• 제목/요약/키워드: lining concrete

검색결과 320건 처리시간 0.023초

초음파법을 이용한 무근콘크리트 터널라이닝의 품질평가 (Evaluation of Tunnel Lining Concrete Using Ultrasonic Pulse Velocity Method)

  • 최홍식;이시우;신용석;오영석;오광진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.795-800
    • /
    • 2001
  • Two evaluation techniques of the tunnel lining concrete using ultra sonic velocity method are developed. Modified linear regression technique is proposed to enhance the corelation between the pulse velocity and the compressive strength of core specimens. And bivariate normal distribution is assumed to evaluate the quality of concrete as a terms of compressive strength. A simple corelation table between the pulse velocity and the compressive strength of core specimens are proposed.

  • PDF

쉴드 터널용 프리캐스트 세그먼트 콘크리트 라이닝의 내화성능 (Fire Resistance Performance of Precast Segmental Concrete Lining for Shield Tunnel)

  • 한병찬;하라다카즈노리;권영진;김윤용
    • 대한토목학회논문집
    • /
    • 제34권1호
    • /
    • pp.95-105
    • /
    • 2014
  • 철근콘크리트 쉴드 터널 라이닝은 대형화재 등과 같은 고온에 노출될 경우, 구조체에의 급격한 온도 전달 및 내하력 저하로 구조체 붕괴의 원인이 될 수 있기 때문에 내화성능을 확보해야 한다. 이 연구는 쉴드터널의 프리캐스트 RC 세그먼트 라이닝에 대한 내화성능을 평가하고자 실험/해석적 연구를 수행하였다. 실험적 연구에서는 프리캐스트 RC 세그먼트내의 열적 취약부위를 실험변수로 하여 6개의 실 대형 실험체에 대한 내화실험을 실시하였으며, 화재조건은 RABT 곡선에 의한 온도이력을 이용하였다. 내화실험결과 이 연구에서 제시된 쉴드형 터널의 PP섬유 혼입콘크리트 충전부위는 폭렬이 발생하지 않는 우수한 내화성능을 나타내었다. 해석적 연구에서는 온도의존성을 고려한 재료의 열특성을 고려하여 비정상 유한요소 온도분포해석 기법을 이용하였는데, 실험결과를 잘 모사하는 것으로 검증되었다.

공용중인 터널의 변상에 대한 보강 및 자동화계측 사례 (Case Studies of Automatic Measurement and strength for Damage in the Public Tunnel)

  • 한자중;김영호;장기수;권영정;안상로
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.270-281
    • /
    • 2005
  • An especial attention for old tunnel safety is required on increasing of The various tunnel recently. Specially, the lining investigation method of the old tunnel will be able to presume condition of concrete lining indirectly. Because it is many restriction thought of environment and ground condition investigation method of tunnel lining rear. This study carried out section & convergence measurement of part which was deformed in tunnel lining. It had been observed for the change of tunnel behavior with a continuous measurement. It has been analyzed for a cause of tunnel deformation and inspected for the effect after a repair-reinforcement to tunnel compared with the effect before those by structure analysis. By establishing automatic measurement system after repair-reinforcement to tunnel, it would be accomplished to convergence measurement continually. As a result, it was observed that deflection and deformation of tunnel was convergent. but it should be followed to a continuous maintenance because of unstable ground condition, cause of inner tunnel, environment. The railroad tunnel which was executed a reinforcement of the tunnel lining must investigate the close condition of reinforcement lining and concrete lining.

  • PDF

대단면 터널 라이닝 콘크리트의 균열저감 연구 (A Study on Crack Control of Tunnel Lining Concrete with Large Section)

  • 김완영
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.509-512
    • /
    • 2008
  • 라이닝콘크리트란 터널의 영구적인 라이닝으로서 무근 또는 철근콘크리트로 구축되는 터널의 가장 내측에 시공되는 터널의 부재를 말하며. 라이닝의 목적은 터널주변 암반의 풍화방지 및 유수에 의한 지반열화 경감, 터널의 내구성 증대 등이다. 라이닝시 콘크리트는 시공불량, 내부응력, 건조수축 등에 따라 균열을 야기할 수 있으며, 콘크리트 구조물에서 발생하는 이러한 균열은 내구성의 저하와 외관의 손상을 초래하여 사용성을 저하시킬 뿐만 아니라, 균열로 인한보수비용을 증대시킨다. 본 연구는 직경이 15m 이상의 대단면 터널의 라이닝콘크리트의 실제 현장에서 발생한 균열에 대하여 발생하는 균열에 대한 구조, 재료에 대한 분석을 수행하였으며, 그 결과를 제시하므로서 합리적이고 효율적인 대단면 터널 라이닝콘크리트의 균열에 대한 대책을 제시하고자 한다.금번 검토 결과, 구조적 특성에 의한 것이 아님을 알 수 있었으며 다음과 같이 몇가지 원인에 대한대책을 통해 균열을 저감할 수 있을 것이다. 1) 하절기배합인 플라이애쉬 20% 배합으로 변경하면, 수화열 저감효과와 함께 초결시간 지연 효과도 가져올 수 있으므로 연직균열 및 수평균열에 유리한 조건을 만들어 줄 수 있을 것으로 사료된다. 2) 균열이 주로 발생된 S.L 부근의 다짐방법과 관련하여 다음과 같이 개선코자 한다. 즉, 3단과 4단투입구간(間)계면 방지를 위하여 4단 투입구를 통하여 일부 콘크리트를 타설 후 타설중지 상태에서 3단과 4단 투입 콘크리트를 같이 다짐을 실시한다. 이 때 주의할 점은 3단 타설 콘크리트의 초결 이전에 재다짐이 되어야 하므로 전체 시간을 6시간 이내에 완료해야 한다(플라이애쉬 20% 혼입 조건). 3) 일단 S.L 부근까지 콘크리트를 타설한 후, 하단부 콘크리트가 충분히 침강이 일어날 수 있도록 30분 내외 타설을 중지하였다가 후속 콘크리트를 타설토록 한다.

