• 제목/요약/키워드: industry-university project

검색결과 1,267건 처리시간 0.027초

공동기술개발 프로젝트의 성패요인: 우리나라 전자부품 중소기업 분석 (Key Success Factors for Collaborative Technology Development Projects: The Case of Small & Medium Firms in the Korean Electronics Parts Industry)

  • 이광희;김영배
    • 기술혁신연구
    • /
    • 제6권2호
    • /
    • pp.122-158
    • /
    • 1998
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 82 projects in the Korean electronic parts industry. The patterns of R&D collaboration were categorized into 4 types by two criteria development motive(technology Push/market pull) and Project initiator (focal firm/partner). The bivariate relationships revealed that project characteristics (technological complexity, market uncertainty), management characteristics (participation in project formulation), problem solving characteristics(problem solving performance of the focal firm, users active role in problem solving, active role of university or research institute in problem solving) and success rates appear to be different among four types of collaboration. Each type of collaborative R&D projects also had different KSFs. The KSFs of type 1 (technology Push and focal firm initiation), for instance, include the strategic importance of the project, focal firms share of cost, active role of university or research institute in problem solving, while those of type 4(market pull and customer initiation) cover reliability of partner relationship, a time at partners involvement, information sharing. The findings suggest that the different contingencies brought different patterns and KSFs of collaborative R&D project, since different information, resources, and partners roles were needed to successfully implement the projects according to development motive and project initiator Finally, managerial, policy, and theoretical implications for the collaborative R&D activities in the Korean electronics parts industry were discussed, based on empirical results of this study.

  • PDF

어촌뉴딜300 사업의 경제적 파급효과 분석 (The Analysis on Economic Ripple Effect of the Fishing Village New Deal 300 Project)

  • 이서구;김정태
    • 수산경영론집
    • /
    • 제50권3호
    • /
    • pp.73-86
    • /
    • 2019
  • The purpose of this study is to provide logical and policy justification for the feasibility and sustainability of the project through analysis of economic ripple effects of the fishing village new deal 300 project. To do this, we applied the industry-related analysis, which is mainly used to analyze the economic ripple effects, to the fishing village new deal 300 project. The industry association analysis classifies the detailed project of the preliminary plan for the selection of the business into the software business such as the hardware business and the capacity enhancement in the construction field and analyzes the economic ripple effect through the inter-industry association. As a result, it is expected that the fishing village new deal 300 project will have a positive economic impact. When the total investment of 3 trillion won is invested in the project, it is estimated that the production inducement effect and the value added effect are 5,545.3 billion won and 2,102.7 billion won, respectively. In addition, 62,005 get job inducements, where 10,952 employment inducements were associated with job creation. The analysis of the above impacts seems to have secured the logical justification for the implementation of the fishing village new deal 300 project.

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

일본의 자원 리싸이클링 산업 동향 (The Actual Situation of Japanese Resources and Recycling Industry ---Considering METI's Eco Town Project)

  • Togawa, Kenichi
    • 한국자원리싸이클링학회:학술대회논문집
    • /
    • 한국자원리싸이클링학회 2005년도 춘계임시총회 및 제25회 학술발표대회
    • /
    • pp.19-19
    • /
    • 2005
  • In this paper, the author analyzed the characteristics of cycle Economy which is a key concept of current Japanese environmental policy. The Japanese government has adopted the Eco Town Project in order to grow up vein industry. But it is not clear that Eco lown project alms to create cycle society or sustainable society. When considering the location of vein industries, it is important to consider how efficient this industry collects wastes and develops a recycling goods market. Present Japanese law requires the people and companies to reduce waste. As a result, conventional manufacturing discharges waste this is too massive for vein industry to dispose of or recycle.

  • PDF

Ontology based Integrated Construction Information Management for Modernized Traditional Housing (Hanok)

  • Lee, Heewoo;Lee, Yunsub;Jin, Zhenhui;Gebremichael, Dagem Derese;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.162-169
    • /
    • 2022
  • In an attempt to disseminate modernized Korean traditional housing (Hanok), a ten-year research project was initiated in 2010 by the Korean Government to reduce the construction cost, improve the facility performance, and automate the Hanok construction industry. To meet these objectives, various research areas, including public policies, planning methods, design standards, new building materials, construction standards, maintenance procedures, advanced project management tools, and integrated IT applications have been developed. In addition, comprehensive technologies developed were applied to the ten pilot Hanok buildings to validate the real-world performance as part of the research project. To further facilitate the digital transformation of the Hanok industry by using the research results, it is required to disseminate the developed technologies in an automated and standardized manner. In particular, it is crucial to systematize and manage the interoperability of various technical data and accumulated historical data for different business functions, especially within the highly fragmented industry. In this context, this paper proposes an ontology-based Hanok information dissemination platform to enable industry-wide automated knowledge and information sharing. The system architecture, standardized historical database, and advanced analytics based on ontology web language (OWL) for the Hanok industrialization platform are introduced.

  • PDF

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • 황본강
    • 한국건설관리학회논문집
    • /
    • 제7권6호
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

A Review of Safety and Quality Issues in the Construction Industry

  • Ogwueleka, Amaka Chinweude
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.42-48
    • /
    • 2013
  • Construction industry is considered as the most hazardous industry due to its unique nature. Safety and quality management are essential to control hazards and improve success in project implementation. This paper focuses on evaluating the crucial factors influencing safety and quality management in construction projects. In order to achieve this, the qualitative and quantitative approaches were used for data collection. The findings of this study reveal the crucial safety factors as management commitment, safety awareness of top management practices/ procedures/ reviews, and errors in judgement or carelessness. Project supervision, employee involvement/ altitude, and expertise knowledge/ training were considered as the crucial quality factors influencing safety and quality management. The study shows that safety and quality issues cannot be overlooked therefore proper implementation is paramount to achieve project success.

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권3호
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.

프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로 (Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry)

  • 장희석;최성용;이민호
    • 산업경영시스템학회지
    • /
    • 제41권3호
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF