• Title/Summary/Keyword: integrated scheduling

Search Result 217, Processing Time 0.135 seconds

A Dynamic Dispatching Algorithm for Operation of Automated Guided Vehicles and Machines in CIM Systems (CIM 시스템에서 기계가공과 AGV 의 운영을 위한 동적 작업배정 알고리듬)

  • Kim, Jung-Wook;Rhee, Jong-Tae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.1
    • /
    • pp.85-101
    • /
    • 1995
  • Automated Guided Vehicles(AGVs) are widely used in computer integrated manufacturing(CIM) systems for material handling purposes. Although automated guided vehicles provide higher levels of flexibility and computer integrability, the installations are limited in number and one of the critical reasons lies in the complexity involved in the operation. The main objective of this research is to alleviate this problem by proposing efficient integrated operational control methods for AGV-based CIM systems. Particularly, this research is concerned with the mixed problem of dispatching automated guided vehicles and scheduling machines operation. The proposed dynamic heuristic algorithm uses various priority schemes and relevant information concerning the load of the system, the status of queues, and the position of AGVs in the scheduling process. The scheduling decision process is hierarchical in the sense that different decision criteria are applied sequentially to identify the most appropriate part to be served. This algorithm consists of two sections, the section of part selection by AGVs for the next service whenever an AGV completes the current assignment, and the section of part selection by machines for next service whenever a machine completes the current operation. The proposed algorithm has been compared with other scheduling schemes using the performance measure of mean flow-time and mean tardiness. Simulation results indicate that the proposed algorithm can reduce the mean flow-time and mean tardiness significantly.

  • PDF

Design of a Coordinating Mechanism for Multi-Level Scheduling Systems in Supply Chain

  • Lee, Jung-Seung;Kim, Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.1
    • /
    • pp.37-46
    • /
    • 2012
  • The scheduling problem of large products like ships, airplanes, space shuttles, assembled constructions, and automobiles is very complex in nature. To reduce inherent computational complexity, we often design scheduling systems that the original problem is decomposed into small sub-problems, which are scheduled independently and integrated into the original one. Moreover, the steep growth of communication technology and logistics makes it possible to produce a lot of multi-nation corporation by which products are produced across more than one plant. Therefore vertical and lateral coordination among decomposed scheduling systems is necessary. In this research, we suggest an agent-based coordinating mechanism for multi-level scheduling systems in supply chain. For design of a general coordination mechanism, at first, we propose a grammar to define individual scheduling agents which are responsible to their own plants, and a meta-level coordination agent which is engaged to supervise individual scheduling agents. Second, we suggest scheduling agent communication protocols for each scheduling agent topology which is classified according to the system architecture, existence of coordinator, and direction of coordination. We also suggest a scheduling agent communication language which consists of three layers : Agent Communication Layer, Scheduling Coordination Layer, Industry-specific Layer. Finally, in order to improve the efficiency of communication among scheduling agents we suggest a rough capacity coordination model which supports to monitor participating agents and analyze the status of them. With this coordination mechanism, we can easily model coordination processes of multiple scheduling systems. In the future, we will apply this mechanism to shipbuilding domain and develop a prototype system which consists of a dock-scheduling agent, four assembly-plant-scheduling agents, and a meta-level coordination agent. A series of experiment using the real-world data will be performed to examine this mechanism.

Multiobjective Hybrid GA for Constraints-based FMS Scheduling in make-to-order Manufacturing

  • Kim, Kwan-Woo;Mitsuo Gen;Hwang, Rea-Kook;Genji Yamazaki
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.187-190
    • /
    • 2003
  • Many manufacturing companies consider the integrated and concurrent scheduling because they need the global optimization technology that could manufacture various products more responsive to customer needs. In this paper, we propose an advanced scheduling model to generate the schedules considering resource constraints and precedence constraints in make-to-order (MTO) manufacturing environments. Precedence of work- in-process(WIP) and resources constraints have recently emerged as one of the main constraints in advanced scheduling problems. The advanced scheduling problems is formulated as a multiobjective mathematical model for generating operation schedules which are obeyed resources constraints, alternative workstations of operations and the precedence constraints of WIP in MTO manufacturing. For effectively solving the advanced scheduling problem, the multi-objective hybrid genetic algorithm (m-hGA) is proposed in this paper. The m-hGA is to minimize the makespan, total flow time of order, and maximum tardiness for each order, simultaneously. The m-hGA approach with local search-based mutation through swap mutation is developed to solve the advanced scheduling problem. Numerical example is tested and presented for advanced scheduling problems with various orders to describe the performance of the proposed m-hGA.

  • PDF

The Integration of FMS Process Planning and Scheduling Using an Asymmetric Multileveled Symbiotic Evolutionary Algorithm (비대칭형 다계층 공생 진화알고리듬을 이용한 FMS 공정계획과 일정계획의 통합)

  • Kim, Yeo Keun;Kim, Jae Yun;Shin, Kyoung Seok
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.130-145
    • /
    • 2004
  • This paper addresses the integrated problem of process planning and scheduling in FMS (Flexible Manufacturing System). The integration of process planning and scheduling is important for an efficient utilization of manufacturing resources. In this paper, a new method using an artificial intelligent search technique, called asymmetric multileveled symbiotic evolutionary algorithm, is presented to handle the two functions at the same time. Efficient genetic representations and operator schemes are considered. While designing the schemes, we take into account the features specific to each of process planning and scheduling problems. The performance of the proposed algorithm is compared with those of a traditional hierarchical approach and existing evolutionary algorithms. The experimental results show that the proposed algorithm outperforms the compared algorithms.

