• Title/Summary/Keyword: integral bridge

Search Result 131, Processing Time 0.022 seconds

The Experimental Study on the Effect of Track System on the Integral Behavior of Railway Bridge (궤도시스템이 철도교량의 정.동적거동에 미치는 영향에 관한 실험적 연구)

  • Sung, Deok-Yong;Park, Yong-Gul;Choi, Jung-Youl;Kim, Sung-Il
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.186-193
    • /
    • 2010
  • Track system and periodic live load are characteristics of railway bridges. In the design and construction of railway bridge, periodic live load increases the importance of dynamic behavior. And It is well known that behavior of railway bridge may be affected by track system in real bridge. Through experimental study, static and dynamic behaviors were investigated. Deflection and stress due to bending moment were measured, the location of neutral axis of each section, natural frequency, damping ratio were analyzed for each three track systems - girder only, installed ballast track system and installed concrete slab track system. According to measured values for the each type of track system, concrete track system increases the stiffness of bridge by 50%, and ballast system does by 7%, dynamic responses of structure change linearly with the magnitude of load and location of neutral axis of each sections varies with each track system. Damping ratio is almost equal without and with track. Therefore, the effects of track system on the integral behaviors of railway bridge can not be ignored in the design of bridge, especially in the case of concrete slab track system. So study of the quantitative analysis method for effects of track system must be performed.

DC Voltage Balancing Control of Half-Bridge PWM Inverter for Liniear Compressor of Refrigerator (냉장고의 선형압축기 구동을 위한 단상 하프브리지 인버터 시스템에서 직류단 불평형 보상에 관한 연구)

  • Kim, Ho-Jin;Kim, Hyeong-Jin;Kim, Dong-Youn;Kim, Jang-Mok
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.22 no.3
    • /
    • pp.256-262
    • /
    • 2017
  • This paper presents the control algorithm of a single-phase AC/DC/AC PWM converter for the linear compressor of a refrigerator. The AC/DC/AC converter consists of a full-bridge PWM converter for the control of the input power factor and a half-bridge PWM inverter for the control of the single-phase linear compressor. At the DC-link of this topology, two capacitors are connected in series. These DC-link voltages must be balanced for safe operation. Thus, a new control method of DC voltage balancing for the half-bridge PWM inverter is proposed. The balancing algorithm uses the Integral-Proportional controller and inserts the DC-offset current at the Proportional-Resonant current controller of the inverter to solve the DC-link unbalanced voltages between the two capacitors. The proposed algorithm can be easily implemented without much computation and additional hardware circuit. The usefulness of the proposed algorithm is verified through several experiments.

Performance Improvement on Plate Girder Bridges Through Continuous Welded Rail (판형교 장대화에 따른 성능 개선)

  • Min, Kyung-Joo;Bahn, Gul-Yong;Ryu, Yeon-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1439-1449
    • /
    • 2007
  • The challenging aspect of CWR (continuous welded rail) is the additional axial forces in rails, mainly due to the thermal expansion of steel plate girder and rail itself. It has been found that these axial forces are proportional to girder length, total bridge length and bolt tightening forces. Also these forces are dependent to girder support conditions, types of bearings and their arrangements. With CWR, the authors' previous studies show that performance improvements like noise reduce, fatigue resistances and bearing durability increment can be expected. In addition to these effects, secondary effects due to the semi integral behavior between rail and bridge girder also can be expected. Special bearings which can reduce the absolute maximum axial forces have been developed, and applied to real 100m span bridge. The performance improvements were verified through site measurements and numerical analysis. The purpose of this study is to confirm the expected performance improvement aspects of steel plate girder bridges with CWR. To verify these aspects, girder stiffness changes, rail axial force changes, girder displacements and noise level were thoroughly measured and compared.

