• Title/Summary/Keyword: item parceling

Search Result 2, Processing Time 0.014 seconds

The Effects of Item Parceling on Causal Parameter Testing and Goodness-of-Fit Indices in Structural Equation Modeling (구조방정식 모델에서 항목묶음이 인과 모수의 검정과 적합도 평가에 미치는 영향)

  • Cho, Hyun-Chul;Kang, Suk-Hou
    • Journal of Global Scholars of Marketing Science
    • /
    • v.17 no.3
    • /
    • pp.133-151
    • /
    • 2007
  • The purpose of this article is to examine the effects of item parceling on the consistency of significance testing of the causal parameters with regard to the relationship between the relevant constructs, as well as the effects of the item parceling on the goodness-of-fit indices of LISREL's general models. Most of the researchers' major purpose of using structural equation modeling (SEM) is to test their research hypotheses associated with the causal parameters. Therefore, we investigated three general models of LISREL, rather than the frequently used confirmatory factor analytic (CFA) models by many other researchers. The results of the study showed that there was a high level of consistency in the calculated test statics of causal parameters between the item-parceled solutions and the item-level solutions, and that the item-parceled solutions had better goodness-of-fit indices, such as GFI, AGFI, CFI, and NFI, than the solutions at the item level. However, in terms of RMSEA, there was no such tendency.

  • PDF

An Application Plan of Cost Information through Actual Date Information DB Construction (공사실적정보 DB구축을 통한 원가정보 활용방안)

  • Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.495-498
    • /
    • 2007
  • The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.

  • PDF