• Title/Summary/Keyword: low vibration sand compaction pile

Search Result 3, Processing Time 0.021 seconds

Case History of Low Vibration and Low Noise Granular Pile Method in the Area of Incurred the Popular Enmity (민원발생지역에서의 저진동$\cdot$저소음 Granular Pile의 시공사례)

  • Chun, Byung-Sik;Kim, Baek-Young
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.176-181
    • /
    • 2003
  • Damages by vibration and noise due to the construction performance are increasing. The rise of construction demand and enlargement of equipments are major reasons of this damage. As a result, the enmity of the people is provoked and this appears to be an obstacle of construction work. Especially, in case of ground improvement construction. Casing pipe is inserted into the Sand Drain, Sand Compaction Pile and Vibrated Crushed-stone Pile by vibration power when carrying out. Hence, a pillar is formed and it creates vibration and noise. This causes a lot of restrictions to construction condition. The low Vibration and low noise construction equipments uses earth auger and hydrulic cylinder for insertion and chopping operation instead of vibro hammer, which is the source of vibration and noise. This minimize ground disturbanceand decrease vibration and noise successfully, but increase chopping effect greatly. Thus, this new equipment is not only suitable for environment but also excellent engineering method of construction.

  • PDF

Analysis of Ground Improvement Effect of Low Vibration Sand Compaction Pile Method (저진동 모래다짐말뚝(LVSCP)의 지반개량효과 분석)

  • Kim, Jong-Kook;Cha, Jun-Tae;Lee, Jae-Chang;Chae, Young-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1234-1242
    • /
    • 2010
  • In this study, the effect of noise and vibration, and influence of ground improvement are evaluated and its application is analyzed through the example of SCP designed at ground improvement in Song-Do international city. consequently, it showes even comfortable result that it is about 5.0m of inner space, when the LVSCP method is applied, rather than that it is about 30m of inner space when the existing SCP is applied in vibration control standards 2.0mm/sec. In the noise, now that the many differences according to environmental factors like other equipment noise, limited space and so on at the time of the construction by LVSCP method are coming out, so we think that appro itate measures are needed according to surroundings. By the way, when it comes to the estimation of the ground improvement work before and after an improvement of LVSCP method, its result shows that it is satisfacttion to all the standards of compaction control in dregded and reclaimed ground and sedimentary clay layer.

  • PDF