• Title/Summary/Keyword: long-term settlements

Search Result 49, Processing Time 0.026 seconds

Experimental Evaluation of Construction Performance and Long-term Settlements in Soft Ground Breakwater (연약지반 방파제의 시공성능 및 장기침하에 관한 실험적 평가)

  • Kwon, O-Soon;Jang, In-Sung;Park, Woo-Sun;Yum, Ki-Dai
    • Ocean and Polar Research
    • /
    • v.25 no.spc3
    • /
    • pp.385-392
    • /
    • 2003
  • A new type of soft ground breakwater was recently developed, which does not need ground improvement because of light weight and structural characteristics. The various studies about consolidation settlements and lateral behavior of proposed soft ground breakwater have been conducted. But, the systematic investigations on the construction performance and long-term settlements of new type breakwater has not been accomplished. In this study, construction simulation of soft ground breakwater with soil box model test and experiments of the long-term wave loaded breakwater were performed. The results of test shows that it is possible to compensate differential settlements by dead loading and/or suction pressure, and to reduce the consolidation settlements by preloading method. It was also found that the vertical and lateral displacements of long-term wave loaded breakwater were negligible.

Prediction of Long-term Settlement in the Big Reclamation Site Using GIS (GIS 기법을 이용한 대규모 매립지반의 장기침하 예측)

  • 김홍택;이혁진;김영웅;김진홍;김홍식
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.2
    • /
    • pp.107-121
    • /
    • 2002
  • In this study, GIS(Geographic Information System), a new approaching method, is proposed to effectively manage long-term settlements in the big reclamation sites. To verify an applicability of the proposed method, the prediction of long-term settlements which may occur in the overall soft deposits of the Incheon International Airport is carried out. During the process of the prediction of long-term settlements, measured settlement data obtained from an early stage of preloading are analyzed in detail. For purposes of the analysis, an estimation of the recompression index is also made based on the Nagaraj's research results. The coefficient of the secondary consolidation is further determined based on the relationship presented by the Mesri & Godlewski, which defines a ratio between the coefficient of the secondary consolidation and the recompression index.

Assessment of long-term behaviour of a shallow tunnel in clay till

  • Wang, Z.;Wong, R.C.K.;Heinz, H.
    • Geomechanics and Engineering
    • /
    • v.2 no.2
    • /
    • pp.107-123
    • /
    • 2010
  • Ground settlements and pore pressure changes were monitored around a shallow tunnel constructed in clay till during the excavation and primary lining installation. The settlements above the tunnel continued to develop for up to 100 days after the primary lining installation. Triaxial compression tests were carried out to estimate the short-term and long-term deformation characteristics of the till. Numerical simulation was conducted to history match the field measurements, and thus, to quantify the settlements induced by ground stress relief, consolidation and creep. It was found that the surface settlements due to ground stress relief, consolidation and creep are 17, 12 and 71% of total settlement (about 44 mm), respectively. In addition, early installation of rigid concrete lining could be an effective means to reduce the settlement due to creep.

Study on the effect of tail void grouting on the short- and long-term surface settlement in the shield TBM Tunneling using numerical analysis (쉴드TBM터널에서 뒤채움 주입이 지반의 단기·장기 침하에 미치는 영향에 대한 수치해석적 연구)

  • Oh, Ju-Young;Park, Hyunku;Kim, Dohyoung;Chang, Seokbue;Lee, Seungbok;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.265-281
    • /
    • 2017
  • For shallow tunnel constructions, settlement of the ground surface is a main issue. Recent technical developments in shield TBM tunneling technique have enabled a decrease in such settlements based on tunneling with ground deformation controls. For this objective, the tail void grouting is a common practice. Generally surface settlements in a soil of low permeability occur during a tunnel construction but also during a long period after completion of the tunnel. The long-term settlements occur mainly due to consolidation around the tunnel. The consolidation process is caused and determined by the tail void grouting which leads to an excess pore water pressure in the vicinity of the tunnel. Because of this, the grouting pressure has a strong effect on the long-term settlements in the shield tunneling. In order to investigate this effect, a series of coupled hydro-mechanical 3D finite element simulations have been performed. The results show that an increase in grouting pressure reduces the short-term settlements, but in many cases, it doesn't lead to a reduction of the final settlements after the completion of consolidation. Thereby, the existence of a critical grouting pressure is identified, at which the minimal settlements are expected.

Long-term consolidation characteristics of dredged and reclaimed ground (준설매립지반의 장기압밀 특성)

  • Lee, Choong-Ho;Kim, Ju-Hyun;Baek, Won-Jin;Chae, Young-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.486-493
    • /
    • 2008
  • Consolidation settlements on marine dredged clays are often greatly and potentially damaging to structures. Currently, large-scale projects are in planning or progressing in Korea. These projects has been performed on thick and soft clay layers. So, the evaluation of long-term consolidation settlement is very important in design and construction. Therefore, In this study, a long-term consolidation characteristics of marine dredged clays are investigated. First, the relationship of $C_{\alpha}/C_c$ on marine dredged clays near Gwang-yang Port was evaluated. Second, long-term consolidation characteristics of the pseudo-preconsolidated ground were evaluated.

