• Title/Summary/Keyword: hazard monitoring

Search Result 286, Processing Time 0.029 seconds

The Effect of Rainfall, Irrigation and Fertilizer Application on Water Properties of Pond in Golf Course (골프코스에서 강수량, 관추량 및 시비관리가 연못의 수질 변화에 미치는 영향)

  • Kim, Young-Sun;Ham, Suon-Kyu
    • Asian Journal of Turfgrass Science
    • /
    • v.23 no.1
    • /
    • pp.1-8
    • /
    • 2009
  • This study was conducted to investigate the effect of rainfall, irrigation and fertilizer application on water qualities of pond in golf course from May in 2007 year to November in 2008 year. For survey of water quality, it was sampled at $10{\sim}12$ sites(irrigation site 2, drainage site 3, and hazard site $5{\sim}7$) of SKY72 G.C and evaluated with analysis items such as pH, electrical conductivity(EC), DO, SS, T-N, $PO_4$-P, K, Ca, Mg, Na, SAR, BOD and COD. Results obtained were summarized as follows: The value of pH, EC, DO, T-N, P04-P, K, Ca, Mg, Na and SAR was in dry season, but those of SS, BOD and COD in the rainy season. N and P concentration of pond water showed $1.2{\sim}28.8mg/L$ and $0.005{\sim}0.172mg/L$, respectively, and so it was higher than eutrophication level of lakes and marshes recommended by the Ministry of Environment in Korea. As a reault of correlation analysis, EC in the water was significantly(P<0.01) related items such as K, Ca, Mg, Na, SAR and salinity, and SS significantly(P<0.05) BOD and COD. In comparison with a corelation between respective analysis items and rainfall amount, SAR was significantly(P<0.01) positive but T-N negative(P<0.01). As compared with corelation between respective items and irrigation amount, pH was significantly(P<0.01) positive but T-N(P<0.05) and BOD(P<0.01) negative. When it was applied to N, $P_2O_5$ and $K_2O$ in golf course, N and $K_2O$ significantly affected water qualities of pond(P<0.01). These results suggested that a pond water in golf course was affected by the fertilizer application, rainfall and irrigation and EC was adequate monitoring indicator for the evaluating water quality of pond by chemicals influent.

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF

Monitoring Bacillus cereus and Aerobic Bacteria in Raw Infant Formula and Microbial Quality Control during Manufacturing (영.유아용 식품원료의 Bacillus cereus와 일반세균 모니터링 및 제조공정 중 미생물 품질제어)

  • Jung, Woo-Young;Eom, Joon-Ho;Kim, Byeong-Jo;Ju, In-Sun;Kim, Chang-Soo;Kim, Mi-Ra;Byun, Jung-A;Park, You-Gyoung;Son, Sang-Hyuck;Lee, Eun-Mi;Jung, Rae-Seok;Na, Mi-Ae;Yuk, Dong-Yeon;Gang, Ji-Yeon;Heo, Ok-Sun;Yoon, Min-Ho
    • Korean Journal of Food Science and Technology
    • /
    • v.42 no.4
    • /
    • pp.494-501
    • /
    • 2010
  • The purpose of this study was to examine the presence of Bacillus cereus, aerobic bacteria and coliforms in the raw material of infant formulas and investigate the manufacturing process in terms of microbial safety. Among ten kinds of raw infant formula material samples (n=20), Bacillus cereus appeared in two (n=4). Aerobic bacteria were not detected in raw infant formula material or maximum 4.15 log CFU/g. Eleven species of aerobic bacteria were isolated and 76% of them were Sphingomonas paucimobilis, Pseudomonas fluorescens, Rhizobium radiobactor, or Stenotrophomonas maltophilia. A Pearson's correlation analysis revealed that the most influential factors for detecting Bacillus cereus were aerobic bacteria and coliforms. In other words, when the measured values of aerobic bacteria and coliforms were higher, the possibility that Bacillus cereus would appear increased. In a regression model to predict Bacillus cereus, the rate of appearance was correlated with aerobic bacteria and coliforms, and its contribution rate for effectiveness was 86%. Improving microbial quality control by pasteurization, spray dry, popping and extrusion resulted in a decrease in the numbers of Bacillus cereus, aerobic bacteria and coliforms in the raw materials. The results suggest that a hazard analysis and critical control point system might be effective for reducing microbiological contamination.

