• Title/Summary/Keyword: lead time demand

Search Result 205, Processing Time 0.029 seconds

A Regression-Based Approach for Central Warehouse Location Problem (중앙창고 입지선정을 위한 회귀분석기반 해법)

  • Yoo, Jae-Wook;Lee, Dong-Ju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.2
    • /
    • pp.57-65
    • /
    • 2009
  • In continuous review inventory model, (${\varrho}$, ${\gamma}$) system, order quantity(${\varrho}$) and reorder point(${\gamma}$) should be determined to calculate inventory-related cost that consists of setup, holding, and penalty costs. The procedure to obtain the exact value of ${\varrho}$ and ${\gamma}$ is complex. In this paper, a regression analysis is proposed to get the approximate inventory-related cost without the determination of ${\varrho}$ and ${\gamma}$ in the case that the standard deviation(${\sigma}$) of the lead time demand is small or that the mean(${\mu}$) of the lead time demand is proportional to ${\sigma}$. To save inventory-related cost, central warehouses with (${\varrho}$, ${\gamma}$) system can be built. Central warehouse can provide some stores with products with the consideration of the tradeoff between inventory-related cost and transportation cost. The number and the location of central warehouses to cover all the stores are determined by a regression-based approach. The performance of the proposed approach is tested by using some computational experiments.

A study on The Career Development of Hote1 Cooks (호텔 기업의 조리사 경력개발 관리에 관한 연구)

  • 오석태
    • Culinary science and hospitality research
    • /
    • v.8 no.1
    • /
    • pp.23-41
    • /
    • 2002
  • Ordinary, the hotel Career Development that cooks are hi red, then OJT and evaluation, disposition. It means that cook to set in order with licence and to carry-out effect But it is not continue forever about the job demand, attitude, ability of cook. The Executive Chef and depart of career development have to plan for problems now and a long time of time to cooks. Demand of cook career development are sociality and economical. Because the hotel needs a high-grade cook for keep competitive in changing surround. internal resources are more effect ive when require without delay man power than hire urgent. It is not only lack career development to cook, probably face up to retirement at one time and foment social order but also cook lose their a right to labor. Cook supports their family and grow, economic base for ethical by labor, so have to carry their point. In addition the domestic five stars hotel's career development structure are very simple and infirm, so it cause stagnation to position, lead to negative vision and show a drop in efficiency. Therefore the hotel must investment about Career Development.

  • PDF

An Inventory Problem with Lead Time Proportional to Lot Size and Space Constraint (로트크기에 비례하는 리드타임과 공간 제약을 고려한 재고관리 정책)

  • Lee, Dongju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.109-116
    • /
    • 2015
  • This paper is concerned with the single vendor single buyer integrated production inventory problem. To make this problem more practical, space restriction and lead time proportional to lot size are considered. Since the space for the inventory is limited in most practical inventory system, the space restriction for the inventory of a vendor and a buyer is considered. As product's quantity to be manufactured by the vendor is increased, the lead time for the order is usually increased. Therefore, lead time for the product is proportional to the order quantity by the buyer. Demand is assumed to be stochastic and the continuous review inventory policy is used by the buyer. If the buyer places an order, then the vendor will start to manufacture products and the products will be transferred to the buyer with equal shipments many times. The mathematical formulation with space restriction for the inventory of a vendor and a buyer is suggested in this paper. This problem is constrained nonlinear integer programming problem. Order quantity, reorder points for the buyer, and the number of shipments are required to be determined. A Lagrangian relaxation approach, a popular solution method for constrained problem, is developed to find lower bound of this problem. Since a Lagrangian relaxation approach cannot guarantee the feasible solution, the solution method based on the Lagrangian relaxation approach is proposed to provide with a good feasible solution. Total costs by the proposed method are pretty close to those by the Lagrangian relaxation approach. Sensitivity analysis for space restriction for the vendor and the buyer is done to figure out the relationships between parameters.

A Stochastic Partial Backorder Inventory System with a linear Backorder Ratio (선형 부재고비율(線形 負在庫比率)을 갖는 확률적 부분부재고(確率的 部分負在庫)시스템에 관한 연구(硏究))

  • Lee, Kang-Woo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.3
    • /
    • pp.105-116
    • /
    • 1994
  • This paper presents an inventory model with partial backorders for the situation in which demand is deterministic, lead time follows normal distribution and back order ratio during the stockout period varies in proportion to the length of backorder period In this situations, an objective function is formulated to minimize a time-proportional backorder cast and a fixed penalty cost per unit lost. And then the procedure of iterative solution method for the model is developed to find optimal reorder paint and order quantity and a numerical example to illustrate the proposed method is presented.

  • PDF

Smart Grid (긴급제언 - 스마트 그리드)

  • Chung, Choon-Byeong
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.6
    • /
    • pp.36-41
    • /
    • 2009
  • Smart Grid is grafting IT(information technology) techniques on existing electric power network, supplier and the consumer to do real-time exchange of information lead to both direction and energy efficiency optimization, it is a next potential electric power network method. Because of applying various distributed electric power sources, the electric power network system will follow in size and it is dispersive and it will operate independently, and it become the intelligent electric power network, which in consumer demand reacts at real-time, because of using various sensors. In this article explain concept, features, and contemporary background of Smart Grid, and describe improve reliability of the electric power quality.

  • PDF

A Study on the Demand Research for Facilities of Logistics from Factor Comparison (요인비교법을 통한 물류시설 수요조사에 관한 연구)

  • Yoon, Tomes;Kim, Tae-Seok;Lee, Geon-Su;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.5
    • /
    • pp.103-110
    • /
    • 2007
  • To build a most efficient and competitive warehouse, need to reflect tenants various opinions in advance such as location, rentable size, leasing terms, rental, configuration of the building, building structure, traffic flow and amenities. Thus a survey for major tenants which are logistics, retailers and manufactures should be done to figure out potential demand and marketing strategy to lead to be a competitive warehouse. However above survey is time consuming work and requires high cost involvement thus to avoid such an inefficient process and to facilitate investors prompt and right decision making, there should be a tool which helps to make a decision process easier with simple key factors. In other word, we have used above mentioned 'Demand Approach' so far but here I am introducing 'Factors Comparison' which reflects location factors and facility factors. I derived Kwang-myung logistics park's proper rental rate through 'Demand Approach' which analyzed Seoul Metropolitan area's rental warehouse status and rents, and also defined a size of potential demand area and rental. And this report compared the result with an outcome of 'Factors Comparison' then compared each methods and drew a conclusion of 'Factors Comparion's better convenience and efficiency.

The Effect of (Q, r) Policy in Production-Inventory Systems

  • Kim, Joon-Seok;Jung, Uk
    • Management Science and Financial Engineering
    • /
    • v.15 no.1
    • /
    • pp.33-49
    • /
    • 2009
  • We examine the effectiveness of the conventional (Q, r) model in managing production-inventory systems with finite capacity, stochastic demand, and stochastic order processing times. We show that, for systems with finite production capacity, order replenishment lead times are highly sensitive to loading and order quantity. Consequently, the choice of optimal order quantity and optimal reorder point can vary significantly from those obtained under the usual assumption of a load-independent lead time. More importantly, we show that for a given (Q, r) policy the conventional model can grossly under or over-estimate the actual cost of the policy. In cases where a setup time is associated with placing a production order, we show that the optimal (Q, r) policy derived from the conventional model can, in fact, be infeasible.

수량 할인이 있는 확률적 재고 모형에서의 조달기간의 단축

  • Mun Il Gyeong;Kim Tae Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.378-384
    • /
    • 2002
  • In this paper, we propose a mixed integer optimization approach for solving the inventory problem with variable lead time, reorder point, crashing cost and price -quantity discount. Chang and Chang[15] study a continuous review inventory model in which lead time is a decision variable under price-quantity discount. However, their study cannot find the optimal solution due to the flaws in the modeling and the solution procedure. We present a complete procedure to find the optimal solution for the model. In addition to the above contribution, we also apply the minimax distribution free approach to the model to devise a practical procedure which can be used without specific information on demand distribution.

  • PDF

A Study on the Backorder Policies for Two-Echelon Distribution System (2계층 분배체계에서의 부재고 정책에 관한 연구)

  • Sohn, Kwon-lk;Yi, Jung-Min
    • Journal of Industrial Technology
    • /
    • v.21 no.B
    • /
    • pp.37-44
    • /
    • 2001
  • Distribution System is considered as the most important part of SCM when the satisfaction of customer demand is considered. This paper focus on the backorder policies for stockout which is occurred in each regional distribution center of two-echelon distribution system facing stochastic demand process. Four concepts for the efficient system operation are suggested. First, at least 30% reduction of stockout is achieved by introduction of 50/25 allocation policy to distribution system. Second, transportation cost and lead-time of backorder are decreased by allowance of internal supply between regional distribution centers. Third, the frequency of emergency supply is minimized by application of Ship-up-to- expected-demand backorder policies. Finally we suggest several effective rules to select multi-internal suppliers. Simulation tests show the efficiency of our backorder policies and enhancement of customer service level.

  • PDF

A FOQ Model for Spare-Part Inventory Control (예비품(豫備品) 재고관리(在庫管理)를 위한 정량발주모형(定量發注模型))

  • Jeong, Sang-Il;Sin, Ju-Hang;Park, Yeong-Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.9-17
    • /
    • 1990
  • This paper deals with a FOQ( ; fixed-order quantity) model for spare-part inventory control. In a spare-part inventory problem, stock depletion arises not from external market demand but from internal demand resulting from failures of parts in use. The problem differs from the classical inventory problem in that the demand for a failed part never arises more during stockout period, since the unit remains inoperative when stockout occurs until the failed part is replaced by new one. In the problem under consideration, n identical units are operating simultaneously and failed one is replaced immediately by new one if on-hand spares remain. In order to replenish spares, an order with quantity Q is placed whenever the number of on-hand spares falls to levels. The average annual cost of operating the spare-part inventory system is derived under the assumption that both lifetime of a part and replenishment lead-time distributions are exponential.

  • PDF