• Title/Summary/Keyword: lowest total cost

Search Result 141, Processing Time 0.029 seconds

Risk-averse Inventory Model under Fluctuating Purchase Prices (구매가격 변동시 위험을 고려한 재고모형)

  • Yoo, Seuck-Cheun;Park, Chan-Kyoo;Jung, Uk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.4
    • /
    • pp.33-53
    • /
    • 2010
  • When purchase prices of a raw material fluctuate over time, the total purchasing cost is mainly affected by reordering time. Existing researches focus on deciding the right time when the demand for each period is replenished at the lowest cost. However, the decision is based on expected future prices which usually turn out to include some error. This discrepancy between expected prices and actual prices deteriorates the performance of inventory models dealing with fluctuating purchase prices. In this paper, we propose a new inventory model which incorporates not only cost but also risk into making up a replenishment schedule to meet each period's demand. For each replenishment schedule, the risk is defined to be the variance of its total cost. By introducing the risk into the objective function, the variability of the total cost can be mitigated, and eventually more stable replenishment schedule will be obtained. According to experimental results from crude oil inventory management, the proposed model showed better performance over other models in respect of variability and cost.

Economic performance of cable supported bridges

  • Sun, Bin;Zhang, Liwen;Qin, Yidong;Xiao, Rucheng
    • Structural Engineering and Mechanics
    • /
    • v.59 no.4
    • /
    • pp.621-652
    • /
    • 2016
  • A new cable-supported bridge model consisting of suspension parts, self-anchored cable-stayed parts and earth-anchored cable-stayed parts is presented. The new bridge model can be used for suspension bridges, cable-stayed bridges, cable-stayed suspension bridges, and partially earth-anchored cable-stayed bridges by varying parameters. Based on the assumption that each structural member is in either an axial compressive or tensile state, and the stress in each member is equal to the allowable stress of the material, the material quantity for each component is calculated. By introducing the unit cost of each type of material, the estimation formula for the cost of the new bridge model is developed. Numerical examples show that the results from the estimation formula agree well with that from the real projects. The span limit of cable supported bridge depends on the span-to-height ratio and the density-to-strength ratio of cables. Finally, a parametric study is illustrated aiming at the relations between three key geometrical parameters and the cost of the bridge model. The optimization of the new bridge model indicates that the self-anchored cable-stayed part is always the dominant part with the consideration of either the lowest total cost or the lowest unit cost. It is advisable to combine all three mentioned structural parts in super long span cable supported bridges to achieve the most excellent economic performance.

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

Hazard and Risk Assessment and Cost and Benefit Analysis for Revising Permissible Exposure Limits in the Occupational Safety and Health Act of Korea (산업안전보건법 허용기준 대상물질의 허용기준 개정을 위한 유해성·위험성 평가 및 사회적 비용·편익 분석)

  • Kim, Ki Youn;Oh, Sung Eop;Hong, Mun Ki;Lee, Kwon Seob
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.25 no.2
    • /
    • pp.134-145
    • /
    • 2015
  • Objectives: An objective of this study was to perform a risk assessment and social cost-benefit analysis for revising permissible exposure limits for seven substances: Nickel(Insoluble inorganic compounds), benzene, carbon disulfide, formaldehyde, cadmium(as compounds), trichloroethylene, touluene-2,4-diisocyanate. Materials and Methods: The research methods were divided into risk and hazard assessment and cost-benefit analysis. The risk and hazard assessment for the seven substances consists of four steps: An overview of GHS MSDS(1st), review of document of ACGIH's TLVs (2nd), comparison between international occupational exposure limits and domestic permissible exposure limits(3rd), and analysis of excess workplace and excess rate for occupational exposure limits based on previous work environment measurement data(4th). Total cost was estimated using cost of local exhaust ventilation, number of excess workplace and penalties for exceeding a permissible exposure limit. On the other hand, total benefit was calculated using the reduction rate of occupational disease, number of workplaces treating each substance and industrial accident compensation. Finally, the net benefit was calculated by subtracting total cost from total benefit. Results: All the substances investigated in this study were classified by CMR(Carcinogens, Mutagens or Reproductive toxicants) and their international occupational exposure limits were stricter than the domestic permissible exposure limits. As a result of excess rate analysis, trichloroethylene was the highest at 11%, whereas nickel was the lowest at 0.5%. The excess rates of all substances except for trichloroethylene were observed at less than 10%. Among the seven substances, the total cost was highest for trichloroethylene and lowest for carbon disulfide. The benefits for the seven substances were higher than costs estimated based on strengthening current permissible exposure limits. Thus, revising the permissible exposure limits of the seven substances was determined to be acceptable from a social perspective. Conclusions: The final revised permissible exposure limits suggested for the seven substances are as follows: $0.2mg/m^3$ for nickel, 0.5 ppm(TWA) and 2.5 ppm(STEL) for benzene, 1 ppm(TWA) for carbon disulfide, $0.01mg/m^3$(TWA) for cadmium, 10 ppm(TWA) and 25 ppm(STEL) for trichloroethylene, 0.3 ppm(TWA) for formaldehyde, and 0.005 ppm(TWA) and 0.02 ppm(STEL) for toluene diisocynate(isomers).

