• 제목/요약/키워드: insulated joint

검색결과 23건 처리시간 0.022초

케이블 크로스본드 및 CCPU 적용검토 (Consideration of cable cross bonding and cable covering protection units)

  • 김영;김장원;성정규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 하계학술대회 논문집 C
    • /
    • pp.1646-1648
    • /
    • 1994
  • In the system of underground transmission line, the rate of electrical failure is very low, but, if once occuring, the failure evolves into a paralysis of the system, the time of restoration is very long, the damage from stopping of power supply is very serious, and the cost of restoration is very great. Because of these problems, you must try to protect the system and equipment from every electrical failure by contributing much carefulness to the design and operation of the underground system. This study summerizes the results of simmulation tests about the effect of installing this protection device on the insulated joint box and the terminal end box.

  • PDF

시스 순환전류 저감장치의 개발 및 전기적 특성 검토 (Development of Restraining-unit of Sheath Circulating Current and Its Electrical Characteristics)

  • 하체웅;김정년;김동욱;강지원;김재승
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.394-396
    • /
    • 2004
  • In order to reduce the sheath circulating current, same arrangement and balanced length of cable are required for the underground cable system. But practically, changing the whole arrange of cable which is already constructed is impossible. Therefore, It is necessary to apply the restraining-unit of sheath circulating current at the cross-bonding wire of insulated joint because the impedance of restraining-unit is able to reduce sheath circulating current at a normal condition. Even at a transient state, the restraining-unit must maintain electrical and mechanical characteristics. In this paper, the features of restraining-unit developed by LG Cable as well as the electrical test results are described. It proves that the restraining-unit is applicable to the underground cable system where sheath circulating current rises.

  • PDF

XLPE/EPR 계면의 부분방전 패턴 분석을 위한 신경망 모형 (Neural Network Model for Partial Discharge Pattern Analysis of XLPE/EPR Interface)

  • 조경순
    • 한국컴퓨터산업학회논문지
    • /
    • 제6권2호
    • /
    • pp.357-364
    • /
    • 2005
  • 최근 들어 우리나라에서는 설치의 간편성과 높은 신뢰도를 가진 전력케이블의 사용이 증가하고 있다. 전력케이블은 출고 전에 IEEE std. 404-1993 시험을 거쳐 안정성을 확인하고 있지만 포설시 발생하는 접속부 내부의 결함으로 인하여 많은 문제가 발생하고 있다. 특히 불순물 혼입 또는 공극 발생시 고장율은 증가하게 된다 부분방전 검출은 포설 후 전력케이블의 상태를 관측할 수 있는 유용한 방법이다. 본 연구에서는 부분방전 특성을 평가하고자 케이블 접속재인 EPR과 케이블 절연체인 XPLE 사이에 인공 결함을 발생시킨 후 데이터 취득 시스템을 이용하여 $\Phi-q-n$ 특성을 검출하였으며, 부분방전의 정량적 해석을 위해 필요한 통계량을 계산하였으며, 신경망 모델을 적용하여 패턴 분석을 수행하여 $88\~96\%$의 구별이 가능하였다.

  • PDF

XLPE/EPR 계면의 부분방전 패턴 분석을 위한 신경망 모형 (Neural Network Model for Partial Discharge Pattern Analysis of XLPE/EPR Interface)

  • 조경순
    • 한국컴퓨터산업학회논문지
    • /
    • 제6권2호
    • /
    • pp.279-286
    • /
    • 2005
  • 최근 들어 우리나라에서는 설치의 간편성과 높은 신뢰도를 가진 전력케이블의 사용이 증가하고 있다. 전력케이블은 출고 전에 IEEE std. 404-1993 시험을 거쳐 안정성을 확인하고 있지만 포설시 발생하는 접속부 내부의 결함으로 인하여 많은 문제가 발생하고 있다. 특히 불순물 혼입 또는 공극 발생시 고장율은 증가하게 된다. 부분방전 검출은 포설 후 전력케이블의 상태를 관측할 수 있는 유용한 방법이다. 본 연구에서는 부분방전 특성을 평가하고자 케이블 접속재인 EPR과 케이블 절연체인 XPLE 사이에 인공 결함을 발생시킨 후 데이터 취득 시스템을 이용하여 $\Phi-q-n$ 특성을 검출하였으며, 부분방전의 정량적 해석을 위해 필요한 통계량을 계산하였으며, 신경망 모델을 적용하여 패턴 분석을 수행하여 $88\~96\%$의 구별이 가능하였다.

  • PDF

데이터 취득 시스템을 이용한 전력케이블의 부분방전 검출과 통계량 계산 (Partial Discharge Detection and Statistic Value Calculation of Power Cable Using Data Acquisition System)

  • 조경순
    • 한국컴퓨터산업학회논문지
    • /
    • 제3권12호
    • /
    • pp.1651-1658
    • /
    • 2002
  • 최근 들어 우리나라에서는 설치의 간편성과 높은 신뢰도를 가진 전력케이블의 사용이 증가하고 있다. 전력케이블은 출고 전에 IEEE std. 404-1993 시험을 거쳐 안정성을 확인하고 있지만 포설시 발생하는 접속부 내부의 결함으로 인하여 많은 문제가 발생하고 있다. 특히 불순물 혼입 또는 공극 발생시 고장율은 증가하게 된다. 부분방전 검출은 포설 후 전력케이블의 상태를 관측할 수 있는 유용한 방법이다. 본 연구에서는 부분방전 특성을 평가하고자 케이블 접속재인 EPR과 케이블 절연체인 XPLE 사이에 인공 결함을 발생시킨 후 데이터 취득 시스템을 이용하여 ${\varphi}$-q-n 특성을 검출하였으며, 부분방전의 정량적 해석을 위해 필요한 통계량인 최대방전전하량($q_{max}$), 평균방전 발생 펄스 수(${\={n}$), 평균 방전전하량(${\={q}$), ${\={n}$의 언밸런스 비와${\={q}$의 언밸런스 비를 계산하였다.

