• 제목/요약/키워드: highway project

검색결과 200건 처리시간 0.028초

고속도로 건설이 지역경제에 미치는 기여도 분석연구: 강일~춘천 고속도로 (Impact of Highway Construction on the Regional Economy: Gangil-Chuncheon Highway)

  • 나성용;이두헌;김현우
    • 한국산업융합학회 논문집
    • /
    • 제25권6_3호
    • /
    • pp.1183-1190
    • /
    • 2022
  • Recently, the Ministry of Strategy and Finance announced a plan to reduce the proportion of economic evaluation in non-metropolitan areas and strengthen balanced development evaluation through the reorganization of the preliminary feasibility study system. In addition, the social value of the quality of life, such as job, environment, and safety, which may be affected by the implementation of transportation facility investment projects, was reflected as the main item of policy evaluation. In this study, the ripple effect of the project in terms of social value was reviewed for the Gangil-Chuncheon. The effect of highway opening was investigated by reviewing the feasibility report, post-evaluation report, and statistical indicators. Recently, the Gangil-Chuncheon highway is getting used by around 110,000 people per day. The number of tourists in Chuncheon rapidly has increased from 5 million a year to more than 11 million now. In addition, it was confirmed to produce effects such as population migration, net inflow and land price increase, improvement of living convenience, and expansion of emergency medical care. Although this ripple effect was influenced by various socio-economic factors as well as the opening of the highway, it is clear that it is difficult to occur without the opening of the highway. It is judged that the evaluation of indirect benefits and social values due to the opening of the highway can be quantified through continuous research and data construction. Post-evaluation of construction works, including project efficiency evaluation and ripple effect evaluation, is performed for construction works with a construction cost of more than 50 billion won. In the future, we will continuously improve the evaluation system in order to evaluate the indirect benefits and social values of public investment projects.

Introduction of PCC Pavement Sections and Associated Research in KHC Test Road

  • Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.197-203
    • /
    • 2003
  • Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.

  • PDF

AN ASSET MANAGEMENT ASSESSMENT MODEL FOR STATE DOTs

  • Steven Cooksey;Hyung Seok David Jeong;Myung-Jin Chae
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.380-387
    • /
    • 2009
  • In the past, many state Departments of Transportation (DOTs) in the U.S. managed their highway assets on a "worst first" basis and planned their highway projects in a tactical rather than strategic fashion. Due to increasingly tight highway budgets and recognition of long term benefits of asset management systems, the Federal Highway Administration (FHWA) has strongly pushed and encouraged state DOTs to implement asset management for managing their highway assets and highway projects. Currently, many DOTs have actively implemented and are in the process of applying this asset management concept for their highway infrastructure. However, different DOTs are developing different asset management systems because of their different organizational structures, data management structures, relationship with the legislature, and investment priorities. This study first identifies asset management indicators which are essential to successfully implementing asset management systems for State highway assets. The research team conducted a survey of asset management experts and reviewed the practices and policies of leading DOTs in asset management. Based on these indicators, this study develops an Asset Management Assessment Model (AM2) for different asset management systems. This model can be used by different DOTs to evaluate their current asset management systems and identify their strong areas and also their weak areas to improve in order to fully benefit from the advanced concept of asset management.

  • PDF

USING QUANTITY ESTIMATE STATISTICAL MODELS FOR INFRASTRUCTURE LONG RANGE COST MANAGEMENT

  • Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.808-813
    • /
    • 2005
  • Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.

  • PDF

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권4호
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

스마트하이웨이 무선전송기술: 요구사항 및 기본시험결과 (Wireless Access Technologies for Smart Highway: Requirements and Preliminary Results)

  • 조웅;오현서;박병주
    • 한국인터넷방송통신학회논문지
    • /
    • 제11권2호
    • /
    • pp.237-244
    • /
    • 2011
  • 차량통신은 통신기술과 도로/자동차기술을 융합함으로써 응용분야를 확장해왔으며, 여러 응용분야 중 중요한 한 가지가 스마트하이웨이 프로젝트이다. 스마트하이웨이는 현재의 고속도로 시스템에서 정시성, 안전성 및 편의성을 향상시킨 진보된 차세대 고속도로이다. 본 논문에서는 차량통신을 위한 무선전송기술을 스마트하이웨이에 중점을 두고 소개한다. 먼저 전제적인 통신시스템의 구조 및 기본적인 서비스/통신 요구사항에 대해 소개한 후 L2레벨 핸드오버 및 무선전송기술에 대해 논의한다. 마지막으로 WAVE시스템을 이용한 기본시험결과에 대해서도 소개한다.

Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

사례분석을 통한 도로설계속도 결정방법론 적용성 평가 (기능 재분류와 지형특성 이용) (Evaluation of The Highway Design Speed Determination Process Using Case Studies (Reclassifying Functions and Terrain Types))

  • 심관보;최재성
    • 대한교통학회지
    • /
    • 제24권2호
    • /
    • pp.101-112
    • /
    • 2006
  • 현재 우리나라의 설계속도는 토로의 기능, 지역특성, 지형에 의해 결정된다. 그러나 도로의 기능을 구분하는 뚜렷한 기준이 없어 적정 설계속도 결정에 설계자의 주관이 개입될 여지가 많으며, 설계에 반영되지 못하는 도로기능이 존재하고, 도로가 통과하는 지역 및 지형적 특성을 제대로 반영하지 못하는 실정이다. 최근 이 문제를 개선한 새로운 기능 재분류와 설계속도 결정기준이 제시된 바 있다. 본 연구에서는 최근 제시된 새로운 설계속도 결정기준에 따라 토로를 재설계하고, 통행속도와 공사비, 안전성 등을 조사 분석하여 기존 방법과 새로운 방법이 어떠한 차이가 있는지 사례분석을 통해 적용성을 평가하였다. 연구 결과 설계속도 결정에 있어 새로운 기준이 기존방법에 비해 우리나라의 자연지형과 지역특성을 정확히 고려하였으며, 설계자의 주관적 판단소지를 크게 줄여주고. 경제적인 방법으로 설계속도와 노선대를 결정하는 것으로 나타났다. 또한 새로운 기준에 따른 설계가 기존방법에 비해 편익은 약간 적었으나. 공사비가 크게 감소하여 B/C분석. NPV, IRR 에서 모두 우수한 것으로 나타났다. EMME/2 상에서 통행배정 결과 각 구간 LOS는 기존방법과 새로운 방법이 거의 차이가 나지 않았으며. 통행속도에서 약 $2{\sim}4km/h$의 미세한 차이가 있었다.

도로관리통합시스템을 위한 도로영상 데이터베이스 구축 방안 (Construction Strategy of Road Imagery Database for the Highway Management System)

  • 정동훈;성정곤
    • Spatial Information Research
    • /
    • 제14권1호
    • /
    • pp.1-13
    • /
    • 2006
  • 한국건설기술연구원에서는 기존의 도로현황을 더욱 빠르고 정확하게 파악하기 위해 전국의 일반국도에 대해 매 10m 간격으로 2매의 고해상도의 칼라 영상을 취득하고 이를 도로관리통합시스템에 제공하는 사업을 수행하고 있다. 현재는 경기, 강원, 충청지역의 일반국도 영상을 도로관리통합시스템에서 제공하고 있으며 2006년 상반기까지 전국으로 확대할 계획이다. 본 논문에서는 취득한 위치자료와 영상자료를 일대일로 매칭하거나 노선별로 취득한 자료를 국도유지건설사무소별로 재구성하는 것과 같이 도로영상수집차량을 이용하여 수집한 영상을 데이터베이스화하는 전 과정에 대해 기술하였다.

  • PDF

발주자 관점의 생산적인 건설 프로젝트와 영향요소의 분석에 관한 연구 - 고속도로 건설사업을 대상으로 - (A Study on Analysis of Productive Construction Project and Influential Elements for Public Owner's Perspective - Focused on Highway Construction -)

  • 우성권;이영환;장철기;이시욱
    • 대한토목학회논문집
    • /
    • 제32권6D호
    • /
    • pp.645-653
    • /
    • 2012
  • 고속도로 건설공사의 경우 기존에 건설된 고속도로에 대한 유지관리비가 증가하고 있어 신규 건설에 필요한 투자비에 대한 효율성의 혁신 및 프로젝트의 품질을 향상시키기 위한 생산성 관리가 필요한 시점이지만, 아직까지 고속도로 건설공사에 대한 생산성 및 성과 측정에 대한 명확한 기준이나 방법, 필요성이 제대로 정립되지 못하고 있는 실정이다. 이에 본 연구는 발주자의 주요 업무인 사업관리 측면에서 생산적 프로젝트의 5가지 주요 구성 요소를 정의하였다. 그리고 생산성에 주요한 영향을 미치는 43개 생산성 영향요소를 정의하고 이들을 세 개의 레벨로 구성된 위계체계로 정의하였다. 또한 고속도로 건설공사의 최대 발주자인 한국도로공사를 대상으로 설문조사를 수행하여 정의된 생산성 영향요소들이 생산적 프로젝트의 달성에 미치는 영향 정도를 파악하고 개선수요 정도를 파악함으로써, 사업의 성공적인 수행을 위하여 중점적으로 관리하여야 할 영향요소를 제시하였다.