  • PDF

Active tendon control of suspension bridges: Study on the active cables configuration

  • Tian, Zhui;Mokrani, Bilal;Alaluf, David;Jiang, Jun;Preumont, Andre
    • Smart Structures and Systems
    • /
    • v.19 no.5
    • /
    • pp.463-472
    • /
    • 2017
  • In a previous study, the potential of damping suspension bridges with active stay cables has been evaluated on a numerical model of a suspension bridge, and demonstrated experimentally on a laboratory mockup. In this paper, we extend our study to explore two different configurations of the active stay-cables: one classical configuration, corresponding to attaching the active stay-cables between the top of the pylons and the deck (configuration I) and, another configuration, consisting of attaching the stay-cables between the base of the pylons and the catenary (configuration II). The analysis confirmed that both configurations are effective with a slight superiority of the second configuration. The study is conducted numerically and experimentally on a suspension bridge mock-up, by considering two types of active stay-cables. The experimental results confirmed the numerical predictions, and demonstrated the effectiveness of the second configuration.

The influence of different support movements and heights of piers on the dynamic behavior of bridges -Part II: earthquake acting along the bridge axis

  • Raftoyiannis, I.G.;Konstantakopoulos, T.G.;Michaltsos, G.T.
    • Interaction and multiscale mechanics
    • /
    • v.3 no.1
    • /
    • pp.39-54
    • /
    • 2010
  • In this paper, a simple approach is presented for studying the dynamic response of multi-span steel bridges supported by pylons of different heights, subjected to earthquake motions acting along the axis of the bridge with spatial variations. The analysis is carried out using the modal analysis technique, while the solution of the integral-differential equations derived is obtained using the successive approximations technique. It was found that the height of piers and the quality of the foundation soil can affect significantly the dynamical behavior of the bridges studied. Illustrative examples are presented to highlight the points of concern and useful conclusions are gathered.

Digital Control of Secondary Active Clamp Phase-Shifted Full-Bridge Converters

  • Che, Yanbo;Ma, Yage;Ge, Shaoyun;Zhu, Dong
    • Journal of Power Electronics
    • /
    • v.14 no.3
    • /
    • pp.421-431
    • /
    • 2014
  • A DSP-based self-adaptive proportional-integral (PI) controller to control a DC-DC converter is proposed in this paper. The full-bridge topology is adopted here to obtain higher power output capability and higher conversion efficiency. The converter adopts the zero-voltage-switching (ZVS) technique to reduce the conduction losses. A parallel secondary active clamp circuit is added to deal with the voltage overshoot and ringing effect on the transformer's secondary side. A self-adaptive PI controller is proposed to replace the traditional PI controller. Moreover, the designed converter adopts the constant-current and constant-voltage (CC-CV) output control strategy. The secondary active clamp mechanism is discussed in detail. The effectiveness of the proposed converter was experimentally verified by an IGBT-based 10kW prototype.

Evaluation of Structural Behavior and Moment of Inertia on Modular Slabs Subjected to Cyclic Loading (반복하중을 받는 모듈러 슬래브의 거동 및 단면2차모멘트 평가)

  • Park, Jongho;Choi, Jinwoong;Lee, Hong-Myung;Park, Sun-Kyu;Hong, Sungnam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.6
    • /
    • pp.95-102
    • /
    • 2015
  • Recently, the maintenance activity for aging of bridge structures was difficult because of traffic jam, environment pollution and increasing cost. And to solve these problems, modular bridge research has been studied. After static and cyclic loading test was conducted for serviceability and bending performance with one way slab, effective moment of inertia of modular specimen was analyzed to estimate the deflection by KCI(2012). To conduct the test, one integral slab and three modular slabs were made for static loading and one integral and modular slab were made for cyclic. As a result of the test, the modular slab had the similar bending performance of the integral. But the ultimate deflection showed the insufficient which was smaller than 20%. In the cyclic loading test, the modular slab has different behavior of deflection with the integral, so it was evaluated difficult for serviceability. In addition, effective moment of inertia by KCI(2012) was not estimated for modular slab with connection. The new value of m which was ratio between moments is 4.53 based on result of test for predicting deflection of modular.