  • PDF

Experimental investigation of the behaviour of a steel sub-frame under a natural fire

  • Santiago, Aldina;Simoes da Silva, Luis;Vaz, Gilberto;Vila Real, Paulo;Lopes, Antonio Gameiro
    • Steel and Composite Structures
    • /
    • 제8권3호
    • /
    • pp.243-264
    • /
    • 2008
  • This paper details a testing facility ("NATURAL FIRE FACILITY") that allows closely-controlled experimental testing on full-scale sub-frames while reproducing the spatially transient temperature conditions measured in real fires. Using this test facility, an experimental investigation of six steel sub-frames under a natural fire was carried out at the Department of Civil Engineering of the University of Coimbra. The main objective of these tests was to provide insight into the influence of these connection types on the behaviour of steel sub-structures under fire. The experimental layout is defined by two thermally insulated HEA300 columns and an unprotected IPE300 beam with 5.7 m span, supporting a composite concrete slab. Beam-to-column connections are representative of the most common joint type used on buildings: welded joints and extended, flush and partial depth plate. Finally, the available results are presented and discussed: evolution of the steel temperature; development of displacements and local deformations and failure modes on the joints zone.

그린건축을 위한 열교차단 특허기술의 조사 및 분석 연구 (Investigation and Analysis of Patents for the Thermal Bridge Breaker in Green Buildings)

  • 김영호;김형준;이희영
    • 한국디지털건축인테리어학회논문집
    • /
    • 제13권2호
    • /
    • pp.35-43
    • /
    • 2013
  • The green building is one of biggest factors to go the goal of energy saving and environmental conservation, "reduction of energy consumption, friendly energy technology, recycling of resource, and environmental pollution reduction technology. The purpose of these green buildings realized by the energy-saving technology such as the thermal bridge breaker(or thermal bridge block). Thermal bridges are localized elements that penetrate insulated portions of building envelope that results in heat loss. The purpose of this paper is to describe the technical interactions for patents of a thermal bridge breaker(TTB) used in green building practices, and be subject to investigation to TTB in the leading countries, that is, United State, Europe Union, Japan, and Korea. As a result, there are four TTB categories(roof, wall-slab connection, opening, footing) in house or building. The TTB categories is remarkable technology that is apparatus in slab-wall joints and sealing element of opening frame in walls.

345kV 혼합송전선로에서 재폐로가 절연설계에 미치는 영향 (Effects of Reclosing for Insulation Coordination in 345kV Combined Transmission Lines)

  • 이종범;정채균;임광식;강지원
    • 전기학회논문지
    • /
    • 제59권5호
    • /
    • pp.847-853
    • /
    • 2010
  • This paper describes switching surge analysis for reclosing decision in 345kV combined transmission line with XLPE power cable. Reclosing operation should be decided based on the detailed technical analysis in combined transmission line because this line includes power cable section which is week on insulation. Insulation of power cable can be breakdown at the week point in case of reclosing moment. Therefore the detailed analysis has to be carried out by considering several conditions such as length ratio of power cable section, arrestor, inserting resistance, charging rate, grounding resistance, etc.. On the other hand sheath voltage on IJ(Insulated Joint) is analyzed to check dangerous condition on cable cover. Analysis is performed by EMTP/ATP. Analysis results show that reclosing can be operated as the single line-to-ground fault occurs on overhead line in 345kV combined transmission line, if the inserting resistance is considered before the operation of main circuit breaker.

154kV 혼합송전선로 재폐로 결정에 관한 연구 (A Study on Reclosing Decision on 154kV Combined Transmission Lines)

  • 정채균;박흥석;강지원;이종범
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1761-1769
    • /
    • 2010
  • This paper describes switching surge analysis on reclosing decision in 154kV combined transmission line with power cables. Reclosing should be operated in combined transmission line based on the technical evaluation because of insulation problem of power cable section. If the surge strikes on power cable, the breakdown can occur at week point of cable insulation. Therefore the detailed analysis is required by considering several conditions such as length ratio of power cable, arrester, fault resistance, charging rate and grounding resistance, etc.. In addition, sheath voltage on IJ(Insulated Joint) is analyzed to confirm the protective level. Simulation is performed by EMTP/ATP. Analysis results show that reclosing can be operated without any special problem by the single line-to-ground fault with fault resistance of $1\Omega$ to $50\Omega$ occurred at the overhead transmission section in 154kV combined transmission lines and trap charge of 100% and 110%.

퍼지추론시스템 기반 지중송전계통 보호용 거리계전 알고리즘 개발 (Fuzzy Inference System Based Distance Relay Algorithm Development for Protecting an Underground Power Cable Systems)

  • 정채균;오성권;박건준;이재규;이종범
    • 전기학회논문지
    • /
    • 제57권2호
    • /
    • pp.172-178
    • /
    • 2008
  • If the fault occurs on the underground power cable systems, the fault current on the sheath has an influence on all sections of cable because it's returned through earth at the directly grounded point and operation point of SVL(Sheath Voltage Limiter) on each insulated joint box. Therefore, the earth resistance and the operation of SVL have an effect on the zero-sequence current, and then the impedance between relaying point and fault point is increased. That causes the overreach of distance relay. For these reasons, the distance relay algorithm for protecting an underground power cable systems hasn't been developed till now. In this paper, new distance relay algorithm is developed for protecting a underground power cable system using fuzzy inference system which is the one of ACI(Advanced Computational Intelligence) techniques. This algorithm is verified by EMTP simulation of real power cable system, and proves to effectively advance the errors