• Title/Summary/Keyword: large-scale IT project

Search Result 336, Processing Time 0.035 seconds

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

A Study on the Feasibility Analysis of Large Scale Research Project (대규모 연구 프로젝트 타당성 분석에 관한 연구)

  • Lee, Hong-Cheol;Hwang, In-Ju;Kim, Tae-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Nowadays national research and development fund is continuously increased. And the evaluation on the feasibility of R&D budget investment was carried out. Through this study it was possible that a business feasibility evaluation of large scale research project. Also the benefit of research project about large scale plant(A plant) is $2.67{\sim}3.76$ times of research funds, and the R&D fund pay-back period is $6{\sim}8$ years. And also there is employment effect as $1,200{\sim}2,200$ every year, and $22,000{\sim}35,000$ within 20 years after research project.

  • PDF

EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

Conceptual WBS Model for a Large-Scale Information System Acquisition Project (대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구)

  • Nam Yong Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

Developing Strategies of the Large-scale Districts for a Sustainable Environment-friendly Agriculture (지속가능한 친환경농업을 위한 광역친환경농업단지의 발전방향)

  • Kim, Ho;Yang, Sung-Bum
    • Korean Journal of Organic Agriculture
    • /
    • v.23 no.2
    • /
    • pp.233-245
    • /
    • 2015
  • The objective of this study is to analyze the properness, effectiveness and sustainability on the large-scale environment-friendly agricultural districts (LEAD). For this, we survey 11 public officers who manage the LEAD. Most of them aware necessities of LEAD project. They have a higher satisfaction and think that the project affect ripple effect and contribution on environment-friendly agriculture. Main performance expected of the LEAD project is a spread of natural circulation agriculture in connection with cultivation and stockbreeding. For continuance of environment-friendly agriculture after the project, it is necessary to find markets of products. Also policy making related with environment-friendly agricultural technique is required. The results of this study show that the LEAD project need a modification based on field and change of agricultural issues.

A Development Methodology for Quality Assurance System in Large-Scale Software Development Project (대규모 소프트웨어 개발 사업에서의 품질 보증을 위한 개발방법론)

  • 윤석환;박지은;신용백
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.1
    • /
    • pp.142-155
    • /
    • 1997
  • To successfully carry out large scale research projects while su, pp.rting quality assurance of research output, effective and systematic management through utilization of resources such as manpower, time and cost as well as engineering techniques such as component technology and design methodology is required. It is necessary to establish development methodology to su, pp.rt quality assurance. The development methodology covers the contents and procedures of the project, such as division of the project into independently executable units, allocation of resources including researchers, component technology, related know-how and equipment, deployment of research units and integration of the project at the end. In this paper we present systematic development methodology for quality assurance in large scale software development projects by analyzing the contents of the methodology a, pp.ied to the Gigabit Information-processing And Networking Technology development project(GIALT).

  • PDF

A Study on the System Improvement Plan for an Efficient Market Maintenance Project (시장정비사업의 효율적 실시를 위한 제도개선방안 연구)

  • Kim, Seung-Hee;Kim, Young-Ki
    • Journal of Distribution Science
    • /
    • v.11 no.4
    • /
    • pp.23-35
    • /
    • 2013
  • Purpose - This paper attempts to identify the problems and limitations of a market maintenance project conducted according to the 「Special Act for the Development of Traditional Markets and Shopping Street」 and to present a revised direction for the special law and lay the groundwork for market maintenance projects to be promoted smoothly. Research design, data, and methodology - The revised direction for the legislation and the proposal were written based on an investigation of the problems and the legal system, and proposed measures for market maintenance operation and system improvements to derive the improvements needed for market maintenance projects. Results - A market maintenance project has been conducted as a means to reinvigorate traditional markets that are economically depressed, and to revive the local economy. It was largely conducted in the form of reconstruction and redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to contribute to the gradual disappearance of traditional markets. First, as part of a market maintenance project, many companies are building multipurpose buildings or high-rise residential buildings to increase profits. In these high-rise buildings, they can raise rents, which may not be affordable for some existing small businesses. To solve such problems, the large-scale store registration requirement needs to be relaxed or abolished once the market maintenance project is completed. If the large-scale store registration requirement is to be abolished, the term 'large retail store' should be changed in the 「Special Act for the Development of Traditional Markets and Shopping Street」. After registration, the Small and Medium Business Administration should train merchants, offer consultations, and support events, to the extent that the existing traditional market management modernization project permits, and further continue to manage and support its ongoing activities. However, unless large-scale store registration is abolished, adding an exception clause in the special law to relax large-scale store registration criteria, and permitting changes to building use is another option. At the end of a market maintenance project, empty stores should be purchased by the Small and Medium Business Administration, and local government, etc., at the actual construction cost, to utilize them as public rental shopping areas, which in turn may be re-utilized as a temporary market for another market maintenance project. The second problem in market maintenance projects is merchant-protection. Currently, the special law prescribes that a temporary market be created for merchants to conduct business during the rental period of a market maintenance project. Conclusions - In reality, a market maintenance project is conducted usually in big metropolitan cities with 500,000 residents or more. The main building type created under these projects is a multipurpose building. For this reason, it is very difficult to secure a location for a temporary market in the surrounding area of such a project. To solve this problem, this study suggests 'public rental shopping areas' as mentioned above.

  • PDF

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects (공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안)

  • Hong, Sung Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.293-303
    • /
    • 2014
  • Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.