Fatigue Capacity Evaluation of the Girder-Abutment Connection for the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar (PS 강봉으로 일체화된 강합성 라멘교의 거더-교대 접합부에 대한 피로 성능 평가)

  • Ahn, Young-Soo;Oh, Min-Ho;Chung, Jee-Seung;Lee, Sang-Yoon
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.3
    • /
    • pp.249-258
    • /
    • 2012
  • Integral and rigid frame bridges have advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection is rather complex and increases construction cost depending on construction detail. For the purpose of compensating disadvantages such as complexity and additional cost, a new type of bridge is proposed in this study, which improves the efficiency of construction by simplifying the construction detail of girder-abutment connection. The proposed bridge has the connection detail of steel girder and abutment integrated by prestressed PS bar installed in the connection. In this study, finite element analysis and fatigue load test are conducted to evaluate the fatigue capacity of the proposed girder-abutment connection. The results of the finite element analysis revealed that the possibility of the fatigue damage in the girder-abutment connection is very low. The results of the fatigue load test verified that the integrity of the girder and abutment connection is maintained after 2,000,000 cycles of fatigue loading.

Strengthened and flexible pile-to-pilecap connections for integral abutment bridges

  • Lee, Jaeha;Kim, WooSeok;Kim, Kyeongjin;Park, Soobong;Jeong, Yoseok
    • Steel and Composite Structures
    • /
    • v.20 no.4
    • /
    • pp.731-748
    • /
    • 2016
  • Pile-to-pilecap connection performance is important as Integral abutment bridges (IABs) have no expansion joints and their flexible weak-axis oriented supporting piles take the role of the expansion joint. This connection may govern the bridge strength and the performance against various lateral loads. The intention of this study is to identify crack propagation patterns when the pile-to-pilecap connection is subjected to lateral loadings and to propose novel connections for improved performance under lateral loadings. In this study, eight different types of connections were developed and modeled, using Abaqus 6.12 to evaluate performances. Three types were developed by strengthening the connections using rebar or steel tube: (i) PennDOT specification; (ii) Spiral rebar; and (iii) HSS tube. Other types were developed by softening the connections using shape modifications: (i) cylindrical hole; (ii) reduced flange; (iii) removed flange; (iv) extended hole; and (v) slot hole connection types. The connections using the PennDOT specification, HSS tube, and cylindrical hole were shown to be ineffective in the prevention of cracks, resulting in lower structural capacities under the lateral load compared to other types. The other developed connections successfully delayed or arrested the concrete crack initiations and propagations. Among the successful connection types, the spiral rebar connection allowed a relatively larger reaction force, which can damage the superstructure of the IABs. Other softened connections performed better in terms of minimized reaction forces and crack prevention.

Development of Abutment-H pile Connection for Large Lateral Displacements of Integral Abutment Bridges (일체식 교대 교량의 대횡변위를 위한 교대와 H형 말뚝 연결부의 개발)

  • Kim, Woo Seok;Lee, Jaeha;Park, Taehyo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.4
    • /
    • pp.309-318
    • /
    • 2013
  • Abutment-to-pile connection in an integral abutment bridge is vulnerable to lateral displacement induced by thermal movement of the superstructure. However, previous researches have merely focused on the connection. In order to improve the performance of the connection, new abutment-to-pile connection designs were proposed based on quasi-static nonlinear finite element model. The reinforcement detail specified in PennDOT DM4 and HSS tube were barely effective in controlling crack growing but spiral rebar effectively performed to delay crack growth as well as absorbing energy capacity. However, it was found that delaying cracking and strengthening the connection also caused the high lateral load in superstructures. Consequently, shape of HP pile were modified to introduce plastic hinge of the HP pile for reducing the lateral load in superstructures. Connections with modified HP pile significantly prevented crack propagations under the lateral displacement.