  • PDF

콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구 (Development of Inspection System for Crack on the Lining of Concrete Tunnel)

  • 고봉수;손영갑;신동익;김병화;한창수
    • 제어로봇시스템학회논문지
    • /
    • 제10권1호
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

Simplified nonlinear simulation for composite segmental lining of rectangular shield tunnels

  • Zhao, Huiling;Liu, Xian;Yuan, Yong
    • Structural Engineering and Mechanics
    • /
    • 제81권4호
    • /
    • pp.513-522
    • /
    • 2022
  • Steel-concrete composite segments replacing the conventional reinforced concrete segments can provide the rectangular shield tunnel superiorities on bearing capacity, ductility and economy. A simplified model with high-efficiency on computation is proposed for investigating the nonlinear response of the rectangular tunnel lining composed of composite segments. The simulation model is developed by an assembly of nonlinear fiber beam elements and spring elements to express the transfer mechanism of forces through components of composite segments, and radial joints. The simulation is conducted with the considerations of material nonlinearity and geometric nonlinearity associated with the whole loading process. The validity of the model is evaluated through comparison of the proposed nonlinear simulation with results obtained from the full-scale test of the segmental tunnel lining. Furthermore, a parameter study is conducted by means of the simplified model. The results show that the stiffness of the radial joint at haunch of the ling and the thickness of inner steel plate of segments have remarkable influence on the behaviour of the lining.

터널 콘크리트 라이닝 및 공동구 신축이음 설치방안에 관한 연구 (A Study on the Expansion Joint of Concrete Lining and Duct in a Tunnel)

  • 손무락;박양흠;박윤재;김재견;윤종철
    • 한국지반공학회논문집
    • /
    • 제31권3호
    • /
    • pp.39-50
    • /
    • 2015
  • 터널 내 콘크리트 라이닝 및 공동구에는 일반적으로 구조물의 형상 및 강성이 변화하는 위치, 부등침하의 우려가 있는 위치, 온도변화가 심한 곳 등에 신축이음을 설치하여 균열발생을 최소화시키고 있다. 하지만, 설치되는 신축이음의 소요간격은 터널내의 온도변화, 구조물의 시공 및 환경조건, 구조물과 배면지반과의 인터라킹 등에 의해서 영향을 받아 그 간격을 정량적으로 제시하기에는 한계가 있다. 그럼에도 불구하고 고속도로 전문시방서(Korea Expressway Corporation, 2012)나 도로설계편람(Ministry of Land, Transport and Maritime Affairs, 2010)에 의하면 콘크리트 라이닝의 신축이음은 터널 입출구부 50m 이내에서는 25m 이하 간격으로 터널 내부에서는 20-60m 간격으로 일률적으로 설치하도록 되어 있어(공동구는 별도기준이 없어 라이닝 기준 준용) 터널건설과 관련하여 여러 가지 시공 및 경제적 문제점을 야기하고 있다. 따라서 본 연구에서는 이와 같은 문제점을 해소하기 위하여 신축이음 관련 국내 외 설계기준 및 시방서 기준들을 분석함과 더불어 터널내의 신축이음 관련 현장시험시공과 이론 및 수치해석적 검토 등을 수행하여 터널내의 콘크리트 라이닝 및 공동구의 신축이음 설치방안에 대한 기준을 재정립하였다.

터널 시공이음부에서의 방수재 역할에 대한 실험연구 (An Experimental Study on Performance of neater Stops at Construction joints in Tunnel)

  • 백송훈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.217-223
    • /
    • 1999
  • Mostly, water leakage took place in construction joints. In case of cable tunnels constructed by open-cut method, waterstops have been used to prevent the water leakage. But, we haven't any experience to install the waterstops in NATM cable tunnels. So, it is necessary to develope the waterstops and test the performance of it in laboratory. We manufactured cable tunnel lining quarter scale model by pouring concrete, and installed the waterstops. After filling the inside of concrete lining about two-third with water, we put the air pressure on the water, In addition, it is also carried out water leakage test for concrete lining model without waterstops. As a result, we confirmed the performance of waterstops and its adaptability. It is also tested that the performance of rubber gaskets used in concrete segments of Shield tunnelling. In addition, we determined the allowable infiltration rate for cable tunnel with non-drainage system.

  • PDF