• Title/Summary/Keyword: high speed railway (KTX)

Search Result 324, Processing Time 0.035 seconds

A Proposal on Calculation Model to Predict Environmental Noise Prediction Emitted by High Speed Trains (고속철도 환경소음예측을 위한 계산 모델 제안)

  • Cho, Dae-Seung;Cho, Jun-Ho;Kim, Jin-Hyeong;Jang, Kang-Seok;Yoon, Jae-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.10a
    • /
    • pp.843-848
    • /
    • 2011
  • Planning and construction of railway for high speed trains up to 400 km/h are recently driven in Korea. High speed train is one of the environment-friendly fastest mass transportation means but its noise generated by rolling, traction and aerodynamic mechanism can cause public complaints of residents nearby railways. To cost-effectively prevent the troublesome noise in a railway planning stage, the rational railway noise prediction method considering the characteristics of trains as well as railway structures should be required but it is difficult to find authentic methods for Korean high speed trains such as KTX and KTX-II. In this study, we propose a framework of our own railway noise prediction model emitted by Korean high speed trains over 250 km/h based on the recent research results carried out in EU countries. The model considers railway sound power level using several point sources distributed in heights as well as tracks, whose detail speed- and frequency-dependent emission characteristics of Korean high speed trains should be determined in near future by measurement or numerical analysis. The attenuation during propagation outdoors is calculated by the well-known ISO 9613-2 and auxiliary methods to consider undulated terrain and wind effect.

  • PDF

Rail Grinding Criteria of Kyeong-Bu High-Speed Line for Effective Rail Maintenance (레일유지관리 효율화를 위한 경부 고속선 레일 연마 기준(안))

  • Kim, Man-Cheol;Kang, Tae-Ku
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.272-279
    • /
    • 2008
  • The importance of maintenance of rail surface defects is increasing more according to the KTX operation. That is because during high speed operation of rolling stock, rail surface defects may cause shortened fatigue life of rail, acceleration of track degradation and reduced ride comfort. The paper was intended to study the establishment of rail grinding criteria of high-speed railway lines considering the KTX operation circumstances. For this, the specimens of UIC 60 rail on Kyeong-Bu high-speed operation lines were collected and they were tested for metallographic structure and measured for the hardness. As the factors affecting RCF causing the defects of rail surface, passing tonnage, running speed and track condition are considered.

Development of MAC layer of Network for KTX high-speed train system (고속 열차용 네트워크의 MAC 계층 개발)

  • Lee, Bum-Yong;Kim, Hyung-In;Jung, Sung-Youn;Park, Jae-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2015-2020
    • /
    • 2008
  • Real-time communication network is important for KTX high speed train system because small problem can make a huge accident. Communication network for KTX high speed train system consists of IEEE 802.4 token bus network and FM0 encoding. The network device is developed by using MC68824 TBC, MC68185 TPM and MC68020 MPU. The network device make available to analysis of the network protocol among vehicles for Kyung-Boo high-speed train system.

  • PDF

Study on the mutual interference of mixed mode operation between KTX and AREX train at the airport linked line (공항철도연계 구간의 고속열차(KTX)와 전동열차(AREX) 혼용운용에 따른 ATP지상설비간 상호간섭 영향에 관한 연구)

  • Kim, Su-Bong;Song, In-Kuen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.23-30
    • /
    • 2016
  • ccording to the airport railroad linkage facility expansion project constructing a connecting line to the airport railway and improving the signal system and Gyeongui Susaek Station, a high-speed train is able to run directly from Gyeongbu and Honam to the airport railway. According to mixed operation of high-speed Korea Train Express (KTX) and Airport Railroad Express (AREX) trains, to establish ERTMS/ETCS L1 ATP to operate the KTX train, the signaling system of the AREX train is the same as the existing ATC/ATO, but its operation became impossible because the high-speed train causes mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment." Thus, it was necessary to have a supplemental technical interference analysis comparing the characteristics of the AREX beacon and the KTX balise. So, we resolve the problems of mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment" with a test using an actual train, and we confirm the technical validity with three types of test module.

Analysis on Running Safety for KTX Vehicle (KTX차량의 주행 안전성 해석)

  • Kim, Jae-Chul;Ham, Young-Sam
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.473-479
    • /
    • 2007
  • Lateral vibration at the tail of KTX train was found during the acceptance test. In order to settle the problem of lateral vibration, the wheel conicity was changed 1/40 to 1/20. However, we should evaluate the running safety of vehicle with 1/20 wheel conicity because modification of wheel conicity may cause the running performance to be worse and critical speed to reduce. In this paper, we calculate critical speed of KTX bogie as wheel conicity increase and analyze the running safety for KTX that has 20 car trainset formation using VAMPIRE. and compare with the test results of KHST to validate analysis results on high speed line. A analysis results show that critical speed of 0.3 wheel conicity is over 375km/h and curving performance of 1/20wheel conicity is better than 1/40. Also, we examinate the running performance of KTX to check out possibility to increase speed of KTX on conventional line. A analysis results show that it is possible to increase up to 10% the speed of KTX on tangent line but KTX on a curved line should be operated with the speed of conventional train.

