• Title/Summary/Keyword: index adjusted ration method

Search Result 3, Processing Time 0.019 seconds

Improvement contract sum adjustment method caused by price fluctuation (물가변동에 의한 계약금액 조정방안 개선 기초연구)

  • Cho Hun-Hee;Seo Jang-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

Improvement of contract sum adjustment method caused by price fluctuation using construction cost index (건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선)

  • Cho Hun-Hee;Doe Geun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.162-168
    • /
    • 2005
  • Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.

The Development of the Composite Index as a method of rate adjustment (의료보험수가 조정을 위한 복합지표 개발에 관한 연구)

  • 김한중;조우현;이해종
    • Health Policy and Management
    • /
    • v.3 no.1
    • /
    • pp.84-101
    • /
    • 1993
  • The current method of rate adjustment is based on the evaluation of the financial performance of hospitals. The method has the disadvantages such as too complicated, expensive process as well as low reliability due to small sample size. This study, therefore, develops a new model for the rate adjustment with the use of the composite index. In addition to that, it examines the validity of the model by comparing the result of the new method with that of the conventional method. The idea of the new model comes from the Medicare Economic Index(MEI) on which physician fees for the Medicare patients are adjusted periodically in the United States. Medical costs are classified into three groups : labor costs, materials and other expenses. Labor costs are subdivided into physicians and other personnels. Materials are subdivided into drugs and others. Other expenses are subdivided into 5 items. Macro economic indices are selected for each cost item in order to reflect the cost inflation during the specific period. Then the composite index which integrate all items according to the ration of each item in the total costs is calculated. The result from the application of empirical data to the new model is very similar to that of the current method. Furthermore, this method is very simple and also to easy to get social concensus. This model can be replaced the current method based on the analysis of the financial performance for the adjustment of medical fees.

  • PDF