Transactions of the KSME C: Technology and Education
/
v.1
no.2
/
pp.199-204
/
2013
In this paper, a new system requirement management tool and its application on the Urban Transit Maglev Project were introduced. In most R&D projects on complexity system such as transportation system, Systems Engineering(SE) activities are included on each project, and SE teams are using commercial computer-based tools to perform the SE activities. Even though SE tools help to manage huge data and documents on engineering efficiently, but well-designed functions of SE tools which support SE activities are not sufficiently used on the whole process of system engineering. In order to computer-based SE tools are to be effectively used on project management, most engineers who takes engineering and coordination roles, at least sub-project managers should be familiar to the tool and could be easily use it, but usability of commercial SE tools are very difficult for normal engineers with no experience on SE activities and SE tools. To overcome this difficulty, we developed a new system requirement management tool considering each user's scenario on using engineering tools. The developed tool could not cover whole SE processes, but designed to perform requirement engineering such as system requirements(SRs) management, specification management, traceability management, SRs' verification activity management and so on. All the entities on SR database are inter-connected by pre-recognized traceabilities, so even non-specialists on SE can easily browse the database and find entities concern, and linked information such as interacted entities, legal or engineering constraints, coordination documents, status of development and verification and so on. Also functions for SR verification tools, TPM(Technical Performance Measure) tools, DB searching tools with traceability, and report generation tools are included on the system.
PARK, Jeong-Woo;YIM, Du-Hyun;NAM, Kwang-Woo;KIM, Jin-Young
Journal of the Korean Association of Geographic Information Studies
/
v.19
no.4
/
pp.52-62
/
2016
Smart City is urban development for complex problem solving that provides convenience and safety for citizens, and it is a blueprint for future cities. In 2008, the Korean government defined the construction, management, and government support of U-Cities in the legislation, Act on the Construction, Etc. of Ubiquitous Cities (Ubiquitous City Act), which included definitions of terms used in the act. In addition, the Minister of Land, Infrastructure and Transport has established a "ubiquitous city master plan" considering this legislation. The concept of U-Cities is complex, due to the mix of informatization and urban planning. Because of this complexity, the foundation of relevant regulations is inadequate, which is impeding the establishment and implementation of practical plans. Smart City intelligent service facilities are not easy to define and classify, because technology is rapidly changing and includes various devices for gathering and expressing information. The purpose of this study is to complement the legal definition of the intelligent service facility, which is necessary for integrated management and operation. The related laws and regulations on U-City were analyzed using text-mining techniques to identify insufficient legal definitions of intelligent service facilities. Using data gathered from interviews with officials responsible for constructing U-Cities, this study identified problems generated by implementing intelligent service facilities at the field level. This strategy should contribute to improved efficiency management, the foundation for building integrated utilization between departments. Efficiencies include providing a clear concept for establishing five-year renewable plans for U-Cities.
This study is an overview of the processing of national defense reform in the meantime and to analyze the development of alternative processes are conducted in all the service system operating status of the military regime aims at prese-nting the efficient utilization of natural science and engineering professionals. The purpose of this study was to discuss about the efficient utilization of science and engineering professionals according to the Defense Reform organized as follows. Chapter 2 looked into the concept of conscription system and cause for change, Chapter 3 analyzed utilization of science and engineering professionals and the practices related to engineering and professional workforce. Chapter 4 took to understand the military system improvement based on the derived implications will be presented the role of the relevant ministries. Chapter 5 Conclusion would present a summary of the results discussed above and deploy the argument in the direction. The study conclusions are First, the need to develop alternative military service system in the desired direction to derive a social consensus about the survival of the Selective Service System Status. Second, to establish a provisional Armed Forces to train science and engineering professionals with superior officers and noncom missioned officers and they should be able to contribute to the develop-ment of an individual's development and the national economy. In particular, legal and trial and error and failures of the system was carried out in the past in the process of seeking the required institutional improvements should not make the error to repeat.
Kim, Beop-su;Seong, Gi-gang;Bae, In-ho;Bang, Hong-soon;Choi, Hyeong-jin;Kim, Ok-kyue
Korean Journal of Construction Engineering and Management
/
v.20
no.4
/
pp.104-113
/
2019
Construction dispute about Extension of Time are complexly intertwined with various issues. The duration delay analysis defines the impact the issue has on the duration variation. And The international court and the arbitrator use the results of the analysis as a basis for reasonable duration judging. However, most of the domestic Construction sites have not established a business process for Extension of Time litigation. Therefore, Analysis data are collected after the occurrence of the dispute, there is not enough basic data of analysis almost. This study sought to improve the management efficiency by organizing information requirement for delay analysis and suggesting a reasonable business process. As a result of applying the proposed process to actual construction duration extension disputes, about 33% of practitioners, 46% of contractors, and 48% of legal advisors were satisfied with the process application site And Matrix validation was 91% identical. This study suggests that it is possible to increase the efficiency of the construction duration analysis work used as a basis in the construction dispute. Finally, the Computer based system design for this process should continue in the future.