Low-power Scheduling Framework for Heterogeneous Architecture under Performance Constraint

  • Li, Junke;Guo, Bing;Shen, Yan;Li, Deguang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.5
    • /
    • pp.2003-2021
    • /
    • 2020
  • Today's computer systems are widely integrated with CPU and GPU to achieve considerable performance, but energy consumption of such system directly affects operational cost, maintainability and environmental problem, which has been aroused wide concern by researchers, computer architects, and developers. To cope with energy problem, we propose a task-scheduling framework to reduce energy under performance constraint by rationally allocating the tasks across the CPU and GPU. The framework first collects the estimated energy consumption of programs and performance information. Next, we use above information to formalize the scheduling problem as the 0-1 knapsack problem. Then, we elaborate our experiment on typical platform to verify proposed scheduling framework. The experimental results show that our proposed algorithm saves 14.97% energy compared with that of the time-oriented policy and yields 37.23% performance improvement than that of energy-oriented scheme on average.

Planning and Scheduling using EOT Claim analysis (EOT 클레임 분석 기법을 활용한 공정관리)

  • Woo, Han Kil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.248-249
    • /
    • 2021
  • Planning and Scheduling in Korean has been developed from Bar Chart to CPM, integrated management and EVM were attempted. As growing of overseas projects, Scheduler was also recognized as important one. However, the reality is that most Korean construction projects still remain in the preparation of construction plan and construction schedule in 1990s. The global Planning and Scheduling trend is EOT claims. I would like to understand the global trend of EOT claims and EOT analysis, and to find out Planning and Scheduling measures to successfully promote EOT claims.

  • PDF

On Effective Slack Reclamation in Task Scheduling for Energy Reduction

  • Lee, Young-Choon;Zomaya, Albert Y.
    • Journal of Information Processing Systems
    • /
    • v.5 no.4
    • /
    • pp.175-186
    • /
    • 2009
  • Power consumed by modern computer systems, particularly servers in data centers has almost reached an unacceptable level. However, their energy consumption is often not justifiable when their utilization is considered; that is, they tend to consume more energy than needed for their computing related jobs. Task scheduling in distributed computing systems (DCSs) can play a crucial role in increasing utilization; this will lead to the reduction in energy consumption. In this paper, we address the problem of scheduling precedence-constrained parallel applications in DCSs, and present two energy- conscious scheduling algorithms. Our scheduling algorithms adopt dynamic voltage and frequency scaling (DVFS) to minimize energy consumption. DVFS, as an efficient power management technology, has been increasingly integrated into many recent commodity processors. DVFS enables these processors to operate with different voltage supply levels at the expense of sacrificing clock frequencies. In the context of scheduling, this multiple voltage facility implies that there is a trade-off between the quality of schedules and energy consumption. Our algorithms effectively balance these two performance goals using a novel objective function and its variant, which take into account both goals; this claim is verified by the results obtained from our extensive comparative evaluation study.

Mobile Resource Reliability-based Job Scheduling for Mobile Grid

  • Jang, Sung-Ho;Lee, Jong-Sik
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.5 no.1
    • /
    • pp.83-104
    • /
    • 2011
  • Mobile grid is a combination of grid computing and mobile computing to build grid systems in a wireless mobile environment. The development of network technology is assisting in realizing mobile grid. Mobile grid based on established grid infrastructures needs effective resource management and reliable job scheduling because mobile grid utilizes not only static grid resources but also dynamic grid resources with mobility. However, mobile devices are considered as unavailable resources in traditional grids. Mobile resources should be integrated into existing grid sites. Therefore, this paper presents a mobile grid middleware interconnecting existing grid infrastructures with mobile resources and a mobile service agent installed on the mobile resources. This paper also proposes a mobile resource reliability-based job scheduling model in order to overcome the unreliability of wireless mobile devices and guarantee stable and reliable job processing. In the proposed job scheduling model, the mobile service agent calculates the mobile resource reliability of each resource by using diverse reliability metrics and predicts it. The mobile grid middleware allocated jobs to mobile resources by predicted mobile resource reliability. We implemented a simulation model that simplifies various functions of the proposed job scheduling model by using the DEVS (Discrete Event System Specification) which is the formalism for modeling and analyzing a general system. We also conducted diverse experiments for performance evaluation. Experimental results demonstrate that the proposed model can assist in improving the performance of mobile grid in comparison with existing job scheduling models.

DESIGN AND IMPLEMENTATION OF THE MISSION PLANNING FUNCTIONS FOR THE KOMPSAT-2 MISSION CONTROL ELEMENT

  • Lee, Byoung-Sun;Kim, Jae-Hoon
    • Journal of Astronomy and Space Sciences
    • /
    • v.20 no.3
    • /
    • pp.227-238
    • /
    • 2003
  • Spacecraft mission planning functions including event prediction, mission scheduling, command planning, and ground track display have been developed for the KOMPSAT-2 mission operations. Integrated event prediction functions including satellite orbital events, user requested imaging events, and satellite operational events have been implemented. Mission scheduling functions have been realized to detect the mission conflicts considering the user specified constraints and resources, A conflict free mission scheduling result is mapped into the spacecraft command sequences in the command planning functions. The command sequences are directly linked to the spacecraft operations using eXtensible Markup Language(XML) for command transmission. Ground track display shows the satellite ground trace and mission activities on a digitized world map with zoom capability.