• Title/Summary/Keyword: load priority

Search Result 207, Processing Time 0.029 seconds

A Study on Algorithm for Determining Seismic Improvement Priority of Highway Bridges (도로교 내진보강 우선순위 결정을 위한 알고리즘에 관한 연구)

  • Kim, Hyung-Gyu;Jang, Il-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.6
    • /
    • pp.138-147
    • /
    • 2018
  • With the recent series of damage caused by earthquakes in Korea, such as Gyeongju and Pohang, we know that Korea is no longer a safe zone for earthquakes and that we need to be prepared for them. In addition, bridges built prior to the introduction of seismic design concepts remain without adequate seismic reinforcement measures, and earthquake reinforcement should be performed efficiently considering economic and structural safety. Preliminary assessment of seismic performance of existing bridges is divided into four seismic groups, taking into account seismicity, vulnerability and Impact, considering the magnitude of the existing bridge's seismic, and prioritization for further evaluation of seismic performance. In this study, unlike the existing anti-seismic reinforcement priority method, scores are calculated based on the seismic design criteria applied to bridges, importance coefficient of the bridge including the zone coefficient and the Importance, vulnerability index of the bridge including the soil condition and the elapsed years, detail coefficient of the bridge including the superstructure form, the span length, the width, the height, the design load, and the daily traffic volume. The calculated score items will be weighted and grouped according to the results. Using this, a simpler and more efficient algorithm was proposed to determine the priority of seismic reinforcement on a bridge.

Application of Priority Order Selection Technique for Water Quality Improvment in Stream Watershed by Relationship of Flow and Water Quality (유량-수질관계 비교를 통한 하천 수질개선 우선순위 선정기법 적용)

  • Lim, Bong-Su;Cho, Byung-Wook;Kim, Young-Il;Kim, Do-Young
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.8
    • /
    • pp.802-808
    • /
    • 2010
  • This study was carried out to apply the method of priority order selection for water quality improvement of watershed. The monitoring of flow and water quality, grouping branch streams and discharge load density were estimated on 18 branch streams located in middle and lower area of Geum River, Chungcheongnam-do. Based on average BOD concentration of stream at low flow, the results of the water quality analysis of stream which excess river living standard class 2 (less than BOD 3 mg/L) are Jeongancheon, Bangchukcheon, Gilsancheon, Jocheon, Seokseongcheon and Ganggyeongcheon. As a result of grouping stream, stream that have more than $10\;m^3/min$ of flow and more than 3.0 mg/L of average BOD concentration such as Group A are Jocheon, Seokseongcheon, Ganggyeongcheon and Jeongancheon. In Group A, stream corresponds to over than discharge load density as of 10 BOD kg/$day{\cdot}km^2$ is Jocheon, Seokseongcheon and Ganggyeongcheon. In view of the selected results to improve water quality basin through monitoring of flow and water quality, grouping stream, and estimation of discharge load density, Jocheon in Yeongi, Seokseongcheon located on the border of Buyeo and Nonsan, Ganggyeongcheon on Nonsan such as stream basin were urgent to improve water quality.

Decision of Critical Area Due to NPS Pollutant Loadings from Kyongan Stream Watershed using BASINS-SWAT (BASINS-SWAT 모델을 이용한 경안천 유역의 비점원 오염배출 중점관리 대상지역 결정)

  • Jang, Jae-Ho;Yoon, Chung-Gyeong;Jung, Kwang-Wook;Son, Yeung-Kwon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.69-78
    • /
    • 2009
  • In order to improve water quality of upper watershed of Paldang reservoir, it is necessary to evaluate non-point source pollution loads and identify critical watershed pollution sources. A GIS based Soil and Water Assessment Tool was applied to evaluate model application and reliability, estimate NPS pollution load, identify critical watershed by NPS pollution sources, and suggest various best management practices for Kyongan Stream watershed. Yearly NPS pollution loads were estimated 30.0% SS, 60.1% TN and 35.4% TP, respectably. The watershed pollution load is mainly decided by precipitation condition and SS and nutrients load have a significant regression relationship. Based on 10-year average yearly NPS pollution load, critical sub-watersheds were identified. The No. 5 and 17 which have lots of relatively intensive agricultural fields and scattered industrial area were vary critical sub-watersheds and under more intensive pollution load. In order to control critical watershed, watershed best management practices such as scientific fertilizer, contour farming and parallel terrace, transferring the sloppy farmland to grass or forest and constructing a buffer zone, and constructing wetlands and retention ponds will be applied. Overall the SWAT model can be efficiently used for identification of critical sub-watersheds in order to develop a priority watershed management plan to reduce water pollutions.

Economic Load Dispatch Considering Power System Reliability under the Deregulated Electricity Market (규제완화된 전력시장 하에서의 전력계통 신뢰도를 고려한 경제부하배분)

  • Kim, Hong-Sik;Lim, Chae-Hyeun;Choi, Jae-Seok;Cha, Jun-Min;Rho, Dae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.391-393
    • /
    • 2000
  • This paper presents an new algorithm for the economic load dispatch considering the reliability level constraints of composite power system under deregulated electricity market. It is the traditional ELD problem that generation powers have been dispatched In order to minimize total fuel cost subjected to constraints which sum of powers generated must equal the received load and no violating lower and upper limit constraints on generation. Under deregulated electricity market, however, generation powers of a pool have to be reallocated newly in order to satisfy the reliability differentiated level required at a load point because of a reliability differentiated electricity service which is a part of the priority service. In this study, new economic load dispatch algorithm for reallocating the generation powers of a pool in order to satisfy the reliability differentiated level under deregulated competitive electricity market is proposed. The uncertainties of not only generators but also transmission lines are considered fer the reliability evaluation. The characteristics and effectiveness of this methodology are illustrated by the case studies on MRBTS and IEEE-RTS.

  • PDF

Performance Evaluation of Multiplexing Algorithms with Both Delay and Loss Priorities in ATM Networks (ATM 통신망에서의 지연 및 손실 우선순위를 갖는 다중화 알고리즘의 성능 평가)

  • 전용희
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.19 no.5
    • /
    • pp.842-856
    • /
    • 1994
  • The various services that a broadband integrated services digital network (B-ISDN) carries, have a wide range of delay, delay jitter and cell loss probability requirements. Design of appropriate control schemes for B-ISDN is an extremely important and challenging problem. In this paper, we proposed multiplexing algorithm with both delay and loss priorities in order to satisfy the diverse requirements. For the implementation of cell lose priority, we assumed that voice cells are generated as non-discardable(i.e., high priority) and discardable (i.e., low priotity)cells. The low priority voice cell may be discarded inside the network if congestion occurs. The cell dropping scheme is shown to reduce cell losses as well as delays for both voice and data. Such a load shedding scheme is expected to improve significantly utilization of B-ISDN.

  • PDF

Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach

  • Heo, Jae-Haeng;Kim, Mun-Kyeom;Kim, Dam;Lyu, Jae-Kun;Kang, Yong-Cheol;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1248-1257
    • /
    • 2014
  • Overhead transmission lines are crucial components in power transmission systems. Well-designed maintenance strategy for overhead lines is required for power utilities to minimize operating costs, while improving the reliability of the power system. This paper presents a maintenance priority index (MPI) of overhead lines for a reliability centered approach. Proposed maintenance strategy is composed of a state index and importance indices, taking into account a transmission condition and importance in system reliability, respectively. The state index is used to determine the condition of overhead lines. On the other hand, the proposed importance indices indicate their criticality analysis in transmission system, by using a load effect index (LEI) and failure effect index (FEI). The proposed maintenance method using the MPI has been tested on an IEEE 9-bus system, and a numerical result demonstrates that our strategy is more cost effective than traditional maintenance strategies.

A Priority Index Method for Efficient Charging of PEVs in a Charging Station with Constrained Power Consumption

  • Kim, Seung Wan;Jin, Young Gyu;Song, Yong Hyun;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.4
    • /
    • pp.820-828
    • /
    • 2016
  • The sizable electrical load of plug-in electric vehicles may cause a severe low-voltage problem in a distribution network. The voltage drop in a distribution network can be mitigated by limiting the power consumption of a charging station. Then, the charging station operator needs a method for appropriately distributing the restricted power to all plug-in electric vehicles. The existing approaches have practical limitation in terms of the availability of future information and the execution time. Therefore, this study suggests a heuristic method based on priority indexes for fairly distributing the constrained power to all plug-in electric vehicles. In the proposed method, PEVs are ranked using the priority index, which is determined in real time, such that a near-optimal solution can be obtained within a short computation time. Simulations demonstrate that the proposed method is effective in implementation, although its performance is slightly worse than that of the optimal case.

Simulation of a Mobile Patient Monitoring System with Load-balancing (부하 조절을 지원하는 이동환자 상시 모니터링 시스템 시뮬레이션)

  • Choi, Eun Jung;Kim, Myuhng Joo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.4
    • /
    • pp.67-73
    • /
    • 2010
  • A Wireless Sensor Network(WSN) is a promising infrastructure for the future U-healthcare system. In a WSN for the U-healthcare system, both biometric data and location data are transferred hierarchically from lots of mobile patients to the base station server and some countermeasures are made in real time if necessary. In this process, we encounter the load-balancing problem when many patients gather in a specific area. We also encounter the data duplication problem when each patient moves into an area monitored by several supervisors. The second problem is closely related to the first one. In this paper, we propose a mobile patient monitoring system with priority-based policy in load-balancing to solve the previous two problems and perform a DEVS Java-based system simulation to verify the system efficiency.

A Study on the Development of Battery Energy Storage System (전지이용 전력저장장치 기술개발)

  • Hwang, Yong-Ha;Lee, Keun-Seob
    • Proceedings of the KIEE Conference
    • /
    • 1993.07b
    • /
    • pp.905-907
    • /
    • 1993
  • Demand for electricity is increasing annually. Especially, the daytime demand grawth shows higher than any other time period. So the big difference between maximum and minimum electrical demand becomes another important problem to be solved. The Battery Energy Storage System is chosen as one of the solutions among the sevral methods. The purpose of utilization of Battery Energy Storage System is to improve the daily load factor. Also, Battery Energy Storage System may be used for the load levelling or the load shifting as well as the spinning reserve. Up to now, only the pumped hydro power plant system has been operated on the commercial basis, but this system has so many constraints such as site, environmental effects, construction period, ect. Being considered current electrical power situation the development of electric storage system is in need latly. Among the various electric storage systems, Battery Energy System is chosen with the top priority because it has sevral merits to cover such as the short construction period, the demand site installation, and the food environmental characteristics.

  • PDF

A Study on the IPv6 Multihoming Mechanism using Loadsharing Broker.

  • Kim, Dong-Kyun;Park, Hak-Soo;Kim, Seong-Hae;Whang, Il-Sun
    • Journal of Scientific & Technological Knowledge Infrastructure
    • /
    • s.7
    • /
    • pp.141-148
    • /
    • 2001
  • This paper describes a mechanisms for IPv6 multihomming with loadsharing broker, focusing on the interdomain scalability and load sharing with redundancy on IPv6 networks. Unlike currently-practiced IPv4 multihoming, this model does not impact the worldwide routing table size, also it provides inbound load sharing at site level based on router renumbering, and multiple-prefix assigning techniques of IPv6. The proposed model has four modules such as building interfaces MIB module, priority list maintaining module, load detection module, and RRP configuration module.

  • PDF