Proceedings of the KSR Conference (한국철도학회:학술대회논문집)
- 2003.10b
- /
- Pages.176-181
- /
- 2003
Case History of Low Vibration and Low Noise Granular Pile Method in the Area of Incurred the Popular Enmity
민원발생지역에서의 저진동$\cdot$ 저소음 Granular Pile의 시공사례
- Published : 2003.10.01
Abstract
Damages by vibration and noise due to the construction performance are increasing. The rise of construction demand and enlargement of equipments are major reasons of this damage. As a result, the enmity of the people is provoked and this appears to be an obstacle of construction work. Especially, in case of ground improvement construction. Casing pipe is inserted into the Sand Drain, Sand Compaction Pile and Vibrated Crushed-stone Pile by vibration power when carrying out. Hence, a pillar is formed and it creates vibration and noise. This causes a lot of restrictions to construction condition. The low Vibration and low noise construction equipments uses earth auger and hydrulic cylinder for insertion and chopping operation instead of vibro hammer, which is the source of vibration and noise. This minimize ground disturbanceand decrease vibration and noise successfully, but increase chopping effect greatly. Thus, this new equipment is not only suitable for environment but also excellent engineering method of construction.
Keywords