Journal of the Korean Society for Precision Engineering
/
v.17
no.3
/
pp.15-21
/
2000
The Intelligent Manufacturing Systems (IMS) Rapid Product Development (RPD) Project is an international partnership formed to build a pre-competitive research and development program that will address the integration of new technologies in manufacturing and provide an infrastructure for industry to cooperate much more closely in the product development cycle. In this explanatory paper, a research trend of the RPD project is briefly presented, together with its background and state-of-the-art, focusing on objectives and target results of its sub-projects which include rapid development of functional parts and tools, validation and reverse engineering, and information logistic system.
International conference on construction engineering and project management
/
2015.10a
/
pp.614-615
/
2015
In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.
International Journal of Computer Science & Network Security
/
v.24
no.6
/
pp.17-22
/
2024
Software cost and schedule estimation is usually based on the estimated size of the software. Advanced estimation techniques also make use of the diverse factors viz, nature of the project, staff skills available, time constraints, performance constraints, technology required and so on. Usually, estimation is based on an estimation model prepared with the help of experienced project managers. Estimation of software cost is predominantly a crucial activity as it incurs huge economic and strategic investment. However accurate estimation still remains a challenge as the algorithmic models used for Software Project planning and Estimation doesn't address the true dynamic nature of Software Development. This paper presents an efficient approach using the contemporary Constructive Cost Model (COCOMO) augmented with the desirable feature of fuzzy logic to address the uncertainty and flexibility associated with the cost drivers (Effort Multiplier Factor). The approach has been validated and interpreted by project experts and shows convincing results as compared to simple algorithmic models.
The Yongsan International Business District development work is a 20 billion$ project to raise facilities for national business, trade, residence, and culture. The project site is $566,800m^2$ and it covers the railroad maintenance center and Dongbuichon-dong. Developing railroad station region used to be done by private investment. However, problems existed; simple function as a massive selling market, traffic jam caused by massive market users, inadequacy to transfer to other transportations, interruption of the pedestrian way and separation of zone of life by the station. To solve this problem it is important to consider developing cases of other countries and devise a plan that is applicable to our circumstances. In the study, we compared our station development case with foreign station development cases and analyze the element for the plan what we should consider in our station development. In addition, The results of the study can be used as a preliminary data in the future planning the Yongsan International Business District development.
Since the Republic of Korea had been registered as the 24th member of OECD DAC in 2009, recent trend of Korea's ODA has showed drastic increase including agriculture and rural development sector. Particularly, various rural development projects have been implemented adopting development experience and methodology of Saemaul Undong (SMU, New Village Movement). This study implemented statistical analysis between villagers' participation and achievement of rural community development project, based on practical data out of 'Saemaul Undong Project in Myanmar', to suggest meaningful implication in terms of participatory rural development. It emphasized the importance and necessity of villagers' participation in rural development through regression analysis that proved positive correlation between villagers' participation and rural development project. It proves that income-generation part has significantly greater influence than capacity-building and living environment part in terms of rural community development project: Based on the analysis, comparing impact of each independent variable, income generation has 1.88 and 1.68 times greater impact than capacity-building and living environment respectively. The result, on the other side, rather raise the importance of careful consideration for project design and implementation to harmonize those three parts altogether especially rural development for developing countries: capacity-building and living environment parts suggests essential foundation to make income generation successful that enables to secure project achievement and sustainability.
Journal of the Korean Society of Systems Engineering
/
v.8
no.2
/
pp.27-36
/
2012
In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.
International conference on construction engineering and project management
/
2005.10a
/
pp.748-753
/
2005
In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.
International Journal of Advanced Culture Technology
/
v.9
no.3
/
pp.68-73
/
2021
The 'Good School Uniform' development project was conducted in consultation with Gyeonggi-do and the Gyeonggi Provincial Office of Education. The aim is to find various ways to supply school uniforms reflecting the latest trends at low prices using high-quality textile materials produced in Gyeonggi-do. From 2015, when the 'Good School Uniform' development project started, to the present, various events and fairs are making great progress. However, there are several problems in actually wearing each middle and high school student. In order to satisfy the characteristics of each school and the satisfaction of parents and students together, it is necessary to not only conduct practical research such as closer customer satisfaction surveys, industry-academia-research networks, expert interviews, and surveys, but also several supplements such as consultations between practitioners. There are many domestic studies on the development of school uniform design, but the research on the revitalization plan according to the free school uniform support is very insufficient. Moreover, it is not easy to find recent studies on the development of 'Good School Uniforms'. This study intends to study how to build a system so that the Gyeonggi-do 'Good School Uniform' development project can be used as a role model. In addition, it is expected that this study will be used as basic data for building a nationwide system such as public brand development and collaboration with small domestic companies.
Journal of Korean Society of Industrial and Systems Engineering
/
v.22
no.50
/
pp.243-255
/
1999
A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.
International conference on construction engineering and project management
/
2007.03a
/
pp.480-489
/
2007
Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.