• Title/Summary/Keyword: main tunnels

Search Result 116, Processing Time 0.026 seconds

Effects of unconfined blast on strategic structures and its protective measures

  • Choubey, Bishwajeet;Dutta, Sekhar C.;Hussain, Md. Ahsaan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.2
    • /
    • pp.167-180
    • /
    • 2022
  • A strategic structure when exposed to direct hit of conventional bomb/projectile are severely damaged because of large amounts of energy released by the impact and penetration of bomb. When massive concrete slabs suffer a direct hit, the energy released during impact and penetration process are able to easily break up large mass of concrete. When over stressed under such impact of bombs, the concrete structure fails showing brittle behavioural nature. This paper is intended to study and suggest the protective measures for structures used for strategic application by adopting a means to dissipate the large quantum of energy released. To quantitatively evaluate the force, displacement and energy in such scenario, a fine numerical model of the proposed layered structure of different combinations was built in ANSYS programme in which tri-nitrotoluene (TNT) explosive was detonated at penetration depth calculated for GP1000 Lbs bomb. The distinct blast mitigation effect of the proposed structure was demonstrated by adopting various layers/barriers created as protective measures for the strategic structure. The calculated result shows that the blast effect on the structure is potentially reduced due to provision of buster slab with sand cushioning provided as protective measure to the main structure. This concept of layered protective measures may be adopted for safeguarding strategic structures such as Domes, Tunnels and Underground Structures.

Development of the Method Estimating Sections Occurring Intensive PM10 in a Subway Tunnel (For the South Section (Cheongdam~Jangseungbaegi) of Subway Line 7 in Seoul) (지하철 터널의 미세먼지 집중 발생구간 추정방법 개발 (서울 지하철 7호선 남단구간 (청담역~장승배기역) 을 대상으로))

  • Park, Jong-Heon;Park, Jae-Cheol;Eum, Seong-Jik
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.6
    • /
    • pp.121-131
    • /
    • 2010
  • To effectively reduce PM10 generated in concourses and platforms of subway stations, a research is being conducted to find the PM10 source. The main source of PM10 in subway stations was PM10 generated in the main line tunnels, which was generated in proportion to the frequency of the train operation. Each amount of the PM10 generated when the train was operated once, was constant regardless of the time. On the assumption that the PM10 level in a tunnel of a line is a sum of newly generated amount of dust when the subway passes and the amount carried from the adjacent stations by the wind generated from the subway rolling stocks, the method which estimates the intensive PM10 occurring section was developed and applied to the 12 stations between Cheongdam and Jangseungbaegi in Seoul Subway Line 7.

Numerical modeling of brittle failure of the overstressed rock mass around deep tunnel (심부 터널 주변 과응력 암반의 취성파괴 수치모델링)

  • Lee, Kun-Chai;Moon, Hyun-Koo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.469-485
    • /
    • 2016
  • The failure of rock mass around deep tunnel, different from shallow tunnel largely affected by discontinuities, is dominated by magnitudes and directions of stresses, and the failures dominated by stresses can be divided into ductile and brittle features according to the conditions of stresses and the characteristics of rock mass. It is important to know the range and the depth of the V-shaped notch type failure resulted from the brittle failure, such as spalling, slabbing and rock burst, because they are the main factors for the design of excavation and support of deep tunnels. The main features of brittle failure are that it consists of cohesion loss and friction mobilization according to the stress condition, and is progressive. In this paper, a three-dimensional numerical model has been developed in order to simulate the brittle behavior of rock mass around deep tunnel by introducing the bi-linear failure envelope cut off, elastic-elastoplastic coupling and gradual spread of elastoplastic regions. By performing a series of numerical analyses, it is shown that the depths of failure estimated by this model coincide with an empirical relation from a case study.

