Analysis of Process and Operating Characteristics for Chung Nam Province Sewage Treatment Plants (충청남도 하수처리시설의 공정 및 운영 특성 분석)

  • Oa, Seong Wook;Lee, Sang Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.553-559
    • /
    • 2009
  • Currently, small scale sewage works are getting increase in Chung Nam Province and it is strongly required for those plants to get the information of optimized procedures and technologies. Most processes for sewage works in Korea were designed for large scale plants, so many difficulties are observed in small scale sewage works. This study was conducted to evaluate the propriety of O&M and construction cost for sewage treatment plants in Chung Nam Province. The treatment results and process stability of 32 public sewage treatment plants were also investigated. It is expected to provide optimum O&M and construction cost for future small scale sewage works and improving projects of existing plants by these results. Pollution problems caused by small scale plants are usually restricted to small areas; however, in view of the high cost per unit population, treatment requirements and alternatives have to be studied carefully. In comparison to larger plants, more pronounced and different boundary conditions such as unstable influent load, per capita costs and a large variety of feasible treatment and disposal systems were considered.

The illegal case and Improvement of Excavation (흙막이 굴착공사의 부실 사례 및 개선방향)

  • Choi, Jung-Bum;Shin, Seung-Mock
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.643-650
    • /
    • 2009
  • The necessary consequence by the rapid economic growth in large-scale urban excavation is increasing. If the site is the congested in downtown, the scale of excavation will get the large-scale and the extreme depth. We have achieved a high level technology internationally by the design and construction of underground excavation since 1980's. But the accidents during excavation are frequently occurring. So, this demage instigates the human life loss as well as economical loss. The recent accident is come about the damage for public facilities such as the railroad, subway and etc. in addition to the loss of life and property. For these reasons, the recent accident is being caused the damage of copious social overhead capital. The reasons of collapse during excavation can be classified roughly into the administrative part(sanction, permission), the investigation and design, the construction and management and etc. In this study the close check for the cases of the recent collapse is performed and the improvement course for the prevention of collapse is found.

  • PDF

CONTAMINANT LEACHABILITY FROM UTILIZED WASTES IN GEOSYSTEMS

  • Inyang Hilary I.
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2005.10a
    • /
    • pp.5-21
    • /
    • 2005
  • Urbanization rates of population range from about 1% in the developed countries to about 4% in developing countries. For a global population that may reach 10 billion within the next 40 years, pressure has arisen for an increase in the large-scale use of wastes and byproducts in construction. Ironically, most of the wastes that need to be recycled are generated in large cities where the need for constructed facilities to serve large population is high. Waste and recycled materials (WRM) that are used in construction are required to satisfy material strength, durability and contaminant teachability requirements. These materials exhibit a wide variety of characteristics owing to the diversity of industrial processes through which they are produced. Several laboratory-based investigations have been conducted to assess the pollution potential and load bearing capacity of materials such as petroleum-contaminated soils, coal combustion ash, flue-gas desulphurization gypsum and foundry sand. For full-scale systems, although environmental pollution potential and structural integrity of constructed facilities that incorporate WRM are interrelated, comprehensive schemes have not been developed for integrated assessment of the relevant field-scale performance factors. In this presentation, a framework for such an assessment is proposed and presented in the form of a flowchart. The proposed scheme enables economic, environmental, worker safety and engineering factors to be addressed in a number of sequential steps. Quantitative methods and test protocols that have been developed can be incorporated into the proposed scheme for assessing the feasibility of using WRM as partial or full substitutes for earthen highway materials in the field.

  • PDF

Construction of Virtual Campus, a Large-scale Virtual World (버츄얼 캠퍼스 : 대규모 가상 세계의 제작)

  • Seo, HyeWon;Chwa, SooJin;Wohn, KwangYun
    • Journal of the Korea Computer Graphics Society
    • /
    • v.3 no.2
    • /
    • pp.15-25
    • /
    • 1997
  • In this paper, we describe the construction process of a large-scale virtual environment and navigation through it. We discuss on the problems found, future directions for improvements, and related research issues. KAIST campus was chosen as a target environment and was constructed as an integrated virtual world by modeling and configurating its terrain, buildings, and other objects. Constructing a large-scale virtual world itself is an important research issue. Moreover, it can be used not only in numerous applications such as campus information system, remote education, digital library, and internet application system but also as a testbed for the realtime computer graphics.

  • PDF

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

A STUDY ON THE DEFORMATION OF REINFORCED EARTH USING LARGE SCALE PULL-OUT TEST (대형 Pull-out Test에 의한 보강토 지반의 변형특성에 관한 연구)

  • 이은수;이승호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.10a
    • /
    • pp.29-32
    • /
    • 1993
  • Presengly reinforced earth is widely utilized for earth structure increasingly not only domestic but also in many foreign countries because of its rapidity of construction and economic merits. The study on the reinforced earth has been actively carried out and enlarged in the theoretical aspect. But it has many problems to the application of the field. In this study large scale Pull-out Test was used to analyze reinforced earthe behavior considering deformation character of reinforced earth under the similar condition to the field.

  • PDF

Behavior Characteristics of Precast Concrete-Panel Retaining Wall Adhered to In-situ Ground through Large Scaled Load Test (대형재하시험을 통한 원지반 부착식 패널옹벽의 거동특성)

  • Shin, Yuncheol;Min, Kyongnam;Kim, Jinhee;Ahn, Taebong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.45-53
    • /
    • 2016
  • A precast panel wall system resists against the horizontal earth pressure by increasing the shear strength of ground by reinforcement connected to the panel. The application of precast panel wall system is growing to lately minimize the earth work and environmental damage caused by large cut slope and to use the limited land effectively. The ground adhered panel wall system is the construction method that has the panel engraved with natural rock shape to improve the landscape. This system is developed to complete Top-Down method, and it is possible to have vertical cut, and to adhere to in-situ ground, improve construction ability by minimizing the ground relaxation and exclusion the trench and backfill process. In this study the field tests were performed to verify the construction ability about the vertical cut and complete Top-Down process and the construction behavior of ground adhered panel wall system was analyzed by large scale loading test and measurement results during loading test.

The Case Study of the Effective Management of the Site Using Measurement Result During the Excavation Construction (굴착공사 중 계측결과 활용을 통한 효과적인 현장관리 사례 분석)

  • NamGung, Han;Jung, Kyoung-Sik;Koh, Hyung-Seon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.428-444
    • /
    • 2010
  • After underground excavation being introduced in dometic, many technologies have been storing up. One of them, measurement, has been recognized as an important item under excavation construction. But, unlike a large-scale construction, it was not been treated importantly at the general small-scale structures with poor ordering and original design was unchanged under construction was normal if the problem didn't occur on monitoring. In this paper, the site which safe and economical management as well as shortening construction period was made effectively using measurement result was introduced. Also, the site which was completed safely with analyzing measurement and reinforcement when unusual symptom happened was introduced. Using measurement result effectively will be able to obtain the safety and prevent unnecessary economical loss.