Economic analysis of thorium extraction from monazite

  • Salehuddin, Ahmad Hayaton Jamely Mohd;Ismail, Aznan Fazli;Bahri, Che Nor Aniza Che Zainul;Aziman, Eli Syafiqah
    • Nuclear Engineering and Technology
    • /
    • v.51 no.2
    • /
    • pp.631-640
    • /
    • 2019
  • Thorium ($^{232}Th$) is four times more abundant than uranium in nature and has become a new important source of energy in the future. This is due to the ability of thorium to undergo the bombardment of neutron to produce uranium-233 ($^{233}U$). The aim of this study is to investigate the production cost of thorium oxide ($ThO_2$) resulted from the thorium extraction process. Four main parameters were studied which include raw material and chemical cost, total capital investment, direct cost and indirect cost. These parameters were justified to obtain the final production cost for the thorium extraction process. The result showed that the raw material costs were $63,126.00 - $104,120.77 (0.5 ton), $126,252.00 - $178,241.53 (1.0 ton), and $1,262,520.00 - $1,782,415.33 (10.0 tons). The total installed equipment and total cost investment were estimated to be approximately $11,542,984.10 and $13,274,431.715 respectively. Hence, the total costs for producing 1 kg $ThO_2$ were $6829.79 - $6911.78, $3540.95 - $3592.94, and $501.18 - $553.17 for 0.5, 1.0, and 10.0 tons respectively. The result concluded that with higher mass production, the cost of 1 kg $ThO_2$ would be reduced which in this scenario, the lowest production cost was $$501.18kg^{-1}$-$$553.17kg^{-1}$ for 10.0 tons of $ThO_2$ production.

A study on the cost state of the stow net Fishery (근해안강망어업경영의 원가실태에 관한 연구)

  • 박정호
    • The Journal of Fisheries Business Administration
    • /
    • v.9 no.2
    • /
    • pp.59-89
    • /
    • 1978
  • The analyzed results of the actual state of stow net fishery based on the cost expended are as follows. According to the calculation of interests, the total cost of this fishery comes to ₩38,010,653 and in this account, the production cost comes to ₩35,477,198(93.3%), the material cost, 14,567,239(38.3%), the labour cost, 12,740,274(33.5%), the expenses, ₩8,169,685(21.5%), the commision and administration expenses, 2,533,455(6.7%). The expenses for this fishery are paid out as production costs, and the expenses for sale and administration expenses are the lowest of them, and the 93% of expenses are paid out as production costs. The ratio of cost element to 100% is as follow. The wages, 28.4%, fuel, 15.2%, repair, 11.6%, deprecation, 9.5%, fishing gear, 8.7%, ice, 6.1%, container(box for fish), 5.2% administration expenses, 5.2%, food, 3.5%, ship grar, 3.2%, public welfare, 1.7%, commision for sale, 1.5%, insurance for crew, 0.2%, taxes, 0.2%. This fishery is managed with the larger fishing boat than it was and so, it demands better crews with higher wages. In the former fishery, the search for fishing ground is very difficult with long navigation and great fuel consumption. when the weak fishing gears are used, the expenses for their repair and for their gears are greatly paid out. The unit costs of catches to each box come to ₩2.807(₩187 each kg). As the ratio of cost of sales comes to 86.7%and the ratio of interests comes to ₩5,850,812(13.3%), and so the net profit comes to 13.3% of total profits. According to above the ratio of cost of sales is shown as a universal validity, Asthe total expenses comes to 86.7% to the money on sales in the break-even point, the break-even point comes to ₩26,209,168 Accordingly for the profit control the account of production should be raised, and by the saving method of expenditure the break-even point should be brought down for the development of total profits.