Kim, Youngse;Park, Jinhyung;Kim, Sangki;Kim, Byungjick;Lee, Joonwon;Park, Kyoshik
Korean Chemical Engineering Research
/
v.60
no.4
/
pp.492-498
/
2022
Process control systems used in most domestic petrochemical corporates today are based on the Windows platforms. As technology leans toward opened environment, the exposure risk of control systems is increasing. However, not many companies are preparing for various cyberattacks due to lack of awareness and misunderstanding of cyber intrusion. This study investigated the extent of how much exposed the petrochemical process control system is to security threats and suggested practical measures to reduce OT cybersecurity vulnerabilities. To identify the cyber threat status of process control systems, vulnerabilities of the Windows platform, a principal cyber threat factor, have been analyzed. For research, three major DCS providers in Korea and the discontinuation of Windows platform of 635 control systems were investigated. It was confirmed that 78% of the survey subjects were still operating in the discontinued windows platforms, and those process control systems were operated in a state vulnerable to cyber intrusions. In order to actively cope with these cyber threats, legal regulations such as designation of critical infrastructure for major petrochemical facilities which is implemented in advanced countries such as the United States are needed. Additionally, it is necessary to take the initiative in eradicating security threats to the process control systems by aggressively introducing security solutions provided from existing DCS suppliers. This paper was submitted to Professor Ko JaeWook's retirement anniversary issue.
Park Yoonkyung;Yun Sang-Lean;Yoon Younghan;Kim Reeho;Nishimura Fumitake;Sturat L. Simpson;Kim Ilho
Journal of Korean Society on Water Environment
/
v.39
no.3
/
pp.231-239
/
2023
Public sewage treatment facilities are a necessary infrastructure for public health that treat sewage generated in cities and basin living areas and discharge it into rivers or seas. Recently, the role of public sewage treatment is receiving attention as a place of use of wastewater-based epidemiology (WBE), which analyzes human specific metabolic emissions or biomarkers present in sewage to investigate the environment to which the population is exposed in the water drain. WBE is mainly applied to investigate legal and water-law drug use or to predict and analyze the lifestyle of local residents. WBE has also been applied to predict and analyze the degree of infectious diseases that are prevalent worldwide, such as COVID-19. Since sewage flowing into public sewage treatment facilities includes living information of the population living in the drainage area, it is easy to collect basic data to predict the confirmation and spread of infectious diseases. Therefore, it is necessary to establish a new role of public sewage treatment facilities as an infrastructure necessary for WBE that can obtain information on the confirmation and spread of infectious diseases other than the traditional role of public sewage treatment. In South Korea, the sewerage supply rate is about 95.5% and the number of public sewage treatment facility is 4,209. This means that the infrastructure of sewerage is fully established. However, to successfully drive for WBE , research on monitoring and big-data analysis is needed.
Korean Journal of Construction Engineering and Management
/
v.25
no.3
/
pp.3-16
/
2024
The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.
Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
KIPS Transactions on Software and Data Engineering
/
v.12
no.11
/
pp.471-480
/
2023
The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.
Journal of the Korea Institute of Information and Communication Engineering
/
v.21
no.11
/
pp.2176-2183
/
2017
The value of Big-Data which is a main factor of the fourth Industrial Revolution enhances industrial productivity in private sector and provides administrative services for nations and corporates in public sector. ICT-developed countries are coming up with Big-Data application in public sector rapidly. Especially, when it comes to social crisis management, they are equipped with pre-forcasting system. Korean Government also emphasizes Big-Data application in public sector for the social crisis management. But the reality where the overall infrastructure vulnerability reveals requires preparation and operation of measurement for social problems. Accordingly, we need to analyze Big-Data application problem and benchmark the precedented cases, thereby, direct policy diversity. Hence, this paper proposes the roles and rules of E-government analyzing problems from Big-Data application. The following policy proposes open Information and legal&institutional improvement, Big-Data service considerations threatening privacy issues in Big-Data ecosystem, necessity of operational and analytical technology for Big-Data and related technology in technical implication of Big-Data.
Biodegradation of the reactive dye, Remazol Black B was investigated in an upflow anaerobic sludge blanket(UASB) reactor. Important parameters studied include dye concentration(20-60 mg/L), glucose concentration as a co-substrate(1,000-3,000 mg/L), hydraulic retention time(3-24 hr), and influent pH(6.0-8.0). Under most conditions tested, the molecules of Black B were degraded readily and completely according to HPLC chromatograms. However, the color removal efficiency based on spectroscopic measurement was always approximately 75%. This suggests that the degradation products have some color intensity corresponding to 25% of the original dye molecules. The maximum influent dye concentration which satisfies the legal discharge limit of color intensity of 400 ADMI was 13 mg/L. and the highest removal rate at this dye concentration was 104 mg/L${\cdot}$day.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.