  • PDF

Long-term Settlement Characteristics of Closed Landfill (사용종료 쓰레기매립지의 장기침하특성 분석)

  • 정하익;진현식;김상근;이강민;김태섭
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.605-610
    • /
    • 2002
  • Waste body settlement is an important aspect of management of landfill sites both during the operational and the post-closure phases. Settlement in landfill waste is caused by combination of load, creep and biodegradation induced effects. In this paper, settlement characteristics of closed waste landfill were studied by analyzing in situ measured data and computer simulation technique. Techniques for the analysis of load-induced and creep settlement, and for their implementation, can be adapted for landfill waste. The estimate of settlements from models shows a increase according to time.

  • PDF

A Study on the Practical Estimation Technique of a Long-term Settlement by the Observation Results in the Field (현장계획에 의한 연약지반의 장기 침하 예측지법에 관한 실증적 연구)

  • 서수봉;김수삼
    • Journal of Ocean Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.35-44
    • /
    • 1991
  • This study was carried out for the purpose of pre-estimating long-term settlement under condition of actual field soil's property, in case of building up industrial sites on the marine deposit silty clay located at West Coast in Korea. This study analyzed Hyperbolic Method, Square Root Time Method and Exponential Function Method with utilization of measured survey values of settlement in In-Cheon Namdong Industrial Sites. In the future, for the continuos utilization, it seemed to be needed that further the survey values of fields should be accurartely measured for the analysis of more accurate pre-estimate about long-term settlement. Among the prediction methods of settlement Hyperbolic Method seemed to be the best fitting method for measured data. The settlement equations were derived from above three methods, for long-term settlements.

  • PDF

A Prediction of Long-Term Settlement in Large Reclamated Sites Using Laboratory Consolidation Tests and GIS Techniques (실내압밀시험과 GIS 기법을 이용한 대규모 매립지역의 장기침하량 예측)

  • Park, Sa-Won;Kim, Hong-Taek;Park, Sung-Won;Baek, Seung-Cheol;Park, Sang-Kwon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.3
    • /
    • pp.5-19
    • /
    • 2006
  • The secondary consolidation settlement of soft clay is generally very little compared to the total settlement and occurs very slowly during long-term period. However the secondary consolidation settlement is comparatively large amount in organic and heavily compressed clay and is a very important engineering factor. In order to reduce residual settlements in reclaimed soft ground, the preloading method is often used. In this study, in order to determine reasonable long-term settlements of large reclaimed site, laboratory incremental loading consolidation tests and surcharging consolidation tests are performed. Sampling was done at Incheon area of west coast and Gwangyang area of south coast in Korea. The characteristics of secondary consolidation have obtained through laboratory tests and analyzed systematically to predict long-term settlements. Additionally, the location data and laboratory test results are correlated by using GIS(geographic information system). The secondary consolidation settlement of the site was predicted based on D/B and the operation technique and estimation technique of space of GIS.

  • PDF

Long-term Compressible Settlement of Coal Ash and Tire Shred as Fill Materials (석탄회 및 폐타이어 재료의 장기 압축 침하 거동 특성)

  • Lee, Sung-Jin;Shin, Min-Ho;Hwang, Seon-Keun;Lee, Yong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.858-865
    • /
    • 2009
  • Based on the proven feasibility of bottom ash and tire shred-soil mixtures as lightweight fill materials, tire shred-bottom ash mixtures were suggested as a new lightweight fill material to replace the conventional construction material with bottom ash. Therefore, we carried out the laboratory test, field compaction test and performance test of large scale embankment in order to evaluate their suitability for the use of lightweight fill materials in the before studies. We could verified that the ash, tire-shred and the mixture are able to be the useful materials as light fill materials. In this study, we estimated the long-term compressible settlements for 6 materials such as TA(Tire-Bottom Ash mixture), TBA(Tire-Bottom Ash<5mm) mixture, TWS(Tire-Weathered Soil mixture), Bottom Ash, Bottom Ash(<5mm), Weathered soils.

  • PDF

Settlement analysis of viscoelastic foundation under vertical line load using a fractional Kelvin-Voigt model

  • Zhu, Hong-Hu;Liu, Lin-Chao;Pei, Hua-Fu;Shi, Bin
    • Geomechanics and Engineering
    • /
    • v.4 no.1
    • /
    • pp.67-78
    • /
    • 2012
  • Soil foundations exhibit significant creeping deformation, which may result in excessive settlement and failure of superstructures. Based on the theory of viscoelasticity and fractional calculus, a fractional Kelvin-Voigt model is proposed to account for the time-dependent behavior of soil foundation under vertical line load. Analytical solution of settlements in the foundation was derived using Laplace transforms. The influence of the model parameters on the time-dependent settlement is studied through a parametric study. Results indicate that the settlement-time relationship can be accurately captured by varying values of the fractional order of differential operator and the coefficient of viscosity. In comparison with the classical Kelvin-Voigt model, the fractional model can provide a more accurate prediction of long-term settlements of soil foundation. The determination of influential distance also affects the calculation of settlements.