative purpose.

  • PDF

Repair and Rehabilitation of Concrete Structures

  • Nagataki Shigeyoshi
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.1-9
    • /
    • 2004
  • Repair of concrete structures has been a focus of attention in recent years not only in Japan but also worldwide. Concrete structures have fallen short of expectations at the time of construction-they should have been perpetual and maintenance-free. However, investigation into their premature deterioration reveals the primary causes: Concrete was made using inadequate materials and/or inadequate mixture proportions due to insufficient consideration and was placed inadequately under insufficient execution control. The secondary causes include insufficient consideration at the time of construction for the environmental conditions to which the structures were to be exposed. In any event, in the current economic climate, structures cannot be demolished and rebuilt as soon as they are damaged, but instead are expected to continue to be in service as long as possible with appropriate repair or retrofitting. This paper analyzes the causes of deterioration requiring repair and introduces relevant repair techniques. At the end, the repair project of the Sanyo Shinkansen Line in which the author was involved through committee activities is reported.

  • PDF

A Study on the Correlation between Damage and Repair Volume of Bridge Maintenance (교량 유지보수의 손상물량과 보수물량 상관관계 연구)

  • Lee, Changjun;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.577-585
    • /
    • 2024
  • Infrastructure plays a crucial role in the industrial development and economic growth of a nation. However, recently, domestic infrastructure has been causing not only safety risks due to aging but also social and economic inefficiencies, increasing the need for maintenance. In particular, the deterioration rate of bridges is serious, so application of appropriate repair and rehabilitation methods and estimation of its quantity are required. In this study, frequently applied repair methods for bridges using data from the Facility Integrated Management System (FMS) were identified. the empirical correlation between damage volume and the repair volume was analyzed using Bridge Management System (BMS) data. The result of the analysis showed that the ratio of the repair volume to the damage volume was 1.0. The guideline, on the other hand, suggest 1.5 the ratio of the repair volume to the damage volume. Although the guidelines differently present more conservative figures considering safety, this study is significant in that it presents a practical ratio through data analysis results. This results can be used to develop a model that can calculate the amount of repair and rehabilitation of various facilities in the future.

Development the Preventive Maintenance Template of the Nuclear Steam Turbine based on EPRI PMBD (EPRI의 예방정비기초자료에 근거한 원전 증기터빈의 예방정비기준 개발)

  • Lee, Byoung Hak;Lee, Hyuk Soon
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.1
    • /
    • pp.1-8
    • /
    • 2010
  • The existing maintenance program is focused on time-based maintenance to inspect and repair components according to maintenance period, rather than condition-based maintenance or predictive maintenance. The preventive maintenance template of the steam turbine has been developed for optimizing maintenance procedure and improving reliability and availability of the steam turbine of nuclear power plants based on EPRI PM template methodology and EPRI technical reports about preventive maintenance.

  • PDF

A Study on Condition-based Maintenance Policy using Minimum-Repair Block Replacement (최소수리 블록교체 모형을 활용한 상태기반 보전 정책 연구)

  • Lim, Jun Hyoung;Won, Dong-Yeon;Sim, Hyun Su;Park, Cheol Hong;Koh, Kwan-Ju;Kang, Jun-Gyu;Kim, Yong Soo
    • Journal of Applied Reliability
    • /
    • v.18 no.2
    • /
    • pp.114-121
    • /
    • 2018
  • Purpose: This study proposes a process for evaluating the preventive maintenance policy for a system with degradation characteristics and for calculating the appropriate preventive maintenance cycle using time- and condition-based maintenance. Methods: First, the collected data is divided into the maintenance history lifetime and degradation lifetime, and analysis datasets are extracted through preprocessing. Particle filter algorithm is used to estimate the degradation lifetime from analysis datasets and prior information is obtained using LSE. The suitability and cost of the existing preventive maintenance policy are each evaluated based on the degradation lifetime and by using a minimum repair block replacement model of time-based maintenance. Results: The process is applied to the degradation of the reverse osmosis (RO) membrane in a seawater reverse osmosis (SWRO) plant to evaluate the existing preventive maintenance policy. Conclusion: This method can be used for facilities or systems that undergo degradation, which can be evaluated in terms of cost and time. The method is expected to be used in decision-making for devising the optimal preventive maintenance policy.

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.

A Study on Evaluation of corrective maintenance for the ATP on-board equipped in Tilting train (틸팅열차 차상신호장치 교정유지보수 평가에 관한 연구)

  • Lee, Kang-Mi;Shin, Duc-Ko;Baek, Jong-Hyen;Lee, Jae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1989-1992
    • /
    • 2009
  • Maintenance is classified preventive maintenance before performing equipment failure and corrective maintenance after performing equipment failure. In preventive maintenance, we may analyze the failure data to end from beginning of equipment and allocate maintenance method and calculate maintenance cycle quantitatively by the failure data analysis. So, it has a merit to reduce system maintenance cost and to operate effectively but, it require high cost in system introducing and continuous operation to end of system. In corrective maintenance, we may calculate MTTR(mean time to repair) quantitatively based on function failure time. it can be based on establishing maintenance system for operation efficiency. In this paper, we may reflect the MTTR for the onboard equipped in Tilting train to establish maintenance system for Tilting train operation efficiency.

  • PDF

A Study on Improving Aircraft Maintenance Licensing System of South Korea for Mutual Recognition Between Countries

  • Oh, Kwon-suk;Lee, Hakbong;Yoo, Kwang-Eui
    • Journal of Aerospace System Engineering
    • /
    • v.14 no.6
    • /
    • pp.36-43
    • /
    • 2020
  • The purpose of this study is to present the internationalization of South Korea's aircraft maintenance certificate for mutual recognition of aircraft maintenance license qualifications among various countries in preparation for an internationalization of the work conducted by the aviation industry. To achieve this objective, this study reviews the aircraft maintenance license training system and compares the standards for aircraft maintenance certification established by the Convention on International Civil Aviation with the standards for issuing domestic aircraft maintenance licenses. This comparative analysis shows that the domestic curriculum of aircraft maintenance licenses differs from international standards. As a result of this study, an improvement plan of the education content was proposed to enable the licensing qualifications of domestic aircraft maintenance licenses to be mutually recognized among different countries.

Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost (공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.