Trace Metal Contamination and Solid Phase Partitioning of Metals in National Roadside Sediments Within the Watershed of Hoidong Reservoir in Pusan City (부산시 회동저수지 집수분지 내 국도도로변 퇴적물의 미량원소 오염 및 존재형태)

  • Lee Pyeong-Koo;Kang Min-Joo;Youm Seung-Jun;Lee In-Gyeong;Park Sung-Won;Lee Wook-Jong
    • Journal of Soil and Groundwater Environment
    • /
    • v.11 no.5
    • /
    • pp.20-34
    • /
    • 2006
  • This study was undertaken to assess the anthropogenic impact on trace metal concentrations (Zn, Cu, Pb, Cr, Ni, and Cd) of roadside sediments (N = 70) from No.7 national road within the watershed of Hoidong Reservoir in Pusan City and to estimate the potential mobility of selected metals using sequential extraction. We generally found high concentrations of metals, especially Zn, Cu and Pb, affected by anthropogenic inputs. Compared to the trace metal concentrations of uncontaminated stream sediments, arithmetic mean concentrations of roadside sediments were about 7 times higher for Cu, 4 times higher for Zn, 3 times higher for Pb and Cr and, 2 times higher for Ni and As. Speciation data on the basis of sequential extraction indicate that most of the trace metals considered do not occur in significant quantities in the exchangeable fraction, except for Cd and Ni whose exchangeable fractions are appreciable (average 29.3 and 25.8%, respectively). Other metals such as Zn (51.4%) and Pb (45.2%) are preferentially bound to the reducible fraction, and therefore they can be potentially released by a pH decrease and/or redox change. Copper is mainly found in the organic fraction, while Cd is highest in the exchangeable fraction, and Cr and Ni in the residual fraction. Considering the proportion of metals bound to the exchangeable and carbonate fractions, the comparative mobility of metals probably decreases in the order of Cd>Ni>Pb>Zn>Cr>Cu. Although the total concentration data showed that Zn was typically present in potentially harmful concentration levels, the data on metal partitioning indicated that Cd, Ni and Pb pose the highest potential hazard for runoff water. As potential changes of redox state and pH may remobilize the metals bound to carbonates, amorphous oxides, and/or organic matter, and may release and flush them through drain networks into the watershed of Hoidong Reservoir, careful monitoring of environmental conditions appears to be very important.

Monitoring and Safety Assessment of Pesticide Residues and Sulfur Dioxide on Functional Rice Products (기능성 쌀의 잔류농약 및 이산화황 안전성 실태조사)

  • Lee, You-Jin;Park, Myung-Ki;Kim, Ki-Yu;Park, Eun-Mi;Kang, Heung-Gyu;Lim, Ji-Hyun;Cho, Wook-Hyun;Kim, Youn-Ho;Lee, Sun-Young;Yong, Kum-Chan;Yoon, Mi-Hye
    • Journal of Food Hygiene and Safety
    • /
    • v.32 no.6
    • /
    • pp.493-499
    • /
    • 2017
  • This study was conducted to monitor the current status of pesticide residues and sulfur dioxide in a total of 91 functional rice products from February to October 2016. Multi class pesticide multiresidue methods of 220 pesticides was performed by the GC/ECD, GC/NPD, GC/TOF/MS, LC/PDA, and LC/FLD. As a result of analysis, the pesticides were detected in 3 samples, representing a detection rate of 3.3%. The kind of pesticides was propiconazole and isoprothiolane used for germicide in agriculture or plant growth regulator purposes. The detected levels were 0.0340~0.0566 mg/kg, which were under the MRL (Maximum Residues Limits). The contents of sulfur dioxide in 91 samples by the Monier-Williams method were not detected. Risk assessment of pesticides evaluated using human health exposure with the ratio of EDI (Estimated daily intake) to ADI (Acceptable daily intake). %ADI (the ratios of EDI to ADI) were 0.24~1.25% with safety level.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF