Optimization of Luffing-Tower Crane Location in Tall Building Construction

  • Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.7-11
    • /
    • 2015
  • The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. A newly developed mathematical formula is suggested to calculate the transportation time of luffing T/C correctly. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

Optimization of Luffing-Tower Crane Location in Tall Building Construction

  • Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.420-424
    • /
    • 2015
  • The luffing-tower crane (T/C) is a key facility used in the vertical and horizontal transportation of materials in a tall building construction. Locating the crane in an optimal position is an essential task in the initial stages of construction planning. This paper proposes a new optimization model to locate the luffing T/C in the optimal position to minimize the transportation time. An optimization algorithm, the Harmony Search (HS) algorithm, was used and the results show that HS has high performance characteristics to solve the optimization problem in a short period of time. In a case study, the proposed model offered a better position for T/C than the previous heuristic approach.

  • PDF

Analysis of Conceptual Models and State-of-the-Art Technologies for the Automation of Telescoping Work in Horizontal Tower Cranes (수평형 타워크레인 텔레스코핑 작업의 자동화를 위한 개념 모델 및 요소기술 분석)

  • Lee, Sang-Ho;Kim, Young-Suk;Lee, Jeong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.705-717
    • /
    • 2011
  • The number of horizontal tower cranes, major hoisting machineries for lifting approximately 50% of entire materials in construction projects, is rapidly increasing, but a number of accidents related to the tower cranes are being continuously occurred in construction sites as well. In particular, telescoping works in the horizontal tower cranes have showed the greatest safety concerns such as falls and collapses. It is due to the fact that tasks inserting a new mast in the space made after raising telescoping cage by fluid pressure and ascending it to the required height in the telescoping works include a series of dangerous factors in safety aspects, and might cause very serious and unexpected accidents in construction sites. The primary objective of this research is to propose two conceptual models for automating the telescoping work in horizontal tower crane and conduct their technical feasibility analyses. In this study, a design concept, a position control system using hydraulic cylinders is suggested as a better alternative for automating the telescoping work. Its potential safety improvement rate compared to the conventional method is also analyzed and presented in this study.

Analytical method for the out-of-plane buckling of the jib system with middle strut

  • Wang, T.F.;Lu, N.L.;Lan, P.
    • Steel and Composite Structures
    • /
    • v.21 no.5
    • /
    • pp.963-980
    • /
    • 2016
  • The jib system with middle strut is widely used to achieve the large arm length in the large scale tower crane and the deployability in the mobile construction crane. In this paper, an analytical solution for the out-of-plane buckling of the jib system with middle strut is proposed. To obtain the analytical expression of the buckling characteristic equation, the method of differential equation was adopted by establishing the bending and torsional differential equation of the jib system under the instability critical state. Compared with the numerical solutions of the finite element software ANSYS, the analytical results in this work agree well with them. Therefore, the correctness of the results in this work can be confirmed. Then the influences of the lateral stiffness of the cable fixed joint, the dip angle of the strut, the inertia moment of the strut, and the horizontal position of the cable fixed joint on the out-of-plane buckling behavior of the jib system were investigated.

Wall Tie Member Force Curve for the Construction Tower Crane (건축용 타워크레인 마스트의 횡방향 지지요소인 월타이 부재력 특성곡선)

  • Ko, Kwang IL;Oh, W.H.;Lee, E.T.
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.697-706
    • /
    • 2006
  • Tower crane's wall tie is generally used for extending of mast height according to rising of lifting height. In order to get wall tie member force this problem, this study concerning wall tie is based on load data described in manual book of 290HC model. This study made the equation of wall tie member force and computer programming for calculating wall tie member force and then get ${\theta}-P$ curves(angle-wall tie force). After considering the ${\theta}-P$ curves, optimum angle range ($48.4^{\circ}{\sim}77.2^{\circ}$) about wall ties (A), (C) members was obtained. Member force of wall tie (B) was changed from tension to compression or from compression to tension at $74^{\circ}$ in service and $54^{\circ}$ in out of service. When both horizontal force($H_A$) and torsional moment ($M_D$) were varied from (+) to (-), wall tie force(A, B, C) were changed almost symmetrically about ${\theta}$-axis. Because this study was based on wall tie analysis conditions, wall tie members in symmetric and ideal geometry shape used for analizing wall tie of tower crane, it is necessary to have more careful verification in order to apply generally the results of this study.

Construction of Super-block Unit Curtain Wall for High-rise Buildings Utilizing a Specialized Installing Equipment (전용 양중틀을 활용한 초고층 건물의 슈퍼블럭 유닛 커튼월 시공)

  • Chung, Sam-Yong;Lee, Sang-Heon;Ohk, Young-Mu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.174-181
    • /
    • 2004
  • We will introduce a method of construction of super-block curtain wall applied to Tower Palace III which is the highest high-rise complex building in Korea. Up-up method is utilized on Tower Palace III to shorten the term of works and it is that the curtain walls for the belt wall part are installed after the rests. The belt wall structure increases the horizontal structural stiffness of the building. The method of construction of super-block curtain wall is developed and used to raise and install the curtain wails of the belt wall floor. It is that the large block of curtain walls corresponding to three stories is fabricated on the ground in advance and the block is installed at a time by a tower crane. Specialized installing equipment :,s newly developed and applied to install the super-block. curtain wail. The curtain wall of the upper floor of the belt wall part is installed after the super-block. The installing equipment for this floor is developed utilizing a mini excavator and vacuum suctions. The application of this method had made it possible to omit the setting up the scaffold and financial profits such as the shortening of the terms of works was realized. The safety of works was secured and the productivity was also improved.

  • PDF

Experimental Investigation of Rotation-Up Erection for Keel Truss Spatial Structures (Rotation-Up 공법에 의한 킬 트러스 대공간 구조물의 Erection 실험에 관한 연구)

  • Kim, Cheol-Hwan;Chae, Won-Tak;Baek, Ki-Youl;Jung, Hwan-Mok
    • Journal of Korean Association for Spatial Structures
    • /
    • v.13 no.2
    • /
    • pp.57-66
    • /
    • 2013
  • There are a number of construction methods to build spatial structures such as erection method, Element method, Block method, Sliding method, Lift-up method and Push-up method. These methods are uneconomical and low accuracy, and require long construction duration because of a need of a scaffold or a tower crane to build spatial roof frame. In this study, the construction method to erect a truss structure was proposed as an economical and easy installation method. The proposed method has end hinges of keel truss and winches with horizontal cable. This method makes safe and accurate production and reduces construction duration because trusses are built on the floor or supporter. The goal of this study is to verify the validity of construction method by building scale model using the proposed method.