• Title/Summary/Keyword: insitu-production

Search Result 5, Processing Time 0.02 seconds

An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members (합성 PC 부재의 현장생산 및 설치 공정계획의 영향요소 분석)

  • Lim, Chaeyeon;Kim, Sun Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.176-177
    • /
    • 2013
  • The composite PC rahmen structure, called Green Frame, allows the main structural members such as PC column and beam to be produced on the site, resulting in a reduction of PC member transportation cost and the margin of PC plant (operation cost and profit), making it more economic than the bearing wall structure. To apply the Green Frame to practice, not only installation but also insitu-production process should be considered. Therefore, this study analyse the influence factors on insitu-production and installation schedule of composite precast concrete members. The results shall be used as basic criteria on the planning of insitu-production and installation of Green Frame.

  • PDF

Basic study for time analysis of insitu production of composite precast concrete members using linear scheduling method (LSM을 사용한 합성 PC 부재의 현장생산 공기 산정 기초연구)

  • Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.92-93
    • /
    • 2014
  • Green Frame is a method for Rahmen structure construction composed of composite PC members. The composite PC members of Green Frame which are based on in-situ production can reduce the construction cost and are more likely to secure quality when compared to production in factories. Previous studies developed forms for in-situ production of Green Frame composite PC members and proposed algorithms to arrange them on site. However, it requires not only their arrangement, but also calculation of an accurate production period to produce the required PC members in a limited space and supply them in a timely manner. In particular, it is necessary to clearly define the properties of detailed processes for in-situ production of PC members and to calculate the time required for respective process. To do so, this study is a basic research on calculating the time for in-situ production using a linear scheduling method.

  • PDF

Nanoporous Organo-functional Silica Synthesis Based on a Purely Inorganic Precursor

  • Oh, Chang-Sup;Koo, Kyung-Wan;Han, Chang-Suk;Kim, Jang-Woo;Kim, Heon-Chang;Lee, Yong-Sang;Choi, Young-Tai;Kim, Yong-Ha
    • Korean Journal of Metals and Materials
    • /
    • v.47 no.8
    • /
    • pp.516-521
    • /
    • 2009
  • In this study we report a rapid synthesis of nanoporous organo-functional silica (OFS) with unimodal and bimodal pore structures encompassing pores ranging from meso-to macroscale. The problems of tediousness and high production cost in the conventional syntheses are overcome by co-condensation of an inexpensive inorganic precursor, sodium silicate with an organosilane containing trimethyl groups. The insitu covalent anchoring of the non-polar trimethyl groups to the inner pore walls prohibits irreversible shrinkage of the wet-gel during microwave drying at ambient pressure and thus larger size pores (from ca. 20 to ca. 100 nm) can be retained in the dried silica. The drying process of the silylated wet-gels at an ambient pressure can be greatly accelerated upon microwave exposure instead of drying in an oven or furnace. Using this approach, anoporous and superhydrophobic silicas showing a wide variation in texture and morphology can be readily synthesized in roughly two hours. The effects of various sol-gel parameters solely on the textural properties of the organo-functional silica (OFS) have been investigated and discussed.

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF

A Study on Improvement of Test Method of Nuclear Power Plant ESF ACS by applying Regulatory Guide 1.52 (Rev.3) (Reg. Guide 1.52(Rev.3)를 적용한 원전 ESF 공기정화계통 성능시험법 개선 연구)

  • Lee, Sook-Kyung;Kim, Kwang-Sin;Sohn, Soon-Hwan;Song, Kyu-Min;Lee, Kae-Woo;Park, Jeong-Seo;Cho, Byoung-Ho;Yoo, Byeang-Jea;Hong, Soon-Joon;Kang, Sun-Haeng
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.8 no.4
    • /
    • pp.311-318
    • /
    • 2010
  • U. S. NRC Regulation Guide 1.52 regulating ESF ACS in nuclear power plants has been revised to revision 3. To apply reduction of operability test time, allowance of alternative challenge agents for in-place leak test of HEPA filters, and upgrade of Methyl Iodide penetration acceptance criterion in activated carbon performance test suggested in Reg. Guide 1.52(Rev.3) on Yonggwang units 5 and 6 ESF ACSes, technical feasibility study was carried out with on-site experiments as well as experiments with a lab-scale model. It was confirmed that the moisture in the system returned to the level before the test in 1 or 4 days even though the moisture was removed during the operability test lasting more than 10 hours. Therefore, it is appropriate to perform monthly operability test in 15 minutes just long enough to check the operability of equipment. To change challenge material for in-place HEPA filter leak test, size of aerosol, production rate, and leak detection capability were compared for DOP and PAO. It was concluded that PAO can be substituted for DOP in nuclear power plants. The upgrade of Methyl Iodide penetration acceptance criterion from 0.175 % to 0.5 % in active carbon filter bed deeper than 4 inches was to conform to the change of activated carbon performance test method to ASTM D3803(1989). It was confirmed that Methyl Iodide penetration acceptance criterion of 0.5 % under $30^{\circ}C$, relative humidity 95 % condition was conservatively good enough for testing performance of active carbon insitu. The licence change of Yonggwang units 5 and 6 has been completed based on this study.