• 제목/요약/키워드: invert lining

검색결과 9건 처리시간 0.048초

석회암공동 분포지역에서의 터널 시공사례 (A Case Study on Construction of Tunnel at Limestone Cavity Site)

  • 김시격;강인섭;김용하;윤일병;문훈기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.66-75
    • /
    • 2006
  • As construction for road tunnel is increasing, various geotechnical conditions can be faced during the construction stage. Especially, if the tunnel is located in limestone area, many kinds of site investigations such as in-situ boring, electrical resistance survey, TSP(Tunnel Seismic Prediction) and etc., are conducted before and during the construction. By conducting these preliminary tests, location, size, and filling materials in limestone cavities can be approximately estimated. Once some cavities which can be harmful for tunnel safety are predicted, methods for ground reinforcement and tunnel excavation, corresponding those ground conditions, have to be established and verified by measurement data and numerical analysis. If necessary, invert lining should be also considered. In this paper, by studying some cases of tunnels constructed in limestone area, predicted problems during construction and rational countermeasures for those are presented.

  • PDF

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

사질토지반에서 2 Arch 터널의 거동 (Behavior of 2 Arch Tunnel in Sand)

  • 이상덕;전은숙
    • 한국터널지하공간학회 논문집
    • /
    • 제6권2호
    • /
    • pp.171-182
    • /
    • 2004
  • 사질토지반에서 2 Arch 터널을 굴착할 때에 중앙터널의 굴착규모와 인버트 폐합에 따른 중앙필러 및 터널 주변지반의 거동특성을 규명하기 위하여 모형실험을 수행하였다. 3개로 분리되어 수직이동이 가능한 가동판 위에 중앙필러와 모형라이닝을 설치하고 모형지반 조성 후에 가동판을 강하시켜서 중앙터널굴착을 표현하였고, 중앙터널굴착 후에 좌 우측 터널을 굴착하였으며 굴착이 완료된 2 Arch 터널 전체에 대한 가동판을 움직여서 2 Arch 터널굴착에 따른 하중전이 및 지반이완 형태는 물론 중앙필러에 작용하는 하중의 변화를 관찰하였다. 실험중에 가동판, 중앙필러 및 바닥판에 작용하는 이완하중 및 전이하중을 측정하였고, 모형터널의 내부와 지중 및 지표에 변위계를 설치하여 모형터널의 내공변위 및 지반의 변위를 측정하였다. 본 연구결과 시공순서와 라이닝의 기초부 구속조건에 따라 중앙필러가 부담하게 되는 하중의 변화를 확인하였고 2 Arch 터널굴착에 따른 하중전이 및 지반이완형태를 확인하였다.

  • PDF

지하수 과다유입 조건하에서의 터널굴착 (Tunneling in Severe Groundwater Inflow Condition)

  • 이용남;김대영
    • 한국지반환경공학회 논문집
    • /
    • 제7권2호
    • /
    • pp.67-76
    • /
    • 2006
  • 본 논문은 수직 절리가 잘 발달된 지하수위가 높은 화산암질 지반에서 직경 3.3m의 도수터널 굴착을 하는 수력발전소 건설공사 내용이다. 취수시설은 발전소로부터 20.3km 상류에 위치하고 있으며, 20km의 도수터널과 연결되어 있고 440m의 낙차고를 갖는 펜스탁이 발전소와 연결되어 있다. 현장의 지질 조건은 전형적인 칼데라 호수인 토바호에 의해 지반 침식과 수직방향의 인장균열이 발달하였으며 이로 인해 지반의 초기응력이 이완되었다. 높은 지하수위(최대 수두 200m)를 가진 잘 발달된 수직 절리를 터널이 관통하면서 막대한 양의 지하수가 터널내로 유입되었다. 터널 굴착은 개방형 쉴드 TBM과 버럭반출에는 철로와 기관차를 사용하였다. 터널 내로의 유입수가 터널 바닥면에서 70cm 높이에 다다르고 이는 터널 직경(3.9m)의 17%에 해당하였다. 생산성을 향상하기 위해서 TBM과 버럭반출 차량과 같은 몇 가지의 개선과 수중펌프를 증설하는 방안을 사용하였다. 굴착 중에 만난 지반 조건이 설계보다 상당히 불량하여 RC라이닝에서 지하수 유입, 암반조건, 수압 등에 따라 PC 세그먼트 라이닝 또는 PC 세그먼트 라이닝과 현장타설 RC 라이닝, RC 라이닝, 그리고 강재 라이닝이 적용되었다. 이 PC 세그먼트 라이닝의 도입과 TBM과 다른 장비의 개조 및 개선을 통해서 심각한 지하수 조건 하에서 터널 굴착 공사를 성공적으로 완료하였다.

  • PDF

터널시공 중 붕락발생 원인과 최신 보강기술 (Major causes of failure and recent measurements of tunnel construction)

  • 박봉기;황제돈;박치면;김상수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.140-153
    • /
    • 2005
  • During the tunnel construction the major failure mode can be categorized as: tunnel failure just after the tunnel excavation without support, failure after application of shotcrete and finally failure after setting the concrete lining. The failure mode just after the tunnel excavation without support, can be further classified as : bench failure, crown failure, face failure, full face failure, failure due to weak strata and failure due to overburden. Moreover the failure after application of shotcrete is classified as heading face failure, settlement of shotcrete support, local failure of shotcrete lining and invert shotcrete. To find out the major causes of tunnel collapse, the investigation was done in case of the second phase of Seoul subway construction. The investigation results depicted that the major causes of tunnel collapse were due to the weak layer of rock/fault and sudden influx of ground water from the tunnel crown. While the investigation results of the mountain road tunnels construction have shown that the major causes of tunnel failure were inadequate analysis of tunnel face mapping results, intersection of faults and limestone cavities. In this paper some recent measurement in order to mitigate such tunnel collapse are presented