  • PDF

APPROACHING A LINEAR PROGRAMMING MODEL FOR PRODUCTION PLANNING OF A READY-MADE GARMENTS INDUSTRY

  • SAYMA SURAIYA;MD. BABUL HASAN
    • Journal of applied mathematics & informatics
    • /
    • v.41 no.1
    • /
    • pp.215-228
    • /
    • 2023
  • The ready-made garments (RMG) have been making a crucial contribution about of 81% of total export and 12.36 % of total GDP of the country which is now the single biggest export earner for Bangladesh. The cheap production cost is the key important factor to explore this RMG sector. But these RMG sector is running on the basis of intuition based decisions. Though they are making profit it is not optimal. In this study, a deterministic model is developed to help the RMG to minimize the production cost and to maximize their profit along with optimal utilization of available resources. 10 different types of products are taken from one of the garments factories of Gazipur, Dhaka to prepare this research work. This model suggests the manufacturer on which products along with how much should be produced to meet the future demand by maintaining the lowest production cost that ultimately maximize the profit of the organization, and also helps Bangladesh to compete in the international market with 'Made in Bangladesh'. LINDO programming is used here to solve this LP model.

Policy Safety Stock Cost Optimization : Xerox Consumable Supply Chain Case Study (정책적 안전재고의 비용 최적화 : 제록스 소모품 유통공급망 사례연구)

  • Suh, Eun Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.5
    • /
    • pp.511-520
    • /
    • 2015
  • Inventory, cost, and the level of service are three interrelated key metrics that most supply chain organizations are striving to optimize. One way to achieve this goal is to create a simulation model to conduct sensitivity analysis and optimization on several different supply chain policies that can be implemented in actual operation. In this paper, a case of Xerox global supply chain modeling and analysis to assess several "what if" scenarios for the consumable policy safety stock is presented. The simulation model, combined with analytical cost model and optimization module, is used to optimize the policy safety stock level to achieve the lowest total value chain cost. It was shown quantitatively that the policy safety stock can be reduced, but it is offset by the inbound premium transportation cost to expedite supplies in shortage, and the outbound premium transportation cost to send supplies to customers via express shipment, requiring fine balance.

SMALL SCALE DAIRYING IN THREE FARMING SYSTEMS IN EAST JAVA I. FARMER'S INCOME AND HOUSEHOLD CHARACTERISTICS

  • Widodo, M.W.;de Jong, R.;Udo, H.M.J.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.7 no.1
    • /
    • pp.19-29
    • /
    • 1994
  • The annual income (gross margin) in 1989/90 of a sample of 274 farmers in seven milk cooperatives was analyzed in the sugar cane, cassava, and horticulture areas in East Java. On average dairying contributed 42%, crops 29% and off-farm revenue 29%. Dairy income was highest in the cassava area, where it compensated for the low crop income, and lowest in the sugar cane area. Farm area and average milk yield per day per cow correlated positively with farmer's income, whereas crop income increase significantly with farm area and with the number of cows. The level of total cost per cow had a negative impact on dairy and with the number of cows. The level of total cost per cow had a negative impact on dairy and on total income. Government officials and other professionals engaged in dairying had a significantly higher total income than those with their main occupation in dairying, cropping or working as farm labourers. Uneducated farmers obtained a significantly larger income through crops, whereas farmers with tertiary education obtained more income through off-farm work, This study suggests that more attention must be paid to the actual use of labour and the improvement of the dairy output/cost ratio.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.