• Title/Summary/Keyword: high-pier

Search Result 120, Processing Time 0.044 seconds

Reliability of mortar filling layer void length in in-service ballastless track-bridge system of HSR

  • Binbin He;Sheng Wen;Yulin Feng;Lizhong Jiang;Wangbao Zhou
    • Steel and Composite Structures
    • /
    • v.47 no.1
    • /
    • pp.91-102
    • /
    • 2023
  • To study the evaluation standard and control limit of mortar filling layer void length, in this paper, the train sub-model was developed by MATLAB and the track-bridge sub-model considering the mortar filling layer void was established by ANSYS. The two sub-models were assembled into a train-track-bridge coupling dynamic model through the wheel-rail contact relationship, and the validity was corroborated by the coupling dynamic model with the literature model. Considering the randomness of fastening stiffness, mortar elastic modulus, length of mortar filling layer void, and pier settlement, the test points were designed by the Box-Behnken method based on Design-Expert software. The coupled dynamic model was calculated, and the support vector regression (SVR) nonlinear mapping model of the wheel-rail system was established. The learning, prediction, and verification were carried out. Finally, the reliable probability of the amplification coefficient distribution of the response index of the train and structure in different ranges was obtained based on the SVR nonlinear mapping model and Latin hypercube sampling method. The limit of the length of the mortar filling layer void was, thus, obtained. The results show that the SVR nonlinear mapping model developed in this paper has a high fitting accuracy of 0.993, and the computational efficiency is significantly improved by 99.86%. It can be used to calculate the dynamic response of the wheel-rail system. The length of the mortar filling layer void significantly affects the wheel-rail vertical force, wheel weight load reduction ratio, rail vertical displacement, and track plate vertical displacement. The dynamic response of the track structure has a more significant effect on the limit value of the length of the mortar filling layer void than the dynamic response of the vehicle, and the rail vertical displacement is the most obvious. At 250 km/h - 350 km/h train running speed, the limit values of grade I, II, and III of the lengths of the mortar filling layer void are 3.932 m, 4.337 m, and 4.766 m, respectively. The results can provide some reference for the long-term service performance reliability of the ballastless track-bridge system of HRS.

A Study on the Sensitivity Analysis of Ship Mooring Evaluation Factors According to Sea Level Rise in Mokpo Port (목포항 해수면 상승에 따른 선박 계류평가요소의 민감도 분석 연구)

  • Seungyeon Kim
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.5
    • /
    • pp.445-455
    • /
    • 2023
  • Sea level rise due to global warming is accelerating. According to the IPCC survey, the expected sea level rise in 2100 was analyzed to be 47cm in the low-carbon scenario (SSP 1-2.6) and 82cm in the high-carbon scenario (SSP 5-8.5). Sea level rise can cause serious damage to port infrastructure and reduce the safety of ships docked inside ports. In this study, Mokpo Port, which frequently suffers from flooding during high tide, was selected and the sensitivity of mooring evaluation factors was analyzed for actual berthing ships according to sea level rise scenarios. From the analysis, we found that the tension of mooring line, the load of bollard, vertical angle of mooring line, and ship's motion of 6-DOF, which are evaluation factors, generally increased when the sea level increased. The most sensitive evaluation factor was sway motion of 6-DOF. Also, we analyzed that the value of mooring evaluation factors decreased when the crown height was raised. This was beneficial in improving ship and pier safety. The results of this study can be used as basic data to secure measures to improve port and ship safety according to sea level rise in Mokpo Port.

The Analysis and Field Measurement of Longitudinal Track Forces for Long Railroad Bridges (교량상 궤도축력의 해석 및 실측결과 비교)

  • Kang, Kee Dong;Park, Jong Bang;Kim, In Jae;Park, Dae Geun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.907-913
    • /
    • 1994
  • The design of railroad bridges differs from road bridges because of the interface between track structure and bridge structure. The track generally consists of Continuous Welded Rail(CWR) which is fixed by fasteners to the sleepers embedded in the ballast. The ballast provides the interface between the track structure and the bridge structure. Large longitudinal forces can develop from the temperature variation in rail and bridge structure. These longitudinal forces are specially important for long bridges because the bridge layout for span length, pier dimensions and arrangement and type of bearings can be governed by these forces. This report provides a comparison of longitudinal track forces determined by analysis and actual measured track forces. In recent practice the longitudinal track force for European railways is analyzed using a finite element analysis method. This method is very time-consuming and requires the detail design of the bridge to be complete. Redesign is required if the design criteria for longitudinal track forces are not satisfied. There is a need to develop a simple analysis method considering the large number of bridge structures and a relatively short design time on the Korean High Speed Rail Project. The analysis results presented herein, based on a simplified analysis, show good agreement with those obtained by finite element analysis, as well as with those measured on an actual track. The proposed analysis method is particularly useful for the preliminary design of bridge structures.

  • PDF

Seismic Performance Evaluation of RC Bridge Piers with Limited Ductility by the Pseudo-Dynamic Test (한정연성 철근콘크리트 교각의 유사동적 실험에 의한 내진 성능 평가)

  • Chung, Young-Soo;Park, Chang-Kyu;Park, Jin-Young
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.5
    • /
    • pp.705-714
    • /
    • 2003
  • Even though Korean peninsula is located in regions of moderate seismic risks, current seismic design provisions of the roadway bridge design code have adopted the AASHTO code which is based on the requirements for high seismic regions. The objective of this research is to investigate the seismic performance of circular reinforced concrete (RC) bridge piers with limited ductility, which may be desirable in low or moderate seismic regions, such as in Korea. Four test specimens were designed and constructed. The reference specimen was designed with longitudinal steel ratio as 1.01% and the confinement reinforcement ratio as 0.13% without considering earthquake, and three other test specimens were designed in accordance with a limited-ductility concept as 0.3% for the confinement steel ratio. This confinement ratio is 0.32 times of minimum lateral reinforcement specified in current seismic design provisions, and 2.3 times of lateral reinforcement required in nonseismic design provisions. The pseudo-dynamic test was carried out to evaluate the seismic performance of full-scale specimens in size of 1.2m diameter and 4.8m height. Judging from the experiment, the reference specimen was not satisfactory for the demand displacement ductility ${\mu}$=5.0, but three limited-ductility specimens appeared to have the displacement ductility of more than 5.

Influences of Grouting Pressure of Microcement to Upper Structures (지반보강용 마이크로시멘트의 주입압이 상부구조물에 미치는 영향)

  • Hwang, Chul-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.70-77
    • /
    • 2010
  • Microcement grouting and micro pile are frequently used for ground modification during tunnel construction. The influence of grouting pressure of microcement grouting and micro pile to the existing bridge which is directly over the constructing tunnel is investigated. Three dimensional seepage flow-structure interactive analysis considering firm water pressure with full stages of construction including the construction of upper bridge, microcement grouting, micro pile and tunnel is performed. The settlement and tilting of the pier of existing bridge violate the design code and the reaction of the bridge are highly increased after grouting. The stress of tunnel bracings such as rockbolt and shotcrete also exceed the limit of the code. The pressure of microcement grouting is confined by bedrock and transmit to the surrounded soil and the upper bridge. Microcement grouting needs mid-high pressure to penetrate through weak fault plane and the pressure greatly influence the safety of the upper structure. It is important to decide and care the grouting pressure to improve weak fault plane directly under the existing structures and the pressure of microcement grouting should be considered in underground analysis.

A Study on STR Analysis According to the Method of Developing Latent Fngerprints Deposited on Non-Porous Surfaces in the Marine Environment (해양환경 내 비다공성 표면에 유류된 잠재지문 현출방법에 따른 STR 분석 연구)

  • Kim, Jin-Sun;Kim, Sea-In;Yoon, Hyun-Kyoung;Choo, Min-kyu
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.10
    • /
    • pp.733-741
    • /
    • 2022
  • Among the various evidence found in maritime crimes, fingerprints and DNA are very important in that they can identify a suspect. In this study, 5 types of non-porous surfaces (plastic, stainless, glass, ceramic, FRP), which are often found as evidence in the actual marine environment, were selected, and latent and blood fingerprints were passed down and immersed at the Donghae Maritime Police Station's exclusive pier for about 7 days. After that, DNA extraction, quantification, and STR profile were analyzed after fingerprint developing CA fumming method and 4 powder methods (Swedish black powder, Concentrated black powder, Supranano red powder, Dazzle orange powder). Among the fingerprint developing methods, when Supranano red powder was applied, a relatively high amount of DNA was found. As a result of STR profile analysis, an average of 16.8 to 9 loci were secured, and all 20 were confirmed in glass and ceramic materials. As a result of the study, it was possible to secure the STR profile by extracting and quantifying DNA after applying the fingerprint developing method to virtual evidence immersed for about 7 days, and further research is needed to secure the STR profile by analyzing DNA after applying various fingerprint developing methods such as VMD and SPR.

Experiment of Artificial Ladder for the Improve of Eel Ladder: II. About Pebble Size and Ladder Angles (뱀장어 전용어도 개선을 위한 인공어도 실험 II. 자갈 입자 및 각도에 대하여)

  • Kim, Jae Goo
    • Korean Journal of Ichthyology
    • /
    • v.34 no.2
    • /
    • pp.127-132
    • /
    • 2022
  • Most of the downstream of the river is blocked by beams, so fishways are required for the movement of conciliatory fish species and connection with the upstream. Therefore, it is very important as an ecological pier that can help free movement of fish. The three previously installed eel ladders use only brushes on the bottom. For find out the effect of the bottom material except to brush, experimented used model glass eel ladders to the ascent of glass eel. The eel ladder model was 1.2 m length, 0.3 m wide, and 0.1 m high, and three gravels of different particles were attached to the bottom of the fish ladder setting on the Geumgang Estuary Bank. The first model ladder was made of gravel with particles of 5 mm, and the second model ladder was made of gravel with particles of 2 mm. The third model ladder was made by solidifying with particles of 1 mm or less cement. All experiments were repeated 5 times for 1 hour. As a result of the experiment, the lower the angle, and the smaller the gravel particles, the more glass eels are ascended to the ladder, but the made of cement was nearly not ascent. The gravel-bottom model ladder has a lower discharge and flow rate than the brush ladder so more glass eels can ascent ladder, and if the glass eel ladder is improved through experiments applying various floor materials and variables in the future, more glass eels are going to ascent glass eel ladder.

Analysis on the Rigid Connections of the Drilled Shaft with the Cap for Multiple Pile Foundations (현장타설말뚝을 적용한 다주식 기초에서 말뚝과 캡의 강결합에 대한 분석)

  • Cho, Sung-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.61-73
    • /
    • 2008
  • Piles of a bridge pier are connected with the column through the pile cap (footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. Connection methods between pile heads and the pile cap are divided into two groups : rigid connections and hinge connections. Domestic design code has been specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However, some specifications prescribe that conservative results through investigations of both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which has high-quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) is unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the large diameter drilled shaft and the pile cap for Incheon Bridge which will be the longest bridge of Korea were investigated through the full modeling for rigid connection conditions.

A Study on the Power Converter Control of Utility Interactive Photovoltaic Generation System (계통 연계형 태양광 발전시스템의 전력변환기 제어에 관한 연구)

  • Na, Seung-Kwon;Ku, Gi-Jun;Kim, Gye-Kuk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.2
    • /
    • pp.157-168
    • /
    • 2009
  • In this paper, a photovoltaic system is designed with a step up chopper and single phase PWM(Pulse Width Modulation) voltage source inverter. Where proposed Synchronous signal and control signal was processed by one-chip microprocessor for stable modulation. The step up chopper operates in continuous mode by adjusting the duty ratio so that the photovoltaic system tracks the maximum power point of solar cell without any influence on the variation of insolation and temperature because solar cell has typical voltage and current dropping character. The single phase PWM voltage source the inverter using inverter consists of complex type of electric power converter to compensate for the defect, that is, solar cell cannot be developed continuously by connecting with the source of electric power for ordinary use. It can cause the effect of saving electric power. from 10 to 20[%]. The single phase PWM voltage source inverter operates in situation that its output voltage is in same phase with the utility voltage. In order to enhance the efficiency of photovoltaic cells, photovoltaic positioning system using sensor and microprocessor was design so that the fixed type of photovoltaic cells and photovoltaic positioning system were compared. In result, photovoltaic positioning system can improved 5% than fixed type of photovoltaic cells. In addition, I connected extra power to the system through operating the system voltage and inverter power in a synchronized way by extracting the system voltage so that the phase of the system and the phase of single-phase inverter of PWM voltage type can be synchronized. And, It controlled in order to provide stable pier to the load and the system through maintaining high lurer factor and low output power of harmonics.

Wintertime Extreme Storm Waves in the East Sea: Estimation of Extreme Storm Waves and Wave-Structure Interaction Study in the Fushiki Port, Toyama Bay (동해의 동계 극한 폭풍파랑: 토야마만 후시키항의 극한 폭풍파랑 추산 및 파랑 · 구조물 상호작용 연구)

  • Lee, Han Soo;Komaguchi, Tomoaki;Yamamoto, Atsushi;Hara, Masanori
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.5
    • /
    • pp.335-347
    • /
    • 2013
  • In February 2008, high storm waves due to a developed atmospheric low pressure system propagating from the west off Hokkaido, Japan, to the south and southwest throughout the East Sea (ES) caused extensive damages along the central coast of Japan and along the east coast of Korea. This study consists of two parts. In the first part, we estimate extreme storm wave characteristics in the Toyama Bay where heavy coastal damages occurred, using a non-hydrostatic meteorological model and a spectral wave model by considering the extreme conditions for two factors for wind wave growth, such as wind intensity and duration. The estimated extreme significant wave height and corresponding wave period were 6.78 m and 18.28 sec, respectively, at the Fushiki Toyama. In the second part, we perform numerical experiments on wave-structure interaction in the Fushiki Port, Toyama Bay, where the long North-Breakwater was heavily damaged by the storm waves in February 2008. The experiments are conducted using a non-linear shallow-water equation model with adaptive mesh refinement (AMR) and wet-dry scheme. The estimated extreme storm waves of 6.78 m and 18.28 sec are used for incident wave profile. The results show that the Fushiki Port would be overtopped and flooded by extreme storm waves if the North-Breakwater does not function properly after being damaged. Also the storm waves would overtop seawalls and sidewalls of the Manyou Pier behind the North-Breakwater. The results also depict that refined meshes by AMR method with wet-dry scheme applied capture the coastline and coastal structure well while keeping the computational load efficiently.