From the viewpoint of color perspective, black has more obvious effects to impart images than dress itself This study aims to examine black dress through the fashion history to highlight the aesthetic value of black and to make better use of black in designing. Black in fashion, particularly in the guise of the little black dress, became an indispensable feature of cosmpolitan style after World War I. Designers harnessed the power of black, drawn irresistibly to its innate qualities of drama and strength of line. For the past five hundred years, aside from the use of black for mourning as well as for religious, academic, legal and ceremonial dress, black with a greater or lesser dominance has been a fashion constant. Since then black has been an important color in fashion. How to use black in formative designs should be studied continuously.
International Journal of Precision Engineering and Manufacturing
/
제1권2호
/
pp.124-131
/
2000
A shop floor can be considered as and importand level to develop a Computer Integrated Manufacturing system (CIMs). The shop foor is a dynamic environment where unexpected events contrinuously occur, and impose changes to planned activities. The shop floor should adopt an appropriate control system that is responsible for scheduling coordination and moving the manufacturing material and information flow. In this paper, the architecture of the hybrid control model identifies three levels; i.e., the shop floor controller (SFC), the cell controller(CC) and the equipment controller (EC). The methodology for developing these controller is employ an object-oriented approach for static models and IDEF0 for function models for dispatching a job. SFC and CC are coordinated by employing a multi-factors bidding and an adapted Analytic Hierarchy Process(AHP) prove applicability of the suggested method. Test experiment has been conducted by with the shopfloor, consisting of six manufacturing cells.
International Journal of Fuzzy Logic and Intelligent Systems
/
제3권2호
/
pp.251-257
/
2003
In this paper, we wish to construct a optimal traffic cycle using wire remote control. if police vehicle or ambulance suddenly enter the traffic Intersection, it will increase the traffic accident. In this paper, wireless traffic light use the radio traffic control signal and research about the hardware manufacture to check special detectors on urgency vehicles may safety and rapidly enter traffic intersection. Also, this paper present a traffic signal control conditions that analyzes different traffic intersection flows in cases of saturated flows, where the real traffic volume demand is large and the capacity constraints of bottlenecks have significant effects on the flow patterns. Through computer simulation this wireless traffic light has been proven to be much more safety and efficient than fixed traffic signal light which does not consider emergency vehicles for safety escort.
KIEE International Transactions on Power Engineering
/
제2A권4호
/
pp.166-173
/
2002
Dispersed Generation (DG) units significantly effect the existing distribution protection practices. Therefore, new protection practices of the distribution system interconnected with DG units should be reevaluated and developed. In this paper, a new inter-tie protection scheme of DG units for distribution automatic reclosing is proposed. The impact of DG units on existing radial-sectionaliser coordination is analyzed. And the effects of the distribution reclosing type (radial and passive reclosing) on DG dynamics are analyzed and classified. From the results of the DG dynamic responses by the reclosing type, i.e. radial and passive reclosing, the inter-tie protection schemes of DG are introduced to improve the reliability and availability of utility interactive DG. The proposed schemes are proved and evaluated by a case study using PSCAD/EMTDC simulation.
E-business including e-commerce boosts the competitiveness of corporations remarkably through the creation of new value added, positioning itself as the key to national competitive edge. Thus, advanced nations and international organizations such as WTO and OECD are structuring a positive support system for e-transformation. Korea also has been pushing for activating e-business at the government level since 2000. ECRC(Electronic Commerce Resource Centers) project is an efficient government initiative and inter-agency coordination in implementing e-Business policy for industry. This project has been sponsored by the MOCIE and operated through prime contracts with KIEC. ECRCs provide such services as educational training, technology transfer, consulting and information service related to e-Business for industry. They had given the digital opportunity demanded by industry from 1997 but in these days there are many other new e-business activating projects in Korea. This paper sought to study a strategic reform plan of ECRC.
Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
국제초고층학회논문집
/
제3권4호
/
pp.311-323
/
2014
This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.
Critics of height argue that it de-humanizes our cities. Yet a critical mass is a necessity for vibrant city life, and height is a key contributor. If we can overcome the environmental impacts and technicalities of building tall and dense, our cities' streets can thrive and prosper. To make this happen, we must move towards working together to share resources, so we can ensure the continuity of the public realm. We already have the tools to do this; the challenge lies in the coordination of the public and private institutions that govern urban space. District heating and cooling systems; shared logistics spaces; care, responsibility and ownership of the public realm between buildings; seamless connectivity between modes of transport; creative combinations of shelter and seating, and the placement of buildings so that they are not overbearing to the streets around them - these attributes can be found in many places, though rarely all at once. This paper looks at the development of the city and offers Barangaroo South, Sydney, which addresses all these aspects, as a potential template for future city planning.
International journal of advanced smart convergence
/
제4권2호
/
pp.6-13
/
2015
With the spread of various kinds of cameras such as digital cameras and DSLR and a growing interest in high-definition and high-resolution images, a method that synthesizes multiple images is being studied among various methods. High Dynamic Range (HDR) images store light exposure with even wider range of number than normal digital images. Therefore, it can store the intensity of light inherent in specific scenes expressed by light sources in real life quite accurately. This study suggests feature points synthesis algorithm to improve the performance of HDR panorama recognition method (algorithm) at recognition and coordination level through classifying the feature points for image recognition using more than one multi frames.
Kwang-pyo Lee;Hyunsoo Lee;Moonseo Park ;Hyunsoo Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.890-896
/
2009
In past projects, the main goal has been to enhance efficiency by reducing cost and time. However, considering the current condition of safety management in many construction companies, it can be confirmed that safety management has not been a top priority for a long time. Current safety management, which is based on safety standards and rules, is very ineffective and only emphasizes management after an incident. As well, although fewer accidents occur compared to the past, because construction projects are increasingly large in scale and complex, these accidents tend to be more serious and involve greater monetary loss. Furthermore, as the severity of these accidents increases, so does the possibility of fatalities. Therefore, improving safety management is essential. This study proposes an effective program for safety management, focusing on the processes to connect studies and systems, and the basic techniques required for program development. To realize this program, technical tools are suggested, including systems such as BIM (Building Information Modeling); additionally, the coordination of other systems such as an RTLS, a server, and an alarm system is proposed.
D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.366-370
/
2005
The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.