• Title/Summary/Keyword: integration of construction

Search Result 879, Processing Time 0.034 seconds

Development of data analysis tool for combat system integration

  • Shin, Seung-Chun;Shin, Jong-Gye;Oh, Dae-Kyun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.1
    • /
    • pp.147-160
    • /
    • 2013
  • System integration is an important element for the construction of naval combat ships. In particular, because impeccable combat system integration together with the sensors and weapons can ensure the combat capability and survivability of the ship, the integrated performance of the combat system should be verified and validated whether or not it fulfills the requirements of the end user. In order to conduct systematic verification and validation, a data analysis tool is requisite. This paper suggests the Data Extraction, Recording and Analysis Tool (DERAT) for the data analysis of the integrated performance of the combat system, including the functional definition, architecture and effectiveness of the DERAT by presenting the test results.

A study on the development direction for vendor management in plant construction (플랜트 건설공사의 벤더관리 발전방향 기초연구)

  • Park, Hwan-Pyo;Han, Jae-Goo;Chin, Kyung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.189-190
    • /
    • 2011
  • The purpose of this study is to suggest the development direction for vendor management in plant construction. Therefore this research has proposed the integration management of vendor and information standardization. This research has proposed that plant industry association manage the basic information of vendor. And each company manage the performance evaluation of vendor's firm. Expecially, vendor management system should be developed by ISO information system.

  • PDF

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

4S-Van Design for Application Environment

  • Lee, Seung-Yong;Kim, Seong-Baek;Lee, Jong-Hun
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.106-110
    • /
    • 2002
  • 4S-Van is being developed in order to provide the spatial data rapidly and accurately. 4S-Van technique is a system for spatial data construction that is heart of 4S technique. Architecture of 4S-Van system consists of hardware integration part and post-processing part. Hardware part has GPS, INS, color CCD, camera, B/W CCD camera, infrared rays camera, and laser. Software part has GPS/INS integration algorithm, coordinate conversion, lens correction, camera orientation correction, and three dimension position production. In this paper, we suggest that adequate 4S-Van design is needed according to application environment from various test results.

  • PDF

A Database Schema Integration Method Using XML Schema (XML Schema를 이용한 이질의 데이터베이스 스키마 통합)

  • 박우창
    • Journal of Internet Computing and Services
    • /
    • v.3 no.2
    • /
    • pp.39-56
    • /
    • 2002
  • In distributed computing environments, there are many database applications that should share data each other such as data warehousing and data mining with autonomy on local databases. The first step to such applications is the integration of heterogeneous database schema, but there is no accepted common data model for the integration and also are difficulties on the construction of integration program. In this paper, we use the XML Schema for the representation of common data model and exploit XSLT for reducing the programming difficulties. We define the schema integration operations and develop a methodology for the semi-automatic schema integration according to schema conflicts types. Our integration method has benefits on standardization, extendibility on schema integration process comparing to existing methodologies.

  • PDF

Integrating Design, Construction and Logistics in Japan and Overseas CLT Building Projects

  • Ayako OMURA
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1320-1320
    • /
    • 2024
  • this paper describes optimization efforts throughout the process from design, delivery and construction to operations in two CLT (Cross Laminated Timber) building projects. CLT gives us an opportunity to change our mindset and examine issues concurrently instead of working separately by phase or by profession. The author, as project manager, led the interdisciplinary discussions.

A Reconfigurable Integration Test and Simulation Bed for Engagement Control Using Virtualization (가상화 기반의 재구성 용이한 교전통제 통합시험시뮬레이션 베드)

  • Kilseok Cho;Ohkyun Jeong;Moonhyung Yoon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.26 no.1
    • /
    • pp.91-101
    • /
    • 2023
  • Modeling and Simulation(M&S) technology has been widely used to solve constraints such as time, space, safety, and cost when we implement the same development and test environments as real warfare environments to develop, test, and evaluate weapon systems for the last several decades. The integration and test environments employed for development and test & evaluation are required to provide Live Virtual Construction(LVC) simulation environments for carrying out requirement analysis, design, integration, test and verification. Additionally, they are needed to provide computing environments which are possible to reconfigure computing resources and software components easily according to test configuration changes, and to run legacy software components independently on specific hardware and software environments. In this paper, an Integration Test and Simulation for Engagement Control(ITSEC) bed using a bare-metal virtualization mechanism is proposed to meet the above test and simulation requirements, and it is applied and implemented for an air missile defense system. The engagement simulation experiment results conducted on air and missile defense environments demonstrate that the proposed bed is a sufficiently cost-effective and feasible solution to reconfigure and expand application software and computing resources in accordance with various integration and test environments.

Evaluation of Environmental Stress for Highway Construction Project by Life Cycle Assessment Method (전과정평가기법에 의한 도로건설공사 환경부하량 평가 연구)

  • Moon, Jinseok;Ju, Kibeom;Seo, MyoungBae;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.83-91
    • /
    • 2014
  • The global community demands the reduction of environmental pollution such as greenhouse gas and carbon dioxide emissions. According to these requirements, the road construction project in the highest energy consuming industry is required the efficient way of reducing environmental pollution emissions. In this study, during the whole life cycle process, an environment impact assessment was performed for the several road construction projects in order to evaluate environmental stress through the road construction process. This study provides a proper process of environment impact assessment for life cycle assessment (LCA) analysis of road construction project, and figures the environmental stress regarding to the major construction materials for the case projects. In addition, this study conducted a sensitivity analysis for the key materials of environmental stress through the quantity analysis of major materials for the 1km section of a road construction. By this sensitivity analysis of total environmental stress change from the different volumes of constructing materials, it would be useful information for the environment impact assessment for the future road construction project.

A Study on Test Environment and Process for Interface Verification of Unmanned Aerial Systems (무인항공기 체계 연동검증을 위한 시험환경 및 검증절차에 관한 연구)

  • Cho, Sunme
    • Journal of Aerospace System Engineering
    • /
    • v.13 no.3
    • /
    • pp.40-47
    • /
    • 2019
  • This paper proposes the environment construction and test method of system integration laboratory (SIL) and system integration test (SIT) for verification of interface between onboard equipment and ground control equipment of unmanned aerial systems (UAS). This research also describes the interface environment between subsystems built in SIL and verification methods for the systems' operation logic through simulated flights. Similarly, the paper handles the ground integration test process of UAS in the real testing environments.