A Study on the KTX's Fare System in Korea (우리나라 고속철도 운임체계 개편방안 연구)

  • Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.756-760
    • /
    • 2009
  • In 2010, the second phase of Kyeongbu KTX high speed train construction is expected to be completed. Therefore KTX's fare system need to be further improved. In this study, analyze the present condition and problems whit applying the existing fare system into the second phase of KTX high speed train, and then suggests improvement measures that divide KTX's fare system with distance-based fare and service-based fare.

  • PDF

Measured Data of the Contact Wire Uplift Amount at KTX running (KTX 주행시 전차선 압상량 측정 결과)

  • Kwon Sam-Young;Cho Yong-Hyun;Lee Ki-Won;Ahn Young-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1372-1377
    • /
    • 2004
  • The contact wire uplift amount was measured for the conventional and the high speed catenary during KTX dynamic test period. The contact wire uplift amount is considered as a important parameter in determining and designing of the specific catenary. The measurements were conducted in wayside and onboard of KTX through the high speed camera and the current collection video monitoring system installed in KTX roof. This paper describes the measured results.

  • PDF

A Study of Dynamic Analysis of Wheel Force Spectrum between Road and PSC Bridge tracks for the KTX Safety Evaluation (KTX 차량의 주행안정성 평가를 위한 노상과 PSC 교량 상의 윤하중분포 동적해석 연구)

  • Lee, Dong-Jun;Oh, Soon-Taek;Sim, Young-Woo;Yun, Jun-Kwan;Kim, Han-Su
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.793-799
    • /
    • 2011
  • A comprehensive analysis of wheel force spectrum is conducted to provide the KTX safety evaluation with structural behaviour of Pre-Stressed Concrete (PSC) box bridge due to various high speeds. The wheel spectrum for KTX locomotive running over road and PSC bridge tracks is compared using irregular track responses with numerical models of 170m approach road track and 40m span length of PSC box bridge The high-speed railway locomotive is used as 38-degree of freedom system. Three displacements (vertical, lateral, and longitudinal) and three rotational components (pitching, rolling, and yawing) for one car-body and two bogies are considered in the 38-degree of freedom model. Three dimensional frame element of finite element method (FEM) is used to model of the simply supported PSC box bridge. The irregulation of rail-way is derived using the experiential spectrum density function under assumption of twelve level tracks conditions based on the normal probability procedure. The dynamic analyses by Runge-Kutta method which are able to analyze the high frequency wheel force spectrum. A dynamic behaviour of KTX due to high speeds until 450km/h developing speed with relative time is analysed and compared the characteristics running over the road and PSC box bridge tracks. Finally, the KTX integrated evaluation method of safety between high speed train and bridge is presented.

  • PDF

Fault Diagnosis of a High-speed Railway Reduction Unit Using Analysis of Vibration Characteristics (고속철도차량 감속구동장치의 이상진단을 위한 진동특성분석)

  • Ji, Hae Young;Lee, Kang Ho;Kim, Jae Chul;Lee, Dong Hyoung;Moon, Kyoung Ho
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.26-31
    • /
    • 2013
  • The reduction unit is one of the most important components for railway vehicles because the torque of the motor must be transmitted to the wheels of the vehicle by the reduction unit. The faults in the reduction units of high-speed trains are caused by damage such as gear, fatigue. These have serious impacts on safety of the train during operation. To address this development of a system for monitoring, fault diagnosis of the reduction unit is needed to keep the vehicle running safely. Before that can be accomplished, it is most important to understand the vibration characteristics of the reduction unit in a normal state. Vibration diagnosis technology using characteristic-analysis of vibration waveform and frequency is known to be the most effective method for fault diagnosis. In this paper, we analyzed the vibration characteristics of the reduction units two Korean high-speed trains (KTX and KTX II), under normal conditions, by two test methods (driving gear test, full-vehicle test).

Improvement of Structure to Prevent Water Infiltration and oil leakage for Reduction Units of KTX (KTX 감속구동장치 수분유입 및 누유 방지를 위한 구조개선)

  • Lee, Min-Soo;Kim, Yong-Kee
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.20-25
    • /
    • 2007
  • KTX is being operated on Kyung-Pu High Speed Railroad Line and Ho-Nam Railroad Line from April 2004. Reduction units is occurring water infiltration at heavy snow and oil leakage because of labyrinth structure. This paper describes design method and evaluation technology to improve structure to prevent water infiltration and oil leakage for reduction units of KTX. This reduction units need high power and high speed to run and they have to make optimal lubricant without change current interface.

  • PDF