• 제목/요약/키워드: horizontal tower crane

검색결과 7건 처리시간 0.022초

Optimization of Luffing-Tower Crane Location in Tall Building Construction

  • Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권4호
    • /
    • pp.7-11
    • /
    • 2015
  • The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. A newly developed mathematical formula is suggested to calculate the transportation time of luffing T/C correctly. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

Optimization of Luffing-Tower Crane Location in Tall Building Construction

  • Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.420-424
    • /
    • 2015
  • The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

  • PDF

수평형 타워크레인 텔레스코핑 작업의 자동화를 위한 개념 모델 및 요소기술 분석 (Analysis of Conceptual Models and State-of-the-Art Technologies for the Automation of Telescoping Work in Horizontal Tower Cranes)

  • 이상호;김영석;이정호
    • 대한토목학회논문집
    • /
    • 제31권5D호
    • /
    • pp.705-717
    • /
    • 2011
  • 타워크레인은 건설현장의 전체 자재인양 중 약 50%의 물량을 인양하는 양중 장비로 그 수는 빠른 속도로 증가하고 있으나, 건설현장에서의 소홀한 안전관리로 타워크레인 관련 안전사고는 매년 지속적으로 발생되고 있는 실정이다. 특히, 텔레스코핑 작업은 타워크레인 설치단계에서 텔레스코핑 케이지를 유압으로 상승시킨 후 생긴 빈 공간에 새로운 마스트를 삽입하여 요구 높이까지 상승시키는 작업으로 고소에서 다수의 작업자가 동시에 작업을 실시하여 추락 및 낙하의 위험성이 존재하는 등 타 작업에 비해 재해사례 비중이 가장 높은 것으로 분석되었다. 본 연구의 목적은 타워크레인 작업 중 특히 위험성이 높은 것으로 조사 및 분석된 텔레스코핑 작업의 안전성 및 생산성을 향상시킬 수 있는 타워크레인 텔레스코핑 자동화기술의 개념모델을 제안하고 이에 대한 안전성 측면에서의 잠재적 성능을 분석함으로써 향후 타워크레인 텔레스코핑 자동화기술 실물 제작을 위한 원천자료를 제공하는 것이다.

Analytical method for the out-of-plane buckling of the jib system with middle strut

  • Wang, T.F.;Lu, N.L.;Lan, P.
    • Steel and Composite Structures
    • /
    • 제21권5호
    • /
    • pp.963-980
    • /
    • 2016
  • The jib system with middle strut is widely used to achieve the large arm length in the large scale tower crane and the deployability in the mobile construction crane. In this paper, an analytical solution for the out-of-plane buckling of the jib system with middle strut is proposed. To obtain the analytical expression of the buckling characteristic equation, the method of differential equation was adopted by establishing the bending and torsional differential equation of the jib system under the instability critical state. Compared with the numerical solutions of the finite element software ANSYS, the analytical results in this work agree well with them. Therefore, the correctness of the results in this work can be confirmed. Then the influences of the lateral stiffness of the cable fixed joint, the dip angle of the strut, the inertia moment of the strut, and the horizontal position of the cable fixed joint on the out-of-plane buckling behavior of the jib system were investigated.

건축용 타워크레인 마스트의 횡방향 지지요소인 월타이 부재력 특성곡선 (Wall Tie Member Force Curve for the Construction Tower Crane)

  • 고광일;오우훈;이은택
    • 한국강구조학회 논문집
    • /
    • 제18권6호
    • /
    • pp.697-706
    • /
    • 2006
  • 타워크레인의 횡방향 지지와 마스트의 횡강성 및 강도를 확보하기 위하여 횡하중 저항요소로서 사용되는 것이 월타이(wall tie)이다. 본 연구에서는 국내에서 가장 많이 사용되고 있는 독일 립헬사의 T형 타워크레인(기종 290HC, 작업반경: 70m, 인양하중: 12tf)을 대상으로 하고 마스트 및 월타이의 사용부재는 H형강보 구조의 구조물을 모델로 선정하여 월타이의 부재력, 월타이의 각도변화 및 각도범위에 따른 부재력의 변화를 분석하여, 실용적이고 안전한 월타이의 각도범위를 제안하여 현장기술자가 최적의 월타이를 배치할 수 있도록 하였다. 본 연구를 통하여 건축용 타워크레인의 훅크양정을 증대시키기 위하여 설치되는 횡방향지지요소인 월타이의 부재력 계산식을 구하고, 이를 프로그래밍하여 마스트 중심과 월타이 브라켓 간 거리를 변화시키면서, 월타이 각도별 월타이 부재력을 반복계산하여 월타이 부재력 특성곡선을 그리고 이를 분석하였다.

전용 양중틀을 활용한 초고층 건물의 슈퍼블럭 유닛 커튼월 시공 (Construction of Super-block Unit Curtain Wall for High-rise Buildings Utilizing a Specialized Installing Equipment)

  • 정삼룡;이상헌;옥영무
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.174-181
    • /
    • 2004
  • 국내 최고 높이를 자랑하는 초고층 건물인 타워팰리스 III에 적용된 슈퍼블럭 유닛 커튼월 시공 공법에 대해서 소개한다. 타워팰리스 III는 공기 단축을 위하여, 벨트월 구간의 외주 커튼월을 별도로 후시공하는 Up-Up 공법을 적용하였다. 벨트월 구간의 커튼월을 후시공하는 과정에서 3개층 분량에 해당되는 대형의 커튼월 블럭을 지상에서 선조립한 후에, 타워크레인을 사용하여 한 번에 시공하는 슈퍼블럭 유닛 커튼월 공법을 개발하고 적용하였다. 이 공법의 실현을 위하여 전용의 양중틀을 개발하여 활용하였고, 슈퍼블럭 유닛 커튼월의 시공을 위하여 비워둔 벨트월 상부층의 커튼월을 시공하기 위한 역시공 장비를 개발 적용하였다. 이러한 신공법의 적용을 통하여, 커튼월 시공용 가설 비계의 설치를 생략하였으며, 공기단축과 경비 절감과 같은 경제적 효과 외에도, 안전 확보와 생산성 향상 등의 효과를 얻을 수 있었다.

  • PDF

Rotation-Up 공법에 의한 킬 트러스 대공간 구조물의 Erection 실험에 관한 연구 (Experimental Investigation of Rotation-Up Erection for Keel Truss Spatial Structures)

  • 김철환;채원탁;백기열;정환목
    • 한국공간구조학회논문집
    • /
    • 제13권2호
    • /
    • pp.57-66
    • /
    • 2013
  • There are a number of construction methods to build spatial structures such as erection method, Element method, Block method, Sliding method, Lift-up method and Push-up method. These methods are uneconomical and low accuracy, and require long construction duration because of a need of a scaffold or a tower crane to build spatial roof frame. In this study, the construction method to erect a truss structure was proposed as an economical and easy installation method. The proposed method has end hinges of keel truss and winches with horizontal cable. This method makes safe and accurate production and reduces construction duration because trusses are built on the floor or supporter. The goal of this study is to verify the validity of construction method by building scale model using the proposed method.