The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

Improvement the bidding system in domestic construction engineering procurement (국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구)

  • Choi, Bong-Gun;Park, Sung-Je;Joh, Hoon-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.632-637
    • /
    • 2006
  • Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.

  • PDF

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

ANALYZING CAUSES OF CHANGE ORDERS IN KOREA ROAD PROJECTS

  • Kang-Wook Lee;Wooyong Jung;Seung Heon Han;Byeong-Heon Yoon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1283-1287
    • /
    • 2009
  • The Korean government implemented 259 road projects from 2004 to 2007, valued at $18.4 billion. Change orders of these road projects occurred 8,973 times and, subsequently, caused significant increases in the cost of the projects, approximately up to $4.2 billion (22.8% of the initial budget). These significant problems of huge change orders require a more workable control system for budget management whereas the effectiveness of the government's control is still not satisfied. However, previous approaches and studies mostly limited their analyses to simply classifying the causes of the change orders. This paper investigates the real frequency and cost impacts incurred by each cause of a change order, primarily based on 218 road projects in Korea. The paper then identifies the attributes of change orders through a survey of 204 project participants in that those sources were inevitable or avoided if properly managed. The causes of the change orders are further analyzed with analysis of variance (ANOVA) in connection with contract volume, bid award rate, the contractor's capacity to perform, and the design company's capacity. This study found that if the contract volume is smaller, then the possibility of change orders is higher. Interestingly, if the bid award rate is less than 67.5%, it signifies the highest rate of change orders. In addition, the contractors whose construction ability is assessed as the top-ranked group showed the lowest change order rates. With these results, this paper provides the preventive guidelines for reducing the likelihood of change orders.

  • PDF

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF