• 제목/요약/키워드: highway project

검색결과 200건 처리시간 0.025초

Detecting Red-Flag Bidding Patterns in Low-Bid Procurement for Highway Projects with Pattern Mining

  • Le, Chau;Nguyen, Trang;Le, Tuyen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.11-17
    • /
    • 2022
  • Design-bid-build (DBB) is the most common project delivery method among highway projects. State Highway Agencies (SHAs) usually apply a low-bid approach to select contractors for their DBB projects. In this approach, the Federal Highway Agency suggests SHAs heighten contractors' competition to lower bid prices. However, these attempts may become ineffective due to collusive bidding arrangements among certain contractors. One common strategy is the rotation of winning bidders of a group of contractors who bid on many of the same projects. These arrangements may also be specific to a particular region or vary in time. Despite the practices' adverse effects on bidding outcomes, an effective model to detect red-flag bidding patterns is lacking. This study fills the gap by proposing a novel framework that utilizes pattern mining techniques and statistical tests for unusual pattern detection. A case study with historical data from an SHA is conducted to illustrate the proposed framework.

  • PDF

A Study on Innovative Design Approaches for Implementing an Intelligent ICT-Based Smart Highway

  • Bong shik Yun;Myong yun Kim
    • 스마트미디어저널
    • /
    • 제13권3호
    • /
    • pp.62-73
    • /
    • 2024
  • This research, conducted over a three-year period starting from 2020, was a collaborative project between practitioners in the field of VE design and the Korea Expressway Corporation, aimed at innovating the design VE project to construct an intelligent ICT-based smart highway and enhancing highway driving performance and customer satisfaction. The research included R&D support for payment and management systems integrated with IOT technology, the application of the developed prototype at highway sites, and analysis of user performance evaluation. Based on the Innovation Work Roadmap of the Korea Expressway Corporation, the research process involved collaboration between a public participation group and an expert group, considering the technical feasibility of data-based ICT technology through the National Idea VE Contest. The final VE design results were implemented at the Seongnam tollgate site with budget support from relevant departments, followed by a satisfaction survey. It is expected that the continuous contributions to achieving an ESG society, such as the increase in the number of customers using the tolling zone equipped with smart upgrades, along with their satisfaction rate, and the reduction in carbon emissions and total settlement time of highway users, will be sustained.

국내 건설공사 3D 및 4D CAD 적용사례로 본 현황분석 (A Case Study of 3D and 4D CAD Application for the Domestic Construction Project)

  • 지상복;강인석;권중희;문진석;백상민
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.120-125
    • /
    • 2008
  • The purpose of this case study is to find out current issue and improvement directions of the application of 3D and 4D to the construction project including building, highway and railway projects. For the study, the main functions of the 3D and 4D simulation of current system are analyzed and proposed improvement directions for 3D CAD utilization in 4D environment. Case studies of CAD application include land development for housing complex, highway project and express railway project.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

Current Practices of Collecting and Utilizing Daily Work Report Data and Areas for Improvements

  • Shrestha, K. Joseph;Jeong, H. David;Gransberg, Douglas D.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.205-209
    • /
    • 2015
  • A significant amount of data including ongoing construction activities, work quantities, resources utilized by contractors, and site conditions is collected in highway construction sites on a daily basis by resident engineers. This data is commonly known as daily work reports (DWRs) in the U.S. Although a lot of time and effort is invested in collecting the DWR data, its utilization has been very limited. This paper discusses current practices of collecting and utilizing DWR data among various Departments of Transportation in the U.S., and discusses the challenges and opportunities for better collection and utilization of the data. An extensive literature review and two nationwide surveys in the U.S. were conducted as a part of this study. Finally, it provides a set of recommendations to effectively address the challenges identified and maximize the benefits of utilizing DWR data such as supporting various decisions for highway project development process. The findings of this study are implementable ideas that can aid DOTs in making data-driven decisions throughout the project development processes in the future.

  • PDF

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

Sources of Cost Saving Opportunities in Highway Construction Quality Assurance Practices

  • Uddin, Mohammad Moin;Newland, James
    • Journal of Construction Engineering and Project Management
    • /
    • 제8권1호
    • /
    • pp.1-9
    • /
    • 2018
  • US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

성능보증제도를 적용한 일반국도 유지보수공사 시범사업 (Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance)

  • 임재규;김용주;김명일;이재준
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

고속도로 건설사업의 재정/민자 발주선택 의사결정 지원모델 (Decision Support Model for Determining Public or Private Highway Investment Projects)

  • 여동훈;정우용;한승헌;이영천
    • 대한토목학회논문집
    • /
    • 제29권3D호
    • /
    • pp.381-389
    • /
    • 2009
  • 2007년 기준으로 정부는 18.4조원을 사회기반시설에 투자하고 있으며, 이 중 16.3%에 해당되는 3조원을 민간투자 사업에 집행하고 있다. 이는 인프라 시설에 대한 국민적인 요구를 충족시킴과 동시에 재정부담을 경감하고 사업 추진시 위험을 축소시키기 위한 것이다. 하지만 현재 국가 인프라 사업은 기획단계에서 재정사업 또는 민자사업으로 결정하는 체계적인 기준이나 지침이 없이 주로 재정 상태를 고려한 주무관청의 자체판단에 따라 사업추진 방식이 결정되고 있다. 또한 초기에 재정 사업으로 추진되는 경우에도, 사업타당성 조사를 실시하는 과정에서 민자사업으로서의 가능성은제대로 평가되지 않는 상황이다. 따라서 본 연구는 국가 인프라사업에 대하여 재정사업과 민자사업을 선택하는 합리적인 발주기준을 제시하는 것을 목표로 한다. 이를 위하여 고속도로 사업을 중심으로 재정 민자 의사결정 기준을 경제성, 정책성, 사업관리 항목으로 나누고 이를 바탕으로 재정 민자 의사결정 모델을 제시하였다. 본 연구에서는 의사결정 모델을 구축하기 위해 30건의 재정 및 민자사업 실제 사례를 분석하고 102건의 전문가 설문을 실시하였다. 본 모델은 크게 두 단계로 구분되는데, 첫째 경제성 평가는 평균 및 표준편차 분석을 통해 민자불가, 재정민자 양측가능 및 재정불가 구간을 제시하였으며, 둘째 정책성 평가와 사업관리 평가는 로지스틱 회귀분석을 실시함으로써 재정 또는 민자사업의 추진여부를 구분 짓는 예측식을 도출하였다. 본 연구의 결과를 통해 고속도로 사업의 기획단계에 참여하는 의사결정자는 고려중인 사업의 재정 민자사업 결정시 보다 체계적이고 합리적인 사업발주방식을 결정할 수 있을 것으로 사료된다.