• Title/Summary/Keyword: integrated process

Search Result 4,463, Processing Time 0.035 seconds

An Integrated Process Control Scheme Based on the Future Loss (미래손실에 기초한 통합공정관리계획)

  • Park, Chang-Soon;Lee, Jae-Heon
    • The Korean Journal of Applied Statistics
    • /
    • v.21 no.2
    • /
    • pp.247-264
    • /
    • 2008
  • This paper considers the integrated process control procedure for detecting special causes in an ARIMA(0,1,1) process that is being adjusted automatically after each observation using a minimum mean squared error adjustment policy. It is assumed that a special cause can change the process mean and the process variance. We derive expressions for the process deviation from target for a variety of different process parameter changes, and introduce a control chart, based on the generalized likelihood ratio, for detecting special causes. We also propose the integrated process control scheme bases on the future loss. The future loss denotes the cost that will be incurred in a process remaining interval from a true out-of-control signal.

A Study on Integrated SE Process for the Development of the Railway Systems with Safety Assessment Included (철도 시스템 개발에서 시스템공학 프로세스와 안전성 평가를 동시에 고려한 통합 프로세스에 관한 연구)

  • Yoon, Jae-Han;Lee, Jae-Chon;Hong, Seon-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.438-443
    • /
    • 2007
  • This paper proposes an integrated SE process for the development of railway systems with safety assessment included. Although the safety assessment process must be performed with SE process properly with good coordination, the interfaces between the two processes have not been clear. Thus, in many of safety critical system developments in Korea, it is difficult to assess safety in proper development phase. The process model proposed in this paper is based on both the concept of system life cycle and the repetitive use of SE process. In each of development phases, appropriate safety assessment methods are described. Also the evaluation of the integrated system incorporating safety factors is described. The resultant process model is expressed by the Enhanced Functional Flow Block Diagram (EFFBD) using a CASE tool. The model also allows timeline analysis for identifying activity flow and data flow, resulting in the effective management of process. In conclusion, the integrated process enable both the SE process and safety assessment process to cooperate with each other from early development phase throughout the whole system life cycle.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Object-Oriented Programming of Entity-Based Integrated Design Model (개체형 통합설계모델의 객체지향 프로그래밍)

  • 이창호;김진근
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.211-218
    • /
    • 2002
  • An entity-based integrated design product and process model uses product and process entities to describe design information and design activities, respectively. The concepts and notation for product and process entities in the entity-based integrated design model are similar to the concepts of object-oriented programming languages such as C++ and Smalltalk. This paper uses C++ to program an entity-based integrated design model for building frames structures. The design information and activities involved in the three dimensional building space, the locations of frames, and the grouping of frames represented as entities in the entity-based integrated design model are transformed to C++ codes. Each product or process entity can be basically transformed to an class. The attributes of an entity can be defined as variables and member functions of a class.

  • PDF

Effects of Process-Based Integrated Mathematics·Science Activities on Children's Science Process Skills and Scientific Attitudes (수·과학의 과정중심 통합 활동이 유아의 과학적 탐구능력과 태도에 미치는 효과)

  • Kim, Yong-Sook;Ham, Eun-Suk;Seo, Eui-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.10
    • /
    • pp.4462-4470
    • /
    • 2012
  • This study aims to examine the effects of process-based integrated Mathematics Science Activities on children's science process skills and scientific attitudes and arrange efficient teaching and learning environment in the field. The subjects of research were 89 three-year and five-year old children attending kindergarten attached to W university in I city, Jeollabuk-do and process-based integrated Mathematics Science activities were conducted with themes. For data analysis, paired t-test was conducted with SPSS for Windows program and as a result of performing process-based integrated Mathematics Science activities, it was found that there were significant differences in sub-factors of science process skills and scientific attitude by age and sex. These results suggested that process-based integrated activities had positive influences on three-year and five-yeard old children.

CAD for process innovation in the construction industry

  • Feijo, Bruno;Gomes, Paulo C. Rodacki;Bento, Joao;Scheer, Sergio
    • Structural Engineering and Mechanics
    • /
    • v.4 no.6
    • /
    • pp.717-729
    • /
    • 1996
  • This paper presents the concepts of Process Innovation and Concurrent Engineering in view of their use within Integrated CAD Systems. It follows by proposing process models that support an effective implementation. The work is practically founded on the authors' experience in performing the initial steps of implementation of some of such integrated systems for the construction industry.

Exploring a Learning Progression for Integrated Process Skills in Earth Science Inquiry (지구과학 탐구에서 통합 탐구 기능에 대한 학습발달과정 탐색)

  • Lee, Kiyoung;Park, Jaeyong
    • Journal of the Korean earth science society
    • /
    • v.38 no.3
    • /
    • pp.222-238
    • /
    • 2017
  • The purpose of this study is to explore a learning progression for integrated process skills in Earth science inquiry. For the purpose, a hypothetical learning progression (HLP) that capture how students' integrated process skills of science become sophisticated over time is developed through the literature review. This learning progression contains four components of the integrated process skills of science: designing inquiry, collecting data, analyzing data, and forming conclusion. Three hypothetico-deductive inquiry tasks of Earth science that start from recognition of the given problem to the forming conclusion are developed in order to document students' integrated process skills. A total of 126 students from middle, high, college level students participated in this study. After conducting the Earth science inquiry tasks, the integrated process skills of individual students are assessed by element based on HLP. In addition, the validation process for HLP was administered by applying the Rasch model using the students' assessment data. Finally, based on the analyzed data, the empirical learning progression (ELP) is developed by revising and supplementing the HLP. This study can help to find scaffolding methods to effectively improve the students' integrated process skills in Earth science inquiry class by identifying the factors that affect students' development of integrated process skills. It also provide implications for improving teachers' PCK of Earth science inquiry instruction.

Integrated Manufacturing Systems Design : Integrated Approach to Process Plan Selection and AGV Guidepath Design (통합 제조 시스템 설계 : 공정 계획과 AGV 경로 설계의 통합 접근)

  • Seo, Yoon-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.3
    • /
    • pp.151-166
    • /
    • 1994
  • The manufacturing environment on which this research is focused is an FMS in which AGVs are used for material handling and each part type has one or more process plans. The research aims at developing a methodology whereby, given a part and volume mix for production during any production session, the best set of process plans including one plan per part type is selected and the best unidirectional AGV guidepath can be dynamically reconfigured in response to changes in parts and lot sizes combination. For the integrated PPS/FGD problem in which two functions of process plan selection (PPS) and flexible AGV guidepath design (FGD) are integrated, a zero-one integer programming model is developed. The integrated problem is decomposed into two subproblems, process plan selection given a directed AGV layout and AGV guidepath design with a fixed process plan per part type. A heuristic algorithm that alternately and iteratively solves these two subproblems is developed. The effectiveness of the heuristic algorithm is tested by solving various randomly generated sample problems and comparing the heuristic solutions with those obtained by an exact procedure. From the test results, the following conclusions are drawn: 1) For a reasonable size problem, the heuristic is very effective. 2) By integrating the two functions of PPS and FGD, a remarkable benefit in total production time for a given part and volume mix is gained.

  • PDF

Offshore Process FEED(Front End Engineering Design) Method for Integrated Process Engineering (통합 프로세스 엔지니어링을 위한 해양 프로세스 기본 설계 방법론)

  • Hwang, Ji-Hyun;Roh, Myung-Il;Cha, Ju-Hwan;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.47 no.2
    • /
    • pp.265-277
    • /
    • 2010
  • In this study, an offshore process FEED(Front End Engineering Design) method is systematically established to perform integrated process engineering for topsides systems of LNG FPSO(Floating, Production, Storage, and Off-loading unit) based on the concepts and procedures for the process FEED of general offshore production plants. First, various activities of the general process FEED engineering are summarized, and then the offshore process FEED method, which is suitable for application to all types of offshore oil and gas production plants, is proposed. Second, an integrated process engineering environment is built based on the proposed FEED method. Finally, the integrated process engineering environment is applied to topsides systems of an LNG FPSO in order to verify the validity and applicability of the proposed FEED method. As a result, it is shown that the proposed FEED method can be applied to the process FEED engineering of FPSOs and moreover will be able to contribute to perform successful offshore projects in the future.

Development of Integrated Variable Sampling Interval Engineering Process Control & Statistical Process Control System (가변 샘플링간격 EPC/SPC 결합시스템의 개발)

  • Lee, Seong-Jae;Seo, Sun-Geun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.723-729
    • /
    • 2005
  • Traditional statistical process control(SPC) applied to discrete part industry in the form of control charts can look for and eliminate assignable causes by process monitoring. On the other hand, engineering process control(EPC) applied to the process industry in the form of feedback control can maintain the process output on the target by continual adjustment of input variable. This study presents controlling and monitoring rules adopted variable sampling interval(VSI) to change sampling intervals in a predetermined fashion on the predicted process levels for integrated EPC and SPC systems. Twelve rules classified by EPC schemes(MMSE, constrained PI, bounded or deadband adjustment policy) and type of sampling interval combined with EWMA chart of SPC are proposed under IMA(1,1) disturbance model and zero-order (responsive) dynamic system. The properties of twelve control rules under three patterns of process change(sudden shift, drift and random shift) are evaluated and discussed through simulation and control rules for integrated VSI EPC and SPC systems are recommended.

  • PDF