• Title/Summary/Keyword: high strength reinforcement

Search Result 836, Processing Time 0.025 seconds

The Experimental Study on Transverse Field Joint Method of Precast Road Deck Slab of Double Deck Tunnel in Great Depth (대심도 복층터널 프리캐스트 중간슬래브의 횡방향 현장이음방식에 대한 실험연구)

  • Lee, Doo-Sung;Kim, Bo-Yeon;Bae, Chul-Gi;Hur, Jae-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.23-32
    • /
    • 2017
  • The joints between precast PSC slabs of the intermediate road slab in double deck tunnel are inevitably generated in the road traffic vehicle traveling direction. Therefore, it is important to make the behavior of parts on the joint in one piece. The imtermediate road slab system of double deck tunnel in great depth proposed in this study will be constructed with precast PSC slab in order to minimize the construction period. And the joint connection between the precast slab has been developed in two methods: the 'Transverse tendon reinforcement method' and 'High strength bolts connection method'. Also, the experiments were performed for the full scale model in order to evaluate the performance of the intermediate road deck slab with two type joints systems, the structural stability was verified through the F.E.M analsysis. The results of static loading test and F.E.M analysis investigated a very stable behavior of intermediate road deck slab in double deck tunnel applying the joint methods developed in this study, in the cracks and deflections to satisfy the design standards of Highway Roads Bridges (2011), it was determined that there is no problem even servicebility.

A Study on Continuous Monitoring Reinforcement for Sales Audit Using Process Mining Under Big Data Environment (빅데이터 환경에서 프로세스 마이닝을 이용한 영업감사 상시 모니터링 강화에 대한 연구)

  • Yoo, Young-Seok;Park, Han-Gyu;Back, Seung-Hoon;Hong, Sung-Chan
    • Journal of Internet Computing and Services
    • /
    • v.17 no.6
    • /
    • pp.123-131
    • /
    • 2016
  • Process mining in big data environment utilize a number of data were generated from the business process. It generates lots of knowledge and insights regarding implementation and improvement of the process through the event log of the company's enterprise resource planning (ERP) system. In recent years, various research activities engaged with the audit work of company organizations are trying actively by using the maximum strength of the mining process. However, domestic studies on applicable sales auditing system for the process mining are insufficient under big data environment. Therefore, we propose process-mining methods that can be optimally applied to online and traditional auditing system. In advance, we propose continuous monitoring information system that can early detect and prevent the risk under the big data environment by monitoring risk factors in the organizations of enterprise. The scope of the research of this paper is to design a pre-verification system for risk factor via practical examples in sales auditing. Furthermore, realizations of preventive audit, continuous monitoring for high risk, reduction of fraud, and timely action for violation of rules are enhanced by proposed sales auditing system. According to the simulation results, avoidance of financial risks, reduction of audit period, and improvement of audit quality are represented.

An Experimental Study on Concrete Bond Behavior According to Grid Spacing of CFRP Grid Reinforcement (격자형 CFRP 보강재의 격자간격에 따른 콘크리트 부착거동에 대한 실험적 연구)

  • Noh, Chi-Hoon;Jang, Nag-Seop;Oh, Hongseob
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.6
    • /
    • pp.73-81
    • /
    • 2022
  • Recently, as the service life of structures increased, the load-carrying capacity of deteriorated reinforced concrete, where corrosion of reinforcing bars occurs due to various causes, is frequently decreased. In order to address this problem, many studies on the bond characteristic of FRP (Fiber Reinforced Polymer) bars with corrosion resistance, light weight and high tensile strength have been conducted, however there are not many studies on the bond characteristic of grid-typed CFRP embedded in concrete. Therefore, in order to evaluate the bond characteristics of grid-typed CFRP and its usability as a substitute for steel rebar, a pull-out test is performed using the longitudinal bond length and transverse grid length of the grid-typed CFRP as variables. Through the pull-out test, the bond load-slip curve of the grid-typed CFRP is derived, and the bond behavior is analyzed. The total bond load equation is proposed as the sum of the bond force of the longitudinal bond length and the shear force of the grid in the transverse direction. Also, expressing the area of the bond load-slip curve as total work, the change in dissipated energy with respect to the slip is analyzed to examine the effect of the tranverse grid on the bond force.