High Deformable Concrete (HDC) element: An experimental and numerical study

  • Kesejini, Yasser Alilou;Bahramifar, Amir;Afshin, Hassan;Tabrizi, Mehrdad Emami
    • Advances in concrete construction
    • /
    • v.11 no.5
    • /
    • pp.357-365
    • /
    • 2021
  • High deformable concrete (HDC) elements have compressive strength rates equal to conventional concrete and have got a high compressive strain at about 20% to 50%. These types of concrete elements as prefabricated parts have an abundance of applications in the construction industry which is the most used in the construction of tunnels in squeezing grounds, tunnel passwords from fault zones or swelling soils as soft supports. HDC elements after reaching to compressive yield stress, in nonlinear behavior have hardening combined with increasing strain and compressive strength. The main aim of this laboratory and numerical research is to construct concrete elements with the above properties so the compressive stress-strain behavior of different concrete elements with four categories of mix designs have been discussed and finally one of them has been defined as HDC element mix design. Furthermore, two columns with and without implementing of HDC elements have been made and stress-strain curves of them have been investigated experimentally. An analysis model is presented for columns using finite element method adopted by ABAQUS. The results obtained from the ABAQUS finite element method are compared with experimental data. The main comparison is made for stress-strain curve. The stress-strain curves from the finite element method agree well with experimental results. The results show that the dimension of the HDC samples is significant in the stress-strain behavior. The use of the element greatly increases energy absorption and ductility.

The First Case Study of TBM Pre-Excavation Type 2-Arch Tunnel in Korea (국내 최초 TBM선굴진 2-Arch터널 설계사례 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.255-264
    • /
    • 2023
  • As the demand for urban underground space increases recently, urban tunnel planning is actively progressing. In the urban area, a underground station is planned in consideration of the living environment of residents, and 2-arch tunnel is applied for the stability of existing structures and reduction of environmental damage. However, since the depth of weak rock mass is deeply distributed in the urban area due to severe weathering, careful planning is required to secure tunnel stability. In addition, if TBM mechanical excavation is applied as the main tunnel excavation method considering the composite ground in urban area, the construction connectivity with the 2-arch tunnel of the NATM concept may be deteriorated. In this study, the design case of applying TBM pre-excavation type 2-arch tunnel for the first time in Korea was mainly described. The main considerations for the segment design of TBM pre-excavation type 2-arch tunnel were explained for side tunnels. Also, a stability analysis was conducted to verify the effectiveness and adequacy of the TBM pre-excavation type 2-arch tunnel.

Tunnelling in Bangkok - Two Case Studies (방콕의 터널공사 - 두 개의 사례연구)

  • Teparaksa, Wanchai;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.153-163
    • /
    • 2005
  • This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.

  • PDF

Evaluation of Road Asset Value using Alternative Depreciation methods : Focusing on National Highway No.1 (대체적 감가상각기법을 활용한 도로자산의 가치 평가 : 국도 1호선을 중심으로)

  • Do, Myungsik;Park, Sunghwan;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.19-30
    • /
    • 2017
  • PURPOSES : This study proposes the road asset valuation approach using alternative depreciation methods. It has become necessary to have asset management system according to the adoption of accrual basis accounting for governmental financial reporting and the amendment of the road act. Therefore, it is very important to analyze the effect of depreciation methods on road asset value as a basic research for road asset management system. METHODS : The Ministry of Strategy and Finance (MOSF) has mainly performed road asset valuation based on Write down Replacement Cost and Straight Line depreciation method. This study suggests some appropriate asset valuation methods for road assets through case analysis using three depreciation methods: Consumption-based depreciation method, Condition-based depreciation method, and Straight Line depreciation method. A road asset valuation data of national highway route 1 (year 2014) is used to analyze the effect of three depreciation methods on the road asset value. Road assets include land and structures (pavement, bridge, and tunnel). This study mainly focuses on structures such as bridges and tunnels, because according to governmental accounting standards, land and road pavement assets do not depreciate. RESULTS : The main results of this study are as follows. Firstly, overall asset value of national highway route 1 was estimated at 6.97 trillion KRW when MOSF's method (straight-line depreciation method) is applied. Secondly, asset value was estimated at 4.85 trillion KRW on application of consumption-based depreciation method. Thirdly, asset value was estimated at 4.37 trillion KRW when condition-based depreciation method is applied. Therefore, either consumption-based or condition-based depreciation methods would be more appropriate than straight-line depreciation method if we can use the condition data of road assets including land that are available in real time. CONCLUSIONS : Since road assets such as pavements, bridges, and tunnels have various patterns of deterioration and condition monitoring period, it is necessary to consider a specific valuation method according to the condition of each road asset. Firstly, even though road pavements do not depreciate, asset valuation through condition-based depreciation method would be more appropriate when requirements for application of non-depreciation approach are not satisfied. Since bridge and tunnel facilities show various patterns of deterioration and condition monitoring period by type and condition level, consumption-based depreciation method based on deterioration model would be appropriate. Therefore, it is necessary to have a reasonable asset management system to apply condition-based depreciation method and a periodic condition investigation to manage road assets well.

An Investigation for Driving Behavior on the On-Ramp Merging Section in Urban Underground Roads Using a Driving Simulator (주행 시뮬레이터를 활용한 도심 지하도로 유입연결로 합류부 주행행태 분석)

  • Seungwon Jeong;Soohwan Kim;Dongmin Lee;Gunki Jung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.97-114
    • /
    • 2022
  • Unlike ground roads, the on-ramp merging section of underground roads cannot be seen by drivers of main road due to tunnels. In this study, a driving simulator was used for analysis, and virtual driving experiments were carried out to assess the driver's visibility for different design factors. The driver's driving behavior was analyzed by setting scenarios considering the length of chevron markings and the approach speed from the main road. The results of the analysis were used to determine the design factors for ensuring visibility when constructing the virtual driving environment for each scenario. These factors, including speed, lane change points, and driver's gaze ratios, were reviewed for significance using a statistical approach. As a result, in scenarios with a higher approach speed from the main road, it was discovered that there was a difference in driver's behavior between specific scenarios depending on the length of the section with chevron markings. Based on these findings, this study suggests implications and feasible solutions to improve driver safety on the on-ramp merging section of underground roads.

Study on Influencing Factors of Traffic Accidents in Urban Tunnel Using Quantification Theory (In Busan Metropolitan City) (수량화 이론을 이용한 도시부 터널 내 교통사고 영향요인에 관한 연구 - 부산광역시를 중심으로 -)

  • Lim, Chang Sik;Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.173-185
    • /
    • 2015
  • This study aims to investigate the characteristics and types of car accidents and establish a prediction model by analyzing 456 car accidents having occurred in the 11 tunnels in Busan, through statistical analysis techniques. The results of this study can be summarized as below. As a result of analyzing the characteristics of car accidents, it was found that 64.9% of all the car accidents took place in the tunnels between 08:00 and 18:00, which was higher than 45.8 to 46.1% of the car accidents in common roads. As a result of analyzing the types of car accidents, the car-to-car accident type was the majority, and the sole-car accident type in the tunnels was relatively high, compared to that in common roads. Besides, people at the age between 21 and 40 were most involved in car accidents, and in the vehicle type of the first party to car accidents, trucks showed a high proportion, and in the cloud cover, rainy days or cloudy days showed a high proportion unlike clear days. As a result of analyzing the principal components of car accident influence factors, it was found that the first principal components were road, tunnel structure and traffic flow-related factors, the second principal components lighting facility and road structure-related factors, the third principal factors stand-by and lighting facility-related factors, the fourth principal components human and time series-related factors, the fifth principal components human-related factors, the sixth principal components vehicle and traffic flow-related factors, and the seventh principal components meteorological factors. As a result of classifying car accident spots, there were 5 optimized groups classified, and as a result of analyzing each group based on Quantification Theory Type I, it was found that the first group showed low explanation power for the prediction model, while the fourth group showed a middle explanation power and the second, third and fifth groups showed high explanation power for the prediction model. Out of all the items(principal components) over 0.2(a weak correlation) in the partial correlation coefficient absolute value of the prediction model, this study analyzed variables including road environment variables. As a result, main examination items were summarized as proper traffic flow processing, cross-section composition(the width of a road), tunnel structure(the length of a tunnel), the lineal of a road, ventilation facilities and lighting facilities.

Numerical Analysis on the Performance Evaluation of Cablebolts as Tunnel Supports (터널 지보재로서 케이블볼트의 성능평가에 관한 수치해석적 연구)

  • Park, Yeon-Jun;Park, Joon-Hyoung
    • Tunnel and Underground Space
    • /
    • v.22 no.2
    • /
    • pp.130-143
    • /
    • 2012
  • Cablebolts used to be employed as auxiliary supports where long or high capacity bolts are needed, but become competitive by the improvements in supportability and easiness in handling. Based on the test results obtained from various researches, the performance of the cablebolts was analyzed numerically while varying lengths and fixing conditions. The supporting effecte is assessed by monitoring displacements and stress taken place in shotcrete. When cablebolts are grouted without being tensioned, supporting effect was not as good as that of rockbolts. But, their supportability was good enough to substitute rockbolts if tensioned properly. Post grouting right after tensioning of the cablebolts shows reduction in supportability, but long term stability could be achieved without losing supportability if grouted when the bolt is far enough from the face. Further study is necessary including laboratory and in-situ tests under various conditions to use cablebolts as main support in tunnels.