  • PDF

운영중인 도로터널의 측벽하부 숏크리트 보강에 의한 단면확대 (Section enlargement by reinforcement of shotcrete lining on the side wall of operating road tunnel)

  • 김동규;신영완;신용석
    • 한국터널지하공간학회 논문집
    • /
    • 제14권6호
    • /
    • pp.637-652
    • /
    • 2012
  • 도심지내 기존터널을 단면확대 시공하는 경우, 터널내 교통흐름을 유지하기 위하여 '${\sqcap}$'형태의 프로텍터를 설치한다. 터널내 프로텍터를 설치하면 터널 측벽하부에서 작업공간이 협소하여 록볼트 시공이 불가능해 질 수가 있다. 본 연구는 터널의 측벽하부에서 록볼트를 시공하지 않고 숏크리트만으로 보강하여 터널단면을 확대된 할 경우, 터널구조물의 안정성과 보강되는 최적의 숏크리트 두께를 제시하는데 목적이 있다. 본 연구를 위하여 3차선 NATM 도로터널을 4차선 NATM 도로터널로 확대 시공하는 경우에 대하여 수치해석을 수행하였다. 수치해석결과, 4차선 NATM 도로터널의 측벽하부에서 록볼트를 시공하지 않은 경우의 천단변위와 상반 내공변위는 록볼트를 시공한 경우와 거의 유사하였다. 다만, 하반 내공변위 및 숏크리트 응력은 록볼트를 시공하지 않은 경우가 록볼트를 시공한 경우보다 최대 0.57 mm 및 최대 1,300 kN/$m^2$ 크게 나타났다. 터널 측벽하부에서 록볼트를 시공하지 않아 추가 발생한 하반 내공변위와 숏트리트 응력은 25 cm인 기본 숏크리트 두께의 20%(25 cm${\rightarrow}$30 cm)만 증가시켜도 저감시킬 수 있다.

운영중 다목적 복층터널의 부력영향 검토 (Review on the buoyancy effect of the multi purpose double-deck tunnels during operation)

  • 김호종;김현아;주은정;신종호
    • 한국터널지하공간학회 논문집
    • /
    • 제17권6호
    • /
    • pp.623-635
    • /
    • 2015
  • 지하수위 아래에 건설되는 복층터널은 비교적 대단면이며 비배수 터널로 건설되는 특징을 가지고 있다. 지하수위 하부에 위치하는 터널은 지하수로 인해 발생하는 부력으로부터 터널의 안정성 확보방안이 필요하다. 일반적으로 터널 라이닝과 지반사이의 경계면에서의 결합력은 부력에 대해 충분한 안정성을 발휘한다. 그러나 장기적인 시간이 경과하면 구조물의 열화로 인하여 결합력이 감소할 수 있다. 본 연구에서는 장기적인 관점에서 부력으로 인한 복층터널의 영향을 조사하였다. 그 결과 부력으로 인해 터널 하단부분에서 변형과 라이닝에 작용하는 응력이 증가하였다. 본 연구로부터 운영중 터널의 라이닝과 지반사이의 결합력을 유지시킬 수 있는 방안이 필요함을 알 수 있다.

도심지 지하철 터널의 지반보강공법 시공사례 연구 (A Case Study on the Reinforcement Method of Subway Tunnel)

  • 천병식;여유현;최현석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.201-208
    • /
    • 1999
  • The NATM(New Austrian Tunnelling Method) has been used for tunnelling since 1980's. But Collapses of tunnel under construction take place frequently, especially at urban areas because of adjacent buildings, underground conduits and traffic loads. This paper is a case study on the reinforcement method of subway tunnel at urban areas. In this study, ground inspection, geological investigation, laboratory test and numerical analysis by means of FDM program were carried out. The tunnel excavation was stopped because of over excessive brake of tunnel crown and shotcrete was installed to prevent deformation of adjacent ground as the temporary method. From the result of field survey and geological investigation, it is found that the soft weathered soil was distributed to the ground of tunnel invert unlike original investigation. The results of the analysis and the study show that the SGR(Space Grouting Rocket) method and Umbrella method can be applied for the stability of tunnel excavation and in addition the reinforcement of concrete lining is required for long-term stability of tunnel.

  • PDF

파쇄대의 공간적 분포가 터널 거동에 미치는 영향 - 수치해석 연구 (Effect of orientation of fracture zone on tunnel behavior - Numerical Investigation)

  • 유충식;조윤규;박정규
    • 한국터널지하공간학회 논문집
    • /
    • 제15권3호
    • /
    • pp.253-270
    • /
    • 2013
  • 본 연구에서는 파쇄대의 공간적 분포 특성이 터널의 거동에 미치는 영향에 대한 내용을 다루었다. 이를 위해 발파굴착 공법이 적용되는 터널을 대상으로 다양한 파쇄대 조건을 도출하고 이에 대한 2차원 및 3차원 해석을 수행하여 파쇄대의 주향 및 경사, 터널과의 이격거리, 토피고, 측압계수 등에 대한 매개변수 연구를 실시하였다. 해석결과를 토대로 매개변수 조건에 대한 터널 변위 및 지보재 부재력의 변화경향을 고찰하였으며 그 결과 파쇄대의 경사각 및 주향에 따라 터널의 변위 및 지보재 부재력에서 큰 차이를 보였으며 전반적으로 터널의 심도가 깊어질수록 그리고 초기측압계수가 클수록 파쇄대의 공간적 분포 특성에 따른 터널 거동의 차이가 더 심화되는 것으로 나타나 대심도 터널의 경우가 저심도 터널에 비해 파쇄대의 영향이 가중될 수 있는 것으로 검토되었다.