Browse > Article

Evaluation of The Highway Design Speed Determination Process Using Case Studies (Reclassifying Functions and Terrain Types)  

Sim, Gwan-Bo (도로교통안전관리공단)
Choe, Jae-Seong (서울시립대학교 교통공학과)
Publication Information
Journal of Korean Society of Transportation / v.24, no.2, 2006 , pp. 101-112 More about this Journal
Abstract
Currently, highway design speed is determined by considering highway function, area type, and terrain type. Sometime it is pointed out that determining a reasonable design speed which is both efficient and safe is not an easy task and that Practicing engineers often select an unsuitable design speed on purpose, capitalizing on some ambiguous and discretionary expressions in describing the highway design speed. This undesirable Problem is arising mostly due to the fact, that the current geometric design standard fails to include rolling terrain type and can not reflect the whole characteristics of land use patterns adjacent to the design highway route. A recent research was Published considering this problem and it attempted to improve the highway design speed determining process. In this research Project, tn see the effects of this recently developed procedure, a new and reduced design speed was calculated based on the new Procedure and subsequently another highway design route was selected. The travel time. construction cost. and the expected degree of safety associated with the new route were assessed to be compared with the ones with the existing procedure. As a result. it was found that the new procedure was successful in reflecting the localities such as terrain type and area type into better determining highway design speed, eliminating much of highway engineers' discretion when applying engineering judgments. Also the new Procedure is keen to produce a more economical highway project. In other words, despite of producing reduced amount of user benefits accrued, in the new highway route, the construction cost has been cut significantly leading to higher values in B/C. NPV, and IRR. Also EMME-II output, which Provided the link assigned volumes, rendered only a slightly reduced Levels of Service along surrounding links in the study network. This reduction was believed to occur because of lower design speed and it had been expected from the beginning.
Keywords
설계속도;기능분류;지형구분;지역구분;경제성분석;
Citations & Related Records
연도 인용수 순위
  • Reference
1 심관보.최재성(2005), '기능재분류와 지형특성을 고려한 설계속도 적정화방안', 대한교통학회지, 제 23권 제6호, 대한교통학회, pp.7-18
2 건설교통부(1992), 죽산-양지간 도로확장 및 포장공사 실시설계 종합보고서
3 한국개발연구원(2001), 도로부문사업의 예비타당 성조사 표준지침 연구(제3판)
4 Neuman, T. R., et. al,(2002), 'A Guide to Best Practices for Achieving Context Sensitive Solutions', NCHRP Report 480, TRB, National Research Council, Washington, D.C., pp.45- 70
5 AASHTO(2001), A Policy on Geometric Design of Highways and Streets, Washington, D.C
6 Krammes, R. A.(2000), 'Design Speed and Operating Speed in Rural Highway Alignment Design' In Transpotation Research Record 1701, TRB, National Research Council, Washington, D.C., pp.68-75   DOI
7 한국개발연구원(2002), 공공투자사업의 예산관리 의 효율화 방안(II), 국도건설비합리화 방안
8 FHWA(2001), 'Geometric Design Practices for European Roads', U.S. Dept. of Transportation, Washington, D.C, p.1
9 최재성(2004), '국도확장사업을 위한 적정 도로설계 방안 연구', 교통정책연구, 제11권, 제1호, 교 통개발연구원, pp.51-69
10 Garrick, N. W.(2000), 'Street Design and Com-munity Livability', Proceeding of Urban Transportation 2000, Connecticut Transpotation Institute, USA
11 심관보(2005), '기능재분류와 GIS-T를 이용한 도로 설계속도 적정화 방안', 서울시립대 박사학위논문
12 Fitzpatrick, K., Carlson, P. J.(2002), 'Selection of Design Speed Values', In Transpotation Research Record 1796, TRB, National Research Council, Washington, D.C., pp.3-11   DOI
13 Fambro, D.B., et. al.(1997), 'Determination of Stopping Sight Distances', NCHRP Report 400, TRB, National Research Council, Washington, D.C