Study on the Occurrence of Tunnel Damage when a Large-scale Fault Zone Exists at the Top and Bottom of a Tunnel (대규모 단층대가 터널 상하부에 존재하는 조건에서 터널 변상 사례 연구)

  • Jeongyong Lee;Seungho Lee;Nagyoung Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.53-60
    • /
    • 2023
  • Recently, along with the improvement of high-speed rail and road design speed, the proportion of tunnel construction work is increasing proportionally. In particular, the construction of long tunnels is rapidly increasing due to the mountainous terrain of our country. In this way, due to the trend of tunnels becoming longer, it is difficult to design and construct tunnels by avoiding fault zones. In the case of tunnel construction in mountainous areas, ground investigation is often difficult even during design due to the topographical conditions, making precise ground investigation difficult, and as a result, the upper part of the tunnel is damaged during tunnel construction. When fault zones, which are vulnerable to weathering, exist, the stability of the tunnel during excavation is directly affected by the fault zone distribution, strength characteristics, and groundwater distribution range. In particular, when a fault zone is distributed in the upper part of a tunnel, damage such as tunnel collapse and excessive displacement may occur, and in order to prevent this in advance, countermeasures must be established through analysis of similar cases. Therefore, in this study, when a large-scale fault zone exists in the upper part of a tunnel, the relationship and characteristics of damage to the tunnel structure were analyzed.

Weed Occurrence and Yield of Rice in Transplanting Rice Culture with Paper Mulching (종이멀칭 이앙재배에서 잡초발생과 벼의 생육 및 수량)

  • Lee, B.W.;Cui, R.X.;Lee, H.L.
    • Korean Journal of Weed Science
    • /
    • v.17 no.4
    • /
    • pp.368-374
    • /
    • 1997
  • Investigated ware the decomposition of mulch paper, weed occurrence, and rice growth and yield in transplanting rice culture with paper mulching in 1996 and 1997. The mulch paper were developed from domestic old corrugated container. In the experiment of 1996 where 25 percent of nitrogen fertilizer was applied as tillering fertilizer at 15 days after transplanting, it took about 28 to 40 days for the mulch paper to reach 50 percent decomposition according to types of mulch paper and fertilizer amount. The decomposition was faster in 18kg N/10a fertilization plot than in 12kg N/10a fertilization plot, and slower in the mulch paper treated with polyamidepolyamine epichlorohydrin resin(PPE) for the reinforcement of wet strength than in the mulch paper without PPE. In the experiment of 1997 where nitrogen fertilizer was not applied at tillering stage and instead 70 percent of nitrogen fertilizer was supplied as basal fertilizer, it took more than 42 days for the mulch paper(PPF treated) to reach 50 percent decomposition. Paper mulching was found to be very effective in controlling the paddy weeds at early stage of rice growth, but the efficacy, of weed control decreased especially in the mulch paper without PPE at later stage of rite growth due to the occurrence of Ludwigia prostrata in 1996. Few weeds occurred even in non-mulched plot without herbicide in 1997, rending difficulties in evaluating the efficacy of mulch paper in weed control, However, it could be deduced from the durability of mulch paper that paper mulching would have had sufficient efficacy of weed control. Rice yield was only 185kg/10a in the plot without mulching and weed control, but 657kg/10a and 771kg/10a in the paper(PPE treated) mulching plot with 12kgN/10a and 18kgN/10a, respectively, in 1996. The paper mulching plot showed rice yield similar to the weed control plot with herbicide in 1997. It would be concluded that paper mulching could ensure effective weed control and as high yield as the conventional rice cultivation with herbicidal weed control if the corresponding amount of basal nitrogen fertilizer is increased instead of omitting the nitrogen fertilizer at tillering stage.

  • PDF

The structural analysis and design methods considering joint bursting in the segment lining (조인트 버스팅을 고려한 세그먼트 라이닝 구조해석 및 설계방법)

  • Kim, Hong-Moon;Kim, Hyun-Su;Jung, Hyuk-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1125-1146
    • /
    • 2018
  • Segment lining applied to the TBM tunnel is mainly made of concrete, and it requires sufficient structural capacity to resist loads received during the construction and also after the completion. When segment lining is design to the Limit State Design, both Ultimate Limit State (ULS) and Service Limit State (SLS) should be met for the possible load cases that covers both permanent and temporary load cases - such as load applied by TBM. When design segment lining, it is important to check structural capacity at the joints as both temporary and permanent loads are always transferred through the segment joints, and sometimes the load applied to the joint is high enough to damage the segment - so called bursting failure. According to the various design guides from UK (PAS 8810, 2016), compression stress at the joint surface can generate bursting failure of the segment. This is normally from the TBM's jacking force applied at the circumferential joint, and the lining's hoop thrust generated from the permanent loads applied at the radial joint. Therefore, precast concrete segment lining's joints shall be designed to have sufficient structural capacity to resist bursting stresses generated by the TBM's jacking force and by the hoop thrust. In this study, bursting stress at the segment joints are calculated, and the joint's structural capacity was assessed using Leonhardt (1964) and FEM analysis for three different design cases. For those three analysis cases, hoop thrust at the radial joint was calculated with the application of the most widely used limit state design codes Eurocode and AASHTO LRFD (2017). For the circumferential joints bursting design, an assumed TBM jack force was used with considering of the construction tolerance of the segments and the eccentricity of the jack's position. The analysis results show reinforcement is needed as joint bursting stresses exceeds the allowable tensile strength of concrete. This highlights that joint bursting check shall be considered as a mandatory design item in the limit state design of the segment lining.