Longitudinal arching effect of an under-passing tunnel on the existing tunnel undergoing a load of upper structures (상부 구조물 하중의 영향을 받는 기존터널에 직각 교차하는 하부 터널의 종방향 아칭효과)

  • Lee, Yong-Jun;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.417-427
    • /
    • 2010
  • In the ease that a new cross tunnel is constructed under the existing tunnel, development of a longitudinal arching would be influenced by the existing tunnel. But it is not enough to investigate. Especially, the influence of the structure loads on the ground surface on the new tunnel, which the under-passes existing tunnel has been rarely studied. This study, therefore, aimed to clarify the effect of the existing tunnel and the structure on the ground surface on the development of a longitudinal ground arching during the excavation of a cross tunnel under the existing tunnel. Two-dimensional model tests were carried out in the test box, whose dimension was 30 cm (wide) ${\times}$ 113 cm (deep) ${\times}$ 87 cm (high). The existing tunnel was made of S21 steel tube in 16 cm diameter and 1 mm thickness. The ground surface load was 4.9 kPa and was loaded on the model structure in the size with 30 cm width ${\times}$ 16 cm height. New tunnel was excavated in 250 mm height by a bench cut method. As results, the longitudinal arching would be developed but it was severely influenced by not only the existing upper tunnel but also the ground surface load. The influence of the ground surface load on the development of longitudinal ground arching around a new tunnel showed the highest value when the tunnel face located direct under the surface load.

Behavior of the ground in rectangularly crossed area due to tunnel excavation under the existing tunnel (I) (기존터널에 근접한 직각교차 하부터널의 굴착에 따른 교차부지반의 거동 (I))

  • Kim, Dong-Gab;Kim, Seung-Hyun;Hong, Suk-Bong;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.3-12
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel Rectangularly crossed to that was studied. Model tests were performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density. Results of the model tests show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

Behavior of the Ground in Obliquely Crossed area Due to Tunnel Excavation Under the Existing Tunnel (기존터널에 근접하여 경사로 교차되는 하부터널굴착에 따른 교차부지반의 거동)

  • Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.4
    • /
    • pp.285-294
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel crossed to that was studied. Model test was performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density and test with the crossed angle of $56^{\circ}$ (obliquely) were performed. The numerical analysis was performed on equal condition with model test. Results of the study by model test and numerical analysis show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Model test shows that upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

3-Dimensional Tunnel Analyses for the Prediction of Fault Zones (파쇄대 예측을 위한 터널의 3차원 수치해석)

  • 이인모;김돈희;이석원;박영진;안형준
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.99-112
    • /
    • 1999
  • When there exists a fault zone ahead of the tunnel face and a tunnel is excavated without perceiving its existence, it will cause stress concentration in the region between the tunnel face and the fault zone because of the influence of the fault zone on the arching phenomena. Because the underground structure has many unreliable factors in the design stage, the prediction of a fault zone ahead of the tunnel face by monitoring plans during tunnel construction and the rapid establishment of appropriate support system are required for more economical and safer tunnel construction. Recent study shows that longitudinal displacement changes during excavation due to the change of rock property, and if longitudinal displacement and settlement, which are measured in the field, are considered together in displacement analysis, the prediction of change in rock mass property is possible. This study provided the method for the prediction of fault zones by analyzing the changes of L/C and (Ll-Lr)/C ratio (L= longitudinal displacement at crown, C = settlement at crown, Ll = longitudinal displacement at left sidewall, Lr = longitudinal displacement at right sidewall) and the stereographic projection of displacement vectors which were obtained from the 3-D numerical analysis of hybrid method in various initial stress conditions.

  • PDF

Theoretical Analysis of Embankment Loads Acting on Piles (성토지지말뚝에 작용하는 연직하중의 이론해석)

  • 홍원표;이재호;전성권
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.1
    • /
    • pp.131-143
    • /
    • 2000
  • Several theoretical analyses are performed to predict the vertical load on embankment piles with cap beams. The piles are installed in a row in soft ground below the embankment and the cap beams are placed perpendicular to the longitudinal axis of the embankment. Two failure mechanisms such as the soil arching failure and the punching shear failure are investigated according to the failure pattern in embankment on soft ground supported by piles with cap beams. The soil arching can be developed when the space between cap beams is narrow and/or the embankment is high enough. In the investigation of the soil arching failure, the stability in the crown of the arch is compared with that above the cap beams. The factors affecting the load transfer in the embankment fill by soil arching are the space between cap beams, the width of cap beams and the soil parameters of the embankment fill. The portion of the embankment load carried by cap beams decreases with increment of the space between cap beams, while it increases with the embankment height, the width of cap beams, the internal friction angle and cohesion of the embankment fill. Thus, the factors affecting load transfer in embankment should be appropriately decided in order to maximize the effect of embankment load transfer by piles.

  • PDF

An Experimental Study on the Two Dimensional Behaviors due to Excavation of Crossed Tunnel below existing tunnel (기존터널 하부에 교차하여 굴착되는 터널의 2차원 거동 특성에 대한 실험적 연구)

  • Hong, Suk-Bong;Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.119-131
    • /
    • 2005
  • The two dimensional behaviors of the existing upper tunnel and the ground at crossed area due to the excavation of a lower tunnel were studied experimentally, The model tests were conducted by changing the relative location of the existing upper tunnel and the lower tunnel. The results of the study show that a vertical earth pressure outside the loosened area was increased due to longitudinal arching effect same as a single tunnel. In case vertical distance between the upper and lower tunnel is 0.7 H and 1.0 H respectively (H is a height of the lower tunnel), vertical earth pressure increased in the loosened area behind the tunnel face. But when a vertical distance is 1, 3 H, ground behaviors appeared similarly to a single tunnel.

  • PDF

Prediction of Change in Ground Condition Ahead of Tunnel Face Using Three-dimensional Convergence Analysis (터널 3차원 내공변위의 해석을 통한 막장전방 지반상태변화 예측)

  • 김기선;김영섭;유광호;박연준;이대혁
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.476-485
    • /
    • 2003
  • The purpose of this study is to present an analysis method for the prediction of the change of ground conditions. To this end, three-dimensional convergence displacements is analyzed in several ways to estimate the trend of displacement change. Three-dimensional arching effect is occurred around the unsupported excavation surface including tunnel face when a tunnel is excavated in a stable rock mass. If the ground condition ahead of tunnel face changes or a weak fracture zone exists a specific trend of displacement change is known to be occurred from the results of the existing researches. The existence of a discontinuity, whose change in front of the tunnel face, can be predicted from the ratio of L/C (longitudinal displacement at crown divided by settlement at crown) etc. Therefore, the change of ground condition and the existence of a fracture zone ahead of tunnel face can be predicted by monitoring three-dimensional absolute displacements during excavation, and applying the methodology presented in this study.

Nonlinear Analysis considered Confinement Effect of Precast Concrete Segment (프리캐스트 콘크리트 세그먼트의 구속효과를 고려한 비선형 해석)

  • Lee, Heon-Min;Kim, Tae-Hoon;Park, Jae-Keun;Kim, Young-Jin;Shin, Hyun-Mock
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.305-308
    • /
    • 2008
  • The purpose of this study is to propose the confinement effectiveness of precast segmental concrete that binding by lateral confining steel in the method of precast segmental concrete pridge piers construction. Generally, the confinement effect of concrete that binding by lateral confining steel is defined by the confinement effectiveness coefficient and the confinement effectiveness coefficient is defined as the ratio of area of effectively confined concrete core to area of confined concrete core. The area of effectively confined concrete core is defined by Arching action occurred on a space of lateral confinement steel and The area of confined concrete core is defined by the ratio of area of longitudinal reinforcement to area of core of section. But in case of precast segmental concrete, concrete cover that exist on top and bottom of concrete segment should be considered.

  • PDF

A Study on the Characteristics of Stress Transfer around Cavern due to Cavern size and Rock Joint Orientation by Laboratory Model Test (모형실험을 통한 공동규모와 절리 방향성에 따른 공동배면의 응력전이 특성에 대한 연구)

  • Kim, Sang-Hwan;Shin, Beom-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.595-606
    • /
    • 2009
  • This paper presents the characteristics of stress transfer around carven due to cavern size and rock joint properties by laboratory model test. In order to perform this study, eight different scaled model tests were carried out according to excavation stage. The limited numerical analysis were also performed to verify the model test results. The amount of stress transfer around the cavern is increased and then decreased by longitudinal arching effect according to tunnel excavation. It is founded that the stress developed around the cavern during excavation is increased when the cavern size and joint orientation are increased. It is also investigated that shear behaviour (such as stress, deformation) developed around cavern is considerably depended on the characteristic of fill material, dip and direction of joints. It is suggested that the behaviour will be verified throughout the 3D numerical prediction.

  • PDF

Model Tests for Vertical Loads Acting on Embankment Piles (성토지지말뚝에 작용하는 연직하중에 대한 모형실험)

  • 홍원표;강승인
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.4
    • /
    • pp.171-181
    • /
    • 2000
  • A series of model tests were performed both to investigate the load transfer by soil acrching in fills above embankment pils and to verify of the theoretical analysis. In the model tests, the piles were installed in a row below the embankment and the cap beams were placed on the pile heads perpendicular to the longitudinal axias of the embankment. The space between pile cap beams and the embankment height was focused as the major factors affecting the load transfer in embankment fill. When the embankment fill was higher than the minimum required height, which was about 33% higher than the radius of the soil arch proposed by theoretical discussion in the previous study, not only the soil arching could be developed completely but also the experimental results showed good agreement with theoretical predictions. The portion of the embankment load carried by model pile cap beams decreased with increment of the space between pile cap beams, while it increased with increment of the embankment height. Therefore, to maximize the effect of embankment load transfer by piles on design, the interval ratio of pile cap beams should be decreased under considerably high embankments by reducing the space between cap beams and/or enlarging the width of pile cap beams.

  • PDF