A TIME DETERMINATION MODEL INCORPORATING RISK MANAGEMENT BASED ON MALAYSIAN CASE STUDIES

  • Sim Nee Ting;Chung Thing Chong
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.642-648
    • /
    • 2009
  • Determining the total duration for a construction project is an integral part of project management in the construction industry. This is to ensure the project and all its associated activities can be carried out and completed within the time frame stipulated. There are several commonly used scheduling methods and techniques in project management, some of which involves manual calculation while others involve computer software. This paper looks into the various time determination methods, extracting out their differences and similarities. It also seeks to draw out the problems when determining time for projects, especially those encountered of case studies. Based on the results from the case studies, there were delays on certain projects even though time determination had been carried out rigorously prior to the commencement of the projects. This paper seeks to develop a time determination model, which incorporates risk management techniques into the calculations in order to improve the method for time estimation to minimize the chances of project delay.

  • PDF

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Cooperative Design Method for Building Projects (건축 프로젝트의 협력설계 방안)

  • Kim, Eun-Youn;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.67-76
    • /
    • 2011
  • Two main features of the recent building project are the enlargement of the size and the technological complexity. Due to these features, the number or the size of organizations participating in building project is also increasing and the relationships between the organizations are becoming more interdependent than ever. Owing to these features, some delays or errors in the decision-making process in the phase of planning of a building project may influence many subjects related to the project. The most important factor for a successful project is to arbitrate confrontations and build cooperative relationships between parties who have different interests with one another in the project. Efforts were made to find out general features of building project and the features in the phase of planning in order to set a direction of this research. To solve problems in the phase of planning, the concept of 'cooperative design', which means that different features and interests of various organizations should be reflected from the phase of planning, was introduced. By introducing cooperative design in building projects, more rapid and objective decision-makings are possible.

  • PDF

Development of Risk Analysis System for Integrated Environmental Management in Korea

  • Shin, Dong-Chun;Kim, Ye-Shin;Park, Sung-Eun;Yang, Ji-Yeon;Lim, Young-Wook
    • Proceedings of the Korea Society of Environmental Toocicology Conference
    • /
    • 2003.10a
    • /
    • pp.162-163
    • /
    • 2003
  • The Eco-2 Project presents a win-win strategy for the environment and for the economy (ECO-2 is an abbreviation of Ecology and Economy), The project was initiated by the Korean Ministry of the Environment to promote the development of an environmental industry technology as a means of driving national development in this sector. Our project work belongs to the category of integrated environment management technology, and is described as a development and utilization of risk assessment and analysis system for integrated environmental management in municipal and industrial areas. The goal of our project is to develop available system software in health and ecological risk assessment and to offer it as Decision Support System (DSS) to aid the effective management of environmental risk in municipal and industrial areas in Korea.

  • PDF

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

PBL Based Engineering Education to Cultivate Leadership Spirit in Postgraduate Students

  • Yokota, Kazutaka;Maruoka, Masatomo;Takaki, Junji;Watanabe, Shinichi
    • Journal of Engineering Education Research
    • /
    • v.15 no.5
    • /
    • pp.3-7
    • /
    • 2012
  • Utsunomiya University started a 3-year project to develop an education program for postgraduate students to cultivate leadership spirits. The program is centered on a PBL in which each group of students is required to find an engineering or social problem themselves and start a project to solve the problem. Projects vary widely, from a straight product development to a summer program for children or local area development. Student groups are advised by senior engineers from industries. They give advice as to how a project should be managed and run, but will not give instructions. The PBL is compulsory for all students in the engineering master course students. The new education program also includes a series of lectures by engineers to show engineers' job, activities, and career in the industry. Internship programs are also provided, in which students will be given opportunities to actively apply their knowledge and skills to real engineering tasks offered by the industry. The students are expected to gain something more than just experiences.

A Feasibility Study on the Research Infrastructure Project of System Semi-Conductor Industry (시스템 반도체산업 기반조성사업의 타당성 분석 연구)

  • Kim, Dae Ho
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.2
    • /
    • pp.87-95
    • /
    • 2014
  • The High-price development & testing tools and IP infratstructures are required for the development of system semi-conductors, but SMEs have not ability to prepare for them. Recently in terms of the miniaturization and the advancement of semiconductor process, the cost of the semi-conductor development have shown the rising tendency and the market-based design tools used are requied to be upgraded due to the advancement in the environment and technology. On the contray, many other contries such as Taiwan, Japan, China, and User are supporting this system semi-conductor industry. Korean government is trying to build the research infrastructure for system semi-conductor industry that aims to reduce the costs of the design infrastructure investment, to support the companies of system semi-conductor development and to incubate the fab-less start-ups. This study analyzes the feasibility of the project, by using the AHP analysis and the results shows that this project is considered feasible because the AHP overall score is evaluated as 0.840, the overall score is greater than or equal to 0.55.

  • PDF

A STUDY ON CULTURAL PRACTICES IN CONSTRUCTION CONTRACTING ORGANIZATIONS IN MALAYSIA

  • H. Abdul-Rahman;Wang Chen;Halimatun. Othman
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.169-178
    • /
    • 2007
  • This paper has investigated the cultural practices influencing business performance and integrity in selected Malaysian contractors and has discussed culture related issues to improve the management of cultural capitals in the Malaysian construction industry. Issues of current enterprise culture and applicable cultural practices, leadership styles, enterprise axiology and integrity, cultural practices and loyalty, and identification of organizational culture are discussed during the semi-structured interviews and questionnaire survey. Conclusions has been drawn that the people oriented and task oriented management style have a similar quantity of supporters in Malaysian contractors. The integrity and profit are respectively identified as the enterprise axiology in the ethical and economic perspective. The monkey culture is considered as the most applicable type for the cultural practice and the current enterprise cultures applied in the Malaysian contractors are mostly positive to both the organizations and society.

  • PDF

THE PRICE OF RISK IN CONSTRUCTION PROJECTS: CONTINGENCY APPROXIMATION MODEL (CAM)

  • S. Laryea;E. Badu;I. K. Dontwi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.106-118
    • /
    • 2007
  • Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and